Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-152030 Minutes for Study on Network Management of Virtualized Networks other Rapporteur S5-100

AI: 6.5.3

noted [WTS] [JSN]
S5-152054 Minutes of ETSI NFV IFA-3GPP SA5 conference call on March 19th other WG Chairman S5-100

AI: 6.5.3

noted [WTS] [JSN]
S5-152101 pCR performance management procedure other Intel S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152102 pCR performance management requirements other Intel S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152103 pCR virtualized resource performance measurements use case other

revised to S5-152297

Intel S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152104 pCR MME overload mitigation by MME VNF procedure other Intel S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152105 pCR MME VNF termination procedure other Intel S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152110 pCR TR 32.842 Add PM requirements of EM other China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152111 pCR TR 32.842 Add LCM requirements of VNFM based on performance measurments other China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152112 pCR TR 32.842 Update LCM requirements of NM other China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152113 pCR TR 32.842 Add PM requirement of NM other China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152114 pCR TR 32.842 Add general requirement for mixed network management other China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152119 pCR TR 32.842 Add use case of VNF scaling to target capacity initiated by EM other

revised to S5-152298

China Mobile, ZTE S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152122 pCR TR 32.842 Add procedure of VNF scaling to target capacity initiated by EM other China Mobile, ZTE S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152123 pCR TR 32.842 NSD On-boarding other

revised to S5-152300

Cisco S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152124 pCR TR 32.842 Disabling NSD other

revised to S5-152301

Cisco S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152125 pCR TR 32.842 Enabling NSD other

revised to S5-152302

Cisco S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152131 pCR 32.842 Add potential requirement for VNF and VNFC related faults other NTT DOCOMO FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152132 pCR 32.842 Add potential requirement on notification due to infrastructure state changes other NTT DOCOMO FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152133 pCR 32.842 Add potential requirement on VNF snapshot capture other NTT DOCOMO FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152134 pCR 32.842 Correction in UC for VNF snapshot capture other NTT DOCOMO FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152135 pCR 32.842 Add potential requirement for VNF auto-healing by VNFM other NTT DOCOMO FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152136 pCR 32.842 Amending requirement for auto-scaling by VNFM of a VNF other NTT DOCOMO FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152137 pCR TR 32.842 UC for VNF auto-scaling by VNFM other

revised to S5-152299

NTT DOCOMO FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152143 pCR TR32.842 UC modification of automatic re-connection of eNBs other

revised to S5-152305

KDDI, Ericsson FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152144 pCR TR32.842 Adding a new Ensemble example other

revised to S5-152258

KDDI FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152145 pCR TR32.842 corrections for use case of VM failure is detected by VNF application other KDDI FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152146 pCR TR32.842 for use case of failure management when the alarm generated by NFVI other KDDI FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

withdrawn [WTS] [JSN]
S5-152159 pCR 32 842 VNF configuration management procedure other ZTE, China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152160 pCR 32 842 VNF performance management procedure other ZTE, China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152163 pCR 32.842 Additional Ensemble other

revised to S5-152259

Orange S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152164 pCR TR32.842 Adding potential requirements for mixed network management other KDDI FS_OAM_VIRNET Rel-13 S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152166 pCR TR 32.842 Generic NRM for virtual network other ZTE, China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152167 pCR TR32.842 Explanation of ensemble and its positioning in standardization other

revised to S5-152257

NTT DOCOMO Rel-13 S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152168 pCR TR32.842 A supplement example to 'Adding a new Ensemble example' other

revised to S5-152290

NTT DOCOMO Rel-13 S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152169 pCR TR 32.842 UC Failure management when the alarm is generated by NFVI other Huawei S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152170 pCR TR 32.842 Add business level requirements for virtualized resources mgmt other Huawei, China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152171 pCR TR 32.842 Modify requirement tags other Huawei S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152172 pCR TR 32.842 Modify network management reference model other Huawei, China Mobile S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152173 pCR TR 32.842 Add NFV management layer concept other Huawei S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152174 pCR TR 32.842 Update 7.3.1 Instantiation of VNF with UML options other Huawei S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152175 pCR TR 32.842 Add FM Procedure flow for the correlation done in EM other Huawei S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152176 pCR TR 32.842 Add NS Initiation Flow other Huawei S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152177 pCR TR 32.842 Add general description for dashed box in Management procedures other Huawei S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152178 pCR TR 32.842 Modify the note 9 description other Huawei S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152186 pCR TR 32.842 add Introduction clause to Annex B: Ensembles other NEC S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152190 additiona business requirements other

revised to S5-152379

S. Wright [AT&T] S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152192 Analys of PM and FM data flows for VNF and NS other Nokia Networks S5-100

AI: 6.5.3

noted [WTS] [JSN]
S5-152193 pCR TR 32.842 update PM and FM data flows other

revised to S5-152292

Nokia Networks S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152209 pCR TR 32.842 on Actor other Ericsson S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152210 pCR TR 32.842 scaling trigger and scaling decision other Ericsson S5-100

AI: 6.5.3

available [WTS] [JSN]
S5-152247 Document list other Huawei S5-100

AI: 6.5.3

withdrawn [WTS] [JSN]
S5-152250 VR management and Policy management other

revised to S5-152295

Ericsson S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152252 Candidate topics for SA5 IFA joint meeting other Huawei S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152257 pCR TR32.842 Explanation of ensemble and its positioning in standardization other

revision of S5-152167

NTT DOCOMO S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152258 pCR TR32.842 Adding a new Ensemble example other

revision of S5-152144

revised to S5-152308

KDDI FS_OAM_VIRNET S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152259 pCR 32.842 Additional Ensemble other

revision of S5-152163

revised to S5-152307

Orange S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152290 pCR TR32.842 A supplement example to 'Adding a new Ensemble example' other

revision of S5-152168

revised to S5-152357

NTT DOCOMO S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152292 pCR TR 32.842 update PM and FM data flows other

revision of S5-152193

Nokia Networks S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152295 VR management and Policy management other

revision of S5-152250

Ericsson S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152297 pCR virtualized resource performance measurements use case other

revision of S5-152103

Intel S5-100

AI: 6.5.3

noted [WTS] [JSN]
S5-152298 pCR TR 32.842 Add use case of VNF scaling to target capacity initiated by EM other

revision of S5-152119

revised to S5-152352

China Mobile, ZTE S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152299 pCR TR 32.842 UC for VNF auto-scaling by VNFM other

revision of S5-152137

revised to S5-152380

NTT DOCOMO FS_OAM_VIRNET S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152300 pCR TR 32.842 NSD On-boarding other

revision of S5-152123

Cisco S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152301 pCR TR 32.842 Disabling NSD other

revision of S5-152124

Cisco S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152302 pCR TR 32.842 Enabling NSD other

revision of S5-152125

Cisco S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152305 pCR TR32.842 UC modification of automatic re-connection of eNBs other

revision of S5-152143

revised to S5-152381

KDDI, Ericsson FS_OAM_VIRNET S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152306 Update of the terminology mapping table other Huawei S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152307 pCR 32.842 Additional Ensemble other

revision of S5-152259

Orange S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152308 pCR TR32.842 Adding a new Ensemble example other

revision of S5-152258

revised to S5-152382

KDDI FS_OAM_VIRNET S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152337 3GPP view on PN and FM data flows other

revised to S5-152378

Nokia Networks S5-100

AI: 6.5.3

revised [WTS] [JSN]
S5-152352 pCR TR 32.842 Add use case of VNF scaling to target capacity initiated by EM other

revision of S5-152298

China Mobile, ZTE S5-100

AI: 6.5.3

noted [WTS] [JSN]
S5-152357 pCR TR32.842 A supplement example to 'Adding a new Ensemble example' other

revision of S5-152290

NTT DOCOMO S5-100

AI: 6.5.3

noted [WTS] [JSN]
S5-152378 3GPP view on PM and FM data flows other

revision of S5-152337

Nokia Networks S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152379 additiona business requirements other

revision of S5-152190

S. Wright [AT&T] S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152380 pCR TR 32.842 UC for VNF auto-scaling by VNFM other

revision of S5-152299

NTT DOCOMO FS_OAM_VIRNET S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152381 pCR TR32.842 UC modification of automatic re-connection of eNBs other

revision of S5-152305

KDDI, Ericsson FS_OAM_VIRNET S5-100

AI: 6.5.3

approved [WTS] [JSN]
S5-152382 pCR TR32.842 Adding a new Ensemble example other

revision of S5-152308

KDDI FS_OAM_VIRNET S5-100

AI: 6.5.3

noted [WTS] [JSN]
S5-152383 Draft 32.842 other Rapporteur S5-100

AI: 6.5.3

approved [WTS] [JSN]

79 documents (0.36185002326965 seconds)