Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S2-175362 Update 5GS to EPS handover procedure pCR China Telecom 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175446 Clarifications on 5GC-EPC Interworking Aspects related to UDM/HSS pCR Ericsson 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

merged [WTS] [JSN]
S2-175483 Clarifications for HO procedure from 5GS to EPC with SR UE using N26 pCR

revised to S2-176104

China Mobile, CATT, CATR, China Unicom, China Telecom, Huawei, ZTE, OPPO, vivo 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175517 P-CR 23.501 Clarification to interworking without N26 pCR

revised to S2-176054

LG Electronics, NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175518 P-CR 23.501 SR without N26 interface during connected mode pCR LG Electronics 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

merged [WTS] [JSN]
S2-175557 Discussion on UE behaviors when interworking is performed pCR Huawei 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175562 Clarification on description without N26 interface pCR Huawei 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

merged [WTS] [JSN]
S2-175588 TS 23.502: Handover of PDU sessions to EPC pCR Qualcomm Incorporated 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175589 TS 23.501: Combined EPS/IMSI mobility in dual registration mode pCR

revised to S2-176055

Qualcomm Incorporated 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175736 SR UE in networks with no-N26 IWK procedure pCR NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175737 Removing EN about optimization for no-N26 SR UE mobility pCR NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175738 Allocation of PDU Session ID for interworking pCR

revised to S2-176144

NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175739 No-N26 Interworking Procedures pCR

revision of S2-175156

NTT DOCOMO 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175740 Handling of MME and AMF registration in HSS+UDM for IWK pCR

revised to S2-176102

NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175741 One or two indicators for 5GC discussion NTT DOCOMO Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175742 Comparison of solutions for EBI allocation discussion NTT DOCOMO, Intel Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175747 Mobility to EPC without established PDU sessions (no support for N26) pCR InterDigital Inc. 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175764 Smooth UE IRAT redirection pCR T-Mobile USA INC 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

merged [WTS] [JSN]
S2-175765 Smooth UE IRAT redirection pCR T-Mobile USA INC 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175808 TAU procedure from 5GS to 4G with SR UE using Nx pCR China Mobile 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175809 Adding support for N1 UE supporting dual connectivity pCR HTC 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-175811 Discussion On support of Dual Registration mode UE pCR HTC 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175818 Update to Dual Registration procedure pCR HTC 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175819 Interworking procedure when UE has LADN PDU or Ethernet PDU session pCR HTC 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175829 Selectively handover GBR bearers from 5GS to EPC with SR UE using N26 pCR China Mobile 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175875 5GS/EPS interworking in SRM without N26 interface pCR MediaTek Inc., Telecom Italia 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

merged [WTS] [JSN]
S2-175877 Discussion on EPS bearer ID allocation discussion CATT, China Mobile, CATR, China Unicom, China Telecom, Huawei, ZTE, OPPO, vivo Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175879 23.501 pCR: Discussion and proposal for the idle mobility without N26 pCR ZTE 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

merged [WTS] [JSN]
S2-175880 23.502 P-CR: Discussion and proposal on the EBI and PDU session ID allocation pCR ZTE 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175881 23.502 P-CR on idle mobility procedure for SR mode UE and network with N26 pCR ZTE 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175882 23.501 P-CR on resolving ENs in the 5.17 Interworking and Migration pCR

revised to S2-176051

ZTE 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175883 23.502 P-CR on 4G - 5G handover procedure correction pCR ZTE 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175885 Closing Editor's notes on MT services for Dual Registration mode pCR

revised to S2-176052

Intel 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175886 Avoidance of TAU failure in interworking without N26 interface for SR-mode UE pCR

revised to S2-176050

Intel 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175887 Support for subscription- or deployment-based RAT or CN restrictions pCR

revised to S2-176105

Intel 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175888 TS 23.501: Support for Ethernet and unstructured PDU session types in EPC pCR Qualcomm Incorporated 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

noted [WTS] [JSN]
S2-175892 QoS mapping for 5GC-EPC interworking pCR

revision of S2-174554

Intel, NTT DOCOMO, Nokia, Alcatel-Lucent Shanghai Bell 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-175894 Clarification on N26 hole and corresponding corrections pCR

revised to S2-176138

CATT 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-175902 Indirect data forwarding for 5GS to EPS handover pCR

revision of S2-174585

CATT 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-176006 Interworking for a dual-registration UE pCR Samsung 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

merged [WTS] [JSN]
S2-176007 Interworking procedure for a dual-registration UE_ EPC to 5GC pCR Samsung 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-176008 Interworking procedure for a dual-registration UE_ 5GC to EPC pCR Samsung 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

not treated [WTS] [JSN]
S2-176049 Question for show of hands on EPS bearer ID allocation other

revised to S2-176103

NTT DOCOMO S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176050 Avoidance of TAU failure in interworking without N26 interface for SR-mode UE pCR

revision of S2-175886

revised to S2-176136

Intel, Huawei, MediaTek, Telecom Italia, LG Electronics, ZTE 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176051 23.501 P-CR on resolving ENs in the 5.17 Interworking and Migration pCR

revision of S2-175882

revised to S2-176135

ZTE 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176052 Closing Editor's notes on MT services for Dual Registration mode pCR

revision of S2-175885

revised to S2-176141

Intel 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176054 P-CR 23.501 Clarification to interworking without N26 pCR

revision of S2-175517

revised to S2-176137

LG Electronics, NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176055 TS 23.501: Combined EPS/IMSI mobility in dual registration mode pCR

revision of S2-175589

revised to S2-176140

Qualcomm Incorporated 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176102 Handling of MME and AMF registration in HSS+UDM for IWK pCR

revision of S2-175740

revised to S2-176142

NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176103 Question for show of hands on EPS bearer ID allocation other

revision of S2-176049

NTT DOCOMO S2-122

AI: 6.5.9

endorsed [WTS] [JSN]
S2-176104 Clarifications for HO procedure from 5GS to EPC with SR UE using N26 pCR

revision of S2-175483

revised to S2-176134

China Mobile, CATT, CATR, China Unicom, China Telecom, Huawei, ZTE, OPPO, vivo, InterDigital Inc 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176105 Support for subscription- or deployment-based RAT or CN restrictions pCR

revision of S2-175887

revised to S2-176139

Intel, T-Mobile US 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176134 Clarifications for HO procedure from 5GS to EPC with SR UE using N26 pCR

revision of S2-176104

revised to S2-176145

China Mobile, CATT, CATR, China Unicom, China Telecom, Huawei, ZTE, OPPO, vivo, InterDigital Inc 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176135 23.501 P-CR on resolving ENs in the 5.17 Interworking and Migration pCR

revision of S2-176051

ZTE 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176136 Avoidance of TAU failure in interworking without N26 interface for SR-mode UE pCR

revision of S2-176050

Intel, Huawei, MediaTek, Telecom Italia, LG Electronics, ZTE 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176137 P-CR 23.501 Clarification to interworking without N26 pCR

revision of S2-176054

LG Electronics, NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176138 Clarification on N26 hole and corresponding corrections pCR

revision of S2-175894

revised to S2-176143

CATT 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176139 Support for subscription- or deployment-based RAT or CN restrictions pCR

revision of S2-176105

Intel, T-Mobile US 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176140 TS 23.501: Combined EPS/IMSI mobility in dual registration mode pCR

revision of S2-176055

Qualcomm Incorporated 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176141 Closing Editor's notes on MT services for Dual Registration mode pCR

revision of S2-176052

Intel 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176142 Handling of MME and AMF registration in HSS+UDM for IWK pCR

revision of S2-176102

NTT DOCOMO, Ericsson 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176143 Clarification on N26 hole and corresponding corrections pCR

revision of S2-176138

revised to S2-176698

CATT 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

revised [WTS] [JSN]
S2-176144 Allocation of PDU Session ID for interworking pCR

revision of S2-175738

NTT DOCOMO 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176145 Clarifications for HO procedure from 5GS to EPC with SR UE using N26 pCR

revision of S2-176134

China Mobile, CATT, CATR, China Unicom, China Telecom, Huawei, ZTE, OPPO, vivo, InterDigital Inc 23.502 0.5.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]
S2-176698 Clarification on N26 hole and corresponding corrections pCR

revision of S2-176143

CATT 23.501 1.2.0 5GS_Ph1 Rel-15 S2-122

AI: 6.5.9

approved [WTS] [JSN]

65 documents (0.37158298492432 seconds)