Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2200426 RRM requirements for CBM based Inter-band DL CA discussion Qualcomm Incorporated NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

noted [WTS] [JSN]
R4-2200742 Other RRM requirements for FR2 inter-band DL CA requirements for CBM other ZTE Corporation NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

noted [WTS] [JSN]
R4-2200928 Discussion on CBM RRM requirements for FR2 inter-band DL CA discussion MediaTek inc. NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

noted [WTS] [JSN]
R4-2200929 Introduction of SCell activation delay requirement for FR2 inter-band CA with common beam management draftCR

revised to R4-2202584

MediaTek inc. NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

revised [WTS] [JSN]
R4-2201130 Other RRM requirements for FR2 inter-band DL CA enhancements discussion OPPO NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

noted [WTS] [JSN]
R4-2201373 Discussion on RRM requirements of inter-band DL CA for CBM UE discussion Ericsson NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

noted [WTS] [JSN]
R4-2201374 Draft CR on scheduling restriction for FR2 inter-band DL CA for CBM UE draftCR

revised to R4-2202585

Ericsson NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

revised [WTS] [JSN]
R4-2201539 discussion on other RRM requirements for CBM inter-band FR2 DL CA discussion Nokia, Nokia Shanghai Bell NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

noted [WTS] [JSN]
R4-2201540 draftCR on measurement restriction for CBM inter-band FR2 DL CA draftCR

revised to R4-2202586

Nokia, Nokia Shanghai Bell NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

revised [WTS] [JSN]
R4-2201608 Discussion on other RRM requirements for FR2 inter-band DL CA with CBM discussion Huawei, Hisilicon NR_RF_FR2_req_enh2-Core R4-101-bis-e

AI: 6.4.6.1.2

noted [WTS] [JSN]
R4-2201609 DraftCR on interruption requirements for FR2 inter-band CA with CBM draftCR

revised to R4-2202587

Huawei, Hisilicon NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

revised [WTS] [JSN]
R4-2202584 Introduction of SCell activation delay requirement for FR2 inter-band CA with common beam management draftCR

revision of R4-2200929

MediaTek inc. NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

withdrawn [WTS] [JSN]
R4-2202585 Draft CR on scheduling restriction for FR2 inter-band DL CA for CBM UE draftCR

revision of R4-2201374

Ericsson NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

withdrawn [WTS] [JSN]
R4-2202586 draftCR on measurement restriction for CBM inter-band FR2 DL CA draftCR

revision of R4-2201540

Nokia, Nokia Shanghai Bell NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

withdrawn [WTS] [JSN]
R4-2202587 DraftCR on interruption requirements for FR2 inter-band CA with CBM draftCR

revision of R4-2201609

Huawei, Hisilicon NR_RF_FR2_req_enh2-Core Rel-17 R4-101-bis-e

AI: 6.4.6.1.2

endorsed [WTS] [JSN]

15 documents (0.35257577896118 seconds)