Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2404311 Discussion on core maintenance for measurements without gaps discussion Apple NR_MG_enh2-Core R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2404312 Draft CR of core maintenance for measurements without gaps draftCR Apple NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

postponed [WTS] [JSN]
R4-2404492 On remaining maintenance issues for measurements without gaps discussion vivo NR_MG_enh2-Core R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2404558 DraftCR on introduction of interruprion requirements for inter-RAT NR measurement without gap (case a-1) draftCR Xiaomi NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

postponed [WTS] [JSN]
R4-2404567 Rel-18 RAN4 UE feature list for Rel18 Positioning WI discussion Xiaomi NR_pos_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2404704 (NR_MG_enh2-Core) Discussion on open issues for measurements without gaps discussion CMCC R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2404707 (NR_MG_enh2-Core) DraftCR on measurement delay for NFG draftCR CMCC NR_MG_enh2 Rel-18 R4-110-bis

AI: 6.5.2

postponed [WTS] [JSN]
R4-2404742 Maintenance draftCR on interruption requirements for measurements without gap draftCR Intel Corporation NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

postponed [WTS] [JSN]
R4-2404766 Discussion on measurement without gaps for UEs reporting NeedForGapsInfoNR other ZTE Corporation NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2404767 Discussion on inter-RAT measurement without gaps other ZTE Corporation NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2404925 Discussion on core requirements for measurements without gap other OPPO NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2404966 R18 NeedForGaps capability discussion Ericsson NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2404968 Remaining issues on measurement without gaps discussion Ericsson NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2405561 Discussion on remaining issues for measurement without MG LS out

LS To: RAN2

Huawei, HiSilicon NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2405562 draftCR on requirements for inter-RAT LTE measurement without gap draftCR Huawei, HiSilicon NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

postponed [WTS] [JSN]
R4-2405720 Remaining issues for R18 NFG discussion Qualcomm Incorporated NR_MG_enh2-Core R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2405798 Discussion on measurements without gaps discussion Nokia NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2405799 Draft CR interruption requirements for measurements without gaps draftCR Nokia NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

postponed [WTS] [JSN]
R4-2405800 Draft CR interruption requirements for interRAT measurements without gaps draftCR Nokia NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

postponed [WTS] [JSN]
R4-2405804 Discussion on capabilities for UE requiring interruptions discussion Nokia, AT&T, BT Plc., Charter Communications Inc, Orange, TELECOM ITALIA S.p.A., Telia Company, T-Mobile USA, Verizon, Vodafone NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2405900 Discussion on measurement without gaps discussion MediaTek inc. NR_MG_enh2-Core Rel-18 R4-110-bis

AI: 6.5.2

noted [WTS] [JSN]
R4-2406509 Draft Big CR to TS 38.133 on core requirement maintenance for R18 NR and MR-DC measurement gaps and measurements without gaps draftCR MediaTek, Intel NR_MG_enh2 Rel-18 R4-110-bis

AI: 6.5.2

endorsed [WTS] [JSN]

22 documents (0.35536313056946 seconds)