Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S2-176837 LS from CT WG1: Reply LS on NR Idle Mode procedures LS in

source LS: C1-173749

LS To: SA WG2, RAN WG2, SA WG1

CT WG1 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-176893 Corrections and clarifications on RRC_Inactive pCR

revised to S2-177922

Intel, Qualcomm Inc. 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-176959 Correction for Periodical RAN Notification Area Update pCR OPPO 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

merged [WTS] [JSN]
S2-176960 UE Capability for CM-Inactive State pCR

revised to S2-177594

OPPO 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-176961 CN Assiated Information to RAN Paging Occasion Calculation pCR

revised to S2-177597

OPPO 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-176962 Data Forwording in Case of RAN Paging Failure pCR OPPO 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-176965 Access Control for CM-Inactive State pCR

revised to S2-177925

Guangdong OPPO Mobile Telecom. 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-176991 Rechability improvement handlling for RRC inactive pCR

revised to S2-177595

Ericsson 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-176992 RRC-Inactive State- New procedures in 23.502 pCR Ericsson, Verizon, Cisco 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

postponed [WTS] [JSN]
S2-176995 Finalizing the UE Reachability Procedure with RRC Inactive handling (OI#13) pCR

revised to S2-177596

Ericsson 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177075 Avoiding delay in mobility management procedures due to I-UPF insertion / relocation when Critical Communication services are used. pCR

revised to S2-177921

Huawei, HiSilicon 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177146 TS 23.501:clarification on RRC Inactive pCR

revised to S2-177923

Huawei, HiSilicon 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177185 LS from RAN WG2: Reply LS on coexistence between RRC inactive and dual connectivity LS in

source LS: R2-1712063

LS To: SA WG2

RAN WG2 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-177202 TS 23.501: RRC Inactive UE capability pCR

revision of S2-175587

Qualcomm Incorporated, LG Electronics, Huawei 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

merged [WTS] [JSN]
S2-177245 On Xn and RRC INACTIVE discussion Nokia, Nokia Shanghai Bell Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-177294 TS 23.502: RRC Inactive inter-RAN node signalling with no Xn. pCR Qualcomm Incorporated 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

postponed [WTS] [JSN]
S2-177308 23.501 N2 Context release for RRC inactive UEs pCR

revised to S2-177926

CATT 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177309 23.502 N2 Context release for RRC inactive UEs pCR

revised to S2-177927

CATT 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177338 P-CR 23.501 RRC Inactive cancellation pCR

revised to S2-178623

LG Electronics 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-177339 23.502 Clarification on RRC Inactive procedure pCR

revised to S2-177924

LG Electronics 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177341 Add NAS Signalling Connection Release Cause due to RAN Paging Failure pCR OPPO 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-177410 TS 23.501 LADN handling in RRC inactive state pCR Huawei, HiSilicon 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-177411 TS 23.502 LADN handling in RRC inactive state pCR Huawei, HiSilicon 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-177483 23.501: Remove Editor's note in Section 5.3.3.2.5 CM-CONNECTED with RRC inactive state pCR ITRI 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

merged [WTS] [JSN]
S2-177509 RAN processing of RRC resume failure pCR

revised to S2-177928

Nokia, Nokia Shanghai Bell 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177535 TS 23.502: Resolving the EN in connection resume procedure pCR Huawei, HiSilicon 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

merged [WTS] [JSN]
S2-177539 23.501: UE indication of RRC Inactive support pCR Lenovo, Motorola Mobility 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

merged [WTS] [JSN]
S2-177541 23.501: RAN paging failure handling update pCR Lenovo, Motorola Mobility 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-177542 23.502: RAN paging failure handling update pCR Lenovo, Motorola Mobility 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

not treated [WTS] [JSN]
S2-177594 UE Capability for CM-Inactive State pCR

revision of S2-176960

OPPO, CATT, Huawei, Intel, ITRI, Lenovo, Motorola Mobility, LG Electronics, Qualcomm Incorporated 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

noted [WTS] [JSN]
S2-177595 Rechability improvement handlling for RRC inactive pCR

revision of S2-176991

Ericsson, Vodafone 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-177596 Finalizing the UE Reachability Procedure with RRC Inactive handling (OI#13) pCR

revision of S2-176995

revised to S2-177967

Ericsson 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177597 CN Assiated Information to RAN Paging Occasion Calculation pCR

revision of S2-176961

OPPO, LG Electronics 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-177921 Avoiding delay in mobility management procedures due to I-UPF insertion / relocation when Critical Communication services are used. pCR

revision of S2-177075

revised to S2-177968

Huawei, HiSilicon 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177922 Corrections and clarifications on RRC_Inactive pCR

revision of S2-176893

Intel, Qualcomm Inc., OPPO 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-177923 TS 23.501:clarification on RRC Inactive pCR

revision of S2-177146

Huawei, HiSilicon 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-177924 23.502 Clarification on RRC Inactive procedure pCR

revision of S2-177339

LG Electronics, Huawei, HiSilicon 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-177925 Access Control for CM-Inactive State pCR

revision of S2-176965

OPPO 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-177926 23.501 N2 Context release for RRC inactive UEs pCR

revision of S2-177308

revised to S2-178120

CATT 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177927 23.502 N2 Context release for RRC inactive UEs pCR

revision of S2-177309

revised to S2-178122

CATT 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177928 RAN processing of RRC resume failure pCR

revision of S2-177509

Nokia, Nokia Shanghai Bell 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-177929 [DRAFT] LS on UE Capability indication for RRC Inactive state LS out

LS To: RAN WG2

revised to S2-178168

SA WG2 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177967 Finalizing the UE Reachability Procedure with RRC Inactive handling (OI#13) pCR

revision of S2-177596

revised to S2-178121

Ericsson 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-177968 Avoiding delay in mobility management procedures due to I-UPF insertion / relocation when Critical Communication services are used. pCR

revision of S2-177921

Huawei, HiSilicon 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-178120 23.501 N2 Context release for RRC inactive UEs pCR

revision of S2-177926

CATT 23.501 1.4.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-178121 Finalizing the UE Reachability Procedure with RRC Inactive handling (OI#13) pCR

revision of S2-177967

revised to S2-178149

Ericsson 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-178122 23.502 N2 Context release for RRC inactive UEs pCR

revision of S2-177927

CATT 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]
S2-178149 Finalizing the UE Reachability Procedure with RRC Inactive handling (OI#13) pCR

revision of S2-178121

revised to S2-178173

Ericsson 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

revised [WTS] [JSN]
S2-178168 [DRAFT] LS on UE Capability indication for RRC Inactive state LS out

LS To: RAN WG2

revision of S2-177929

SA WG2 Rel-15 S2-123

AI: 6.5.7.5

withdrawn [WTS] [JSN]
S2-178173 Finalizing the UE Reachability Procedure with RRC Inactive handling (OI#13) pCR

revision of S2-178149

Ericsson 23.502 1.2.0 5GS_Ph1 Rel-15 S2-123

AI: 6.5.7.5

approved [WTS] [JSN]

50 documents (0.34374904632568 seconds)