Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-175030 Minutes of Study on management aspects of virtualized network functions that are part of the NR report Rapporteur (Intel) S5-115

AI: 6.5.6

noted [WTS] [JSN]
S5-175165 pCR TR 32.864 Add UC on providing location information of non-virtualized part of gNB pCR

revised to S5-175441

Intel Finland Oy 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

revised [WTS] [JSN]
S5-175166 pCR TR 32.864 Add potential solution for providing location of non-virtualized part of gNB to NFVO pCR

revised to S5-175442

Intel Finland Oy 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

revised [WTS] [JSN]
S5-175174 pCR 32.864 editor note cleanup pCR

revised to S5-175443

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

revised [WTS] [JSN]
S5-175175 pCR 32.864 add a UC for connecting gNB-CU to 5GC nodes pCR

revised to S5-175444

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

revised [WTS] [JSN]
S5-175176 pCR 32.864 alternative solution for transport network requirements update pCR

revised to S5-175445

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

revised [WTS] [JSN]
S5-175177 pCR 32.864 Add potential solution for adding VNFFGD and adding VNFFGs for the gNB pCR

revised to S5-175446

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

revised [WTS] [JSN]
S5-175178 pCR 32.864 add gap related to adding VNFFG pCR

revised to S5-175447

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

revised [WTS] [JSN]
S5-175179 pCR 32.864 revised conclusion pCR

revised to S5-175448

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

revised [WTS] [JSN]
S5-175284 pCR TR 32.864 Add UC on scaling the virtualized part of gNB for adapting to the network capacity pCR China Mobile Com. Corporation 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175441 pCR TR 32.864 Add UC on providing location information of non-virtualized part of gNB pCR

revision of S5-175165

Intel Finland Oy 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175442 pCR TR 32.864 Add potential solution for providing location of non-virtualized part of gNB to NFVO pCR

revision of S5-175166

Intel Finland Oy 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175443 pCR 32.864 editor note cleanup pCR

revision of S5-175174

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175444 pCR 32.864 add a UC for connecting gNB-CU to 5GC nodes pCR

revision of S5-175175

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175445 pCR 32.864 alternative solution for transport network requirements update pCR

revision of S5-175176

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175446 pCR 32.864 Add potential solution for adding VNFFGD and adding VNFFGs for the gNB pCR

revision of S5-175177

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175447 pCR 32.864 add gap related to adding VNFFG pCR

revision of S5-175178

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175448 pCR 32.864 revised conclusion pCR

revision of S5-175179

Intel 32.864 1.0.0 FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]
S5-175486 Draft TR 32.864 draft TR Intel FS_MA_RNVNF Rel-15 S5-115

AI: 6.5.6

approved [WTS] [JSN]

19 documents (0.37050104141235 seconds)