Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-161565 Uplink Simulation results for e-MTC discussion

revised to R4-162709

Samsung LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

revised [WTS] [JSN]
R4-161603 Cat-M1 PRACH Initial Simulation Results discussion

revised to R4-162704

Nokia LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

revised [WTS] [JSN]
R4-161604 Cat-M1 PUCCH Initial Simulation Results discussion

revised to R4-162705

Nokia LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

revised [WTS] [JSN]
R4-161605 Cat-M1 PUSCH Initial Simulation Results discussion

revised to R4-162706

Nokia LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

revised [WTS] [JSN]
R4-161606 CR: Cat-M1 PRACH Performance Requirements CR

revised to R4-162747

Nokia 36.104 13.3.0 CR#765 catB LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

revised [WTS] [JSN]
R4-161607 CR: Cat-M1 PUCCH Performance Requirements CR

revised to R4-162792

Nokia 36.104 13.3.0 CR#766 catB LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

revised [WTS] [JSN]
R4-161608 CR: Cat-M1 PUSCH Performance Requirements CR Nokia 36.104 13.3.0 CR#767 catB LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-161859 Cat-M1 PRACH simulation result discussion Ericsson LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-161860 Cat-M1 PUCCH simulation result discussion Ericsson LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-161861 Cat-M1 PUSCH simulation result discussion Ericsson LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-161998 Discussion and simulation results for eMTC PRACH discussion Huawei, HiSilicon LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-161999 Draft CR for eMTC PRACH performance requirements draftCR Huawei LTE_MTCe2_L1-Perf Rel-14 R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162000 Discussion and simulation results for eMTC PUCCH discussion Huawei, HiSilicon LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162001 Draft CR for eMTC PUCCH performance requirements draftCR Huawei LTE_MTCe2_L1-Perf Rel-14 R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162002 Discussion and simulation results for eMTC PUSCH discussion Huawei, HiSilicon LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162003 Draft CR for eMTC PUSCH performance requirements draftCR Huawei LTE_MTCe2_L1-Perf Rel-14 R4-78

AI: 6.5.4

revised [WTS] [JSN]
R4-162004 Discussion on conformance testing for eMTC BS discussion Huawei, HiSilicon LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

withdrawn [WTS] [JSN]
R4-162704 Cat-M1 PRACH Initial Simulation Results discussion

revision of R4-161603

Nokia LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162705 Cat-M1 PUCCH Initial Simulation Results discussion

revision of R4-161604

Nokia LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162706 Cat-M1 PUSCH Initial Simulation Results discussion

revision of R4-161605

Nokia LTE_MTCe2_L1-Perf R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162707 Summary of eMTC PRACH/PUCCH/PUSCH demodulation results other Nokia R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162709 Uplink Simulation results for e-MTC discussion

revision of R4-161565

Samsung LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

noted [WTS] [JSN]
R4-162747 CR: Cat-M1 PRACH Performance Requirements CR

revision of R4-161606

revised to R4-164297

Nokia, Ericsson, Huawei, Samsung 36.104 13.3.0 CR#7651 catB LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

agreed [WTS] [JSN]
R4-162792 CR: Cat-M1 PUCCH Performance Requirements CR

revision of R4-161607

revised to R4-164299

Nokia, Huawei, Ericsson 36.104 13.3.0 CR#7661 catB LTE_MTCe2_L1-Perf Rel-13 R4-78

AI: 6.5.4

agreed [WTS] [JSN]

24 documents (0.34942698478699 seconds)