Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1902848 On FR2 PC1 MPR and OBW other Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

noted [WTS] [JSN]
R4-1902849 Draft CR to 38.101-2: FR2 PC1 MPR draftCR

revised to R4-1904965

Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

revised [WTS] [JSN]
R4-1902850 On FR2 PC3 MPR other Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

noted [WTS] [JSN]
R4-1902851 Draft CR to 38.101-2: FR2 PC3 MPR draftCR Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

not pursued [WTS] [JSN]
R4-1902852 On FR2 MPR for CA other Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

noted [WTS] [JSN]
R4-1902853 Draft CR to 38.101-2: FR2 PC3 CA MPR enhancement draftCR

revised to R4-1904944

Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

revised [WTS] [JSN]
R4-1902928 Draft CR to TS 38.101-2 PC3 MPR for narrow allocations draftCR Intel Corporation NR_newRAT-Core Rel-15 R4-90

AI: 6.5.11.1

not pursued [WTS] [JSN]
R4-1902929 Draft CR to TS 38.101-2 PC2/PC4 MPR draftCR Intel Corporation NR_newRAT-Core Rel-15 R4-90

AI: 6.5.11.1

not pursued [WTS] [JSN]
R4-1903062 Draft CR to 38.817-01 to align system level simulation assumptions with MPR definition draftCR Apple Inc. NR_newRAT-Core Rel-15 R4-90

AI: 6.5.11.1

postponed [WTS] [JSN]
R4-1903524 FR2 MPR due to OBW discussion Nokia, Nokia Shanghai Bell NR_newRAT-Core R4-90

AI: 6.5.11.1

noted [WTS] [JSN]
R4-1904475 Draft CR for 38.101-2 PC3 MPR draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-90

AI: 6.5.11.1

not pursued [WTS] [JSN]
R4-1904944 Draft CR to 38.101-2: FR2 PC3 CA MPR enhancement draftCR

revision of R4-1902853

Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

postponed [WTS] [JSN]
R4-1904965 Draft CR to 38.101-2: FR2 PC1 MPR draftCR

revision of R4-1902849

Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

withdrawn [WTS] [JSN]
R4-1904996 Draft CR to 38.101-2: FR2 PC3 and PC1 MPR draftCR

revised to R4-1905003

Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

revised [WTS] [JSN]
R4-1905003 Draft CR to 38.101-2: FR2 PC3 and PC1 MPR draftCR

revision of R4-1904996

Qualcomm Incorporated NR_newRAT Rel-15 R4-90

AI: 6.5.11.1

endorsed [WTS] [JSN]

15 documents (0.32854890823364 seconds)