Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-185027 | Minutes of Assurance data and Performance Management for 5G networks and network slicing | report | Rapporteur (Intel) |
S5-120 AI: 6.4.5 |
noted | [WTS] [JSN] | |||
S5-185056 | pCR 28.552 Add Use Case and Measurements related to DL UE throughput of Split Bear | pCR | ZTE, China Mobile | 28.552 0.5.1 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not treated | [WTS] [JSN] |
S5-185058 | TD PM Control |
discussion revised to S5-185562 |
Ericsson Inc. | NETSLICE | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] | |
S5-185129 | pCR TS 28.551 createMeasurementJob clarification |
pCR revised to S5-185450 |
Cisco Systems Inc. | 28.551 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185172 | pCR 28.550 Update on MDAS |
pCR revised to S5-185452 |
Huawei | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185173 | pCR 28.550 Add detectCoverageHole operation for MDAS CCO service |
pCR revised to S5-185453 |
Huawei | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185174 | pCR 28.550 RESTful solution for MDAS for coverage hole detection | pCR | Huawei | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-185175 | pCR 28 550 Clarification on the PM data reporting | pCR | Huawei | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185187 | pCR 28.554 Add management data analytical KPIs on RAN condition |
pCR revised to S5-185510 |
Intel Korea, Ltd. | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185188 | pCR 28.554 Add management data analytical KPIs on cell composite load |
pCR revised to S5-185511 |
Intel Korea, Ltd. | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185191 | pCR 28.550 Add concept for performance assurance |
pCR revised to S5-185570 |
Intel Corporation (UK) Ltd, China Mobile | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185192 | pCR 28.550 Update UC and requirements on management data analytics | pCR | Intel Corporation (UK) Ltd | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-185193 | pCR 28.550 Add Restful SS for performance assurance services |
pCR revised to S5-185512 |
Intel Corporation (UK) Ltd | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185194 | pCR 28.550 Add performance data file XML schema |
pCR revised to S5-185537 |
Intel Corporation (UK) Ltd | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185195 | pCR 28.550 Rapporteur clean-up |
pCR revised to S5-185514 |
Intel Corporation (UK) Ltd | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185196 | pCR 28.554 Add management data analytical KPI - predicted traffic volume | pCR | Intel Corporation (UK) Ltd | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-185197 | pCR 28.554 Add management data analytical KPI - resource utilization tendency | pCR | Intel Corporation (UK) Ltd | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-185198 | pCR 28.552 Add registration procedure related measurements for AMF |
pCR revised to S5-185457 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185199 | pCR 28.552 Add PDU session creation measurements for SMF | pCR | Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185200 | pCR 28.552 Add AM policy association establishment related measurements for PCF |
pCR revised to S5-185515 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185201 | pCR 28.552 Add SM policy association establishment related measurements for PCF | pCR | Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185202 | pCR 28.552 Add event exposure related measurements for NEF |
pCR revised to S5-185516 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185203 | pCR 28.552 Add NF service registration related measurements for NRF |
pCR revised to S5-185517 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185204 | pCR 28.552 Add NF performance measurements related to VR |
pCR revised to S5-185518 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185205 | pCR 28.552 Upate the e2e performance measurements | pCR | Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-185206 | pCR 28.552 Add concept for assurance data |
pCR revised to S5-185454 |
Intel Corporation (UK) Ltd, China Mobile | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185207 | pCR 28.552 Rapporteur clean-up |
pCR revised to S5-185522 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185208 | Presentation of TS 28.550 for approval |
TS or TR cover revised to S5-185561 |
Intel Corporation (UK) Ltd | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] | |
S5-185209 | Presentation of TS 28.552 for approval |
TS or TR cover revised to S5-185552 |
Intel Corporation (UK) Ltd | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] | |
S5-185210 | Revised WID on Assurance data and Performance Management for 5G networks and network slicing |
WID revised revised to S5-185449 |
Intel Corporation (UK) Ltd, China Mobile | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] | |
S5-185256 | pCR 28.552 Add F1 setup request measurements | pCR | China Mobile (Suzhou) Software | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185257 | pCR 28.552 Add measurement for UE CONTEXT MODIFICATION REQUIRE | pCR | China Mobile (Suzhou) Software | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185258 | pCR 28.552 Add UE-associated F1 reset measurements | pCR | China Mobile (Suzhou) Software | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185259 | pCR 28.554 Add KPI definition of registered subscribers to UDM of single network slice instance |
pCR revised to S5-185554 |
China Mobile (Suzhou) Software | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185260 | pCR Add 5G registration measurement in TS 28.553 | pCR | China Mobile (Suzhou) Software | 28.553 0.4.0 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
merged | [WTS] [JSN] |
S5-185261 | pCR TS 28.553 Add measurement of registration subscribers | pCR | China Mobile (Suzhou) Software | 28.553 0.4.0 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185262 | pCR Delete editor’s notes in TS 28.554 |
pCR revised to S5-185558 |
China Mobile (Suzhou) Software | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185278 | Discussion paper on UE throughput Measurement | discussion | ZTE, China Mobile |
S5-120 AI: 6.4.5 |
noted | [WTS] [JSN] | |||
S5-185279 | pCR 28.552 Add Use Case and Measurements related to DL fullly buffered UE throughput | pCR | ZTE, China Mobile | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-185281 | pCR 28.554 RAN UE Throughput KPI update |
pCR revised to S5-185557 |
Ericsson GmbH, Eurolab | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185282 | pCR 28.554 Update based on LS reply | pCR | Ericsson GmbH, Eurolab | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185283 | pCR 28.552 Restructuring of clause 5.1 | pCR | Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185284 | pCR 28.552 Scope and References update |
pCR revised to S5-185520 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185285 | pCR 28.552 Add definitions |
pCR revised to S5-185521 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185286 | pCR 28.552 IP Latency measurement update |
pCR revised to S5-185523 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185287 | pCR 28.552 Number of UE Context Release Request measurements update |
pCR revised to S5-185541 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185288 | pCR 28.552 Packet Delay measurements update |
pCR revised to S5-185547 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185289 | pCR 28.552 Packet drop measurements update |
pCR revised to S5-185548 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185290 | pCR 28.552 Packet loss measurements corrections and update |
pCR revised to S5-185549 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185291 | pCR 28.552 PRB Usage measurements update | pCR | Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185292 | pCR 28.552 RRC connection number measurements update |
pCR revised to S5-185550 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185293 | pCR 28.552 UE throughput measurements update |
pCR revised to S5-185551 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185331 | pCR TS 28.550 Further clarification relating to the definifition of management Analytical KPI(s) |
pCR revised to S5-185513 |
NEC Corporation | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185356 | Tdoc discussion sequence for WI on Assurance data and PM for 5G networks and network slicing |
discussion revised to S5-185498 |
Intel Corporation (UK) Ltd, China Mobile | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] | ||
S5-185440 | Presentation of TS 28.554 |
TS or TR cover revised to S5-185559 |
China Mobile | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] | |
S5-185449 | Revised WID on Performance assurance for 5G networks including network slicing |
WID revised revision of S5-185210 |
Intel Corporation (UK) Ltd, China Mobile | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
agreed | [WTS] [JSN] | |
S5-185450 | pCR TS 28.551 createMeasurementJob clarification |
pCR revision of S5-185129 |
Cisco Systems Inc. | 28.551 0.3.0 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185451 | Reply LS to S5-182574, S5-193622, S5-184337 on L2 measurements (R3-185114; to: SA5, RAN2; cc: -; contact: Ericsson) |
LS in source LS: R3-185114 LS reply in S5-185560, S5-185560 |
R3-185114 | NR_newRAT-Core | Rel-15 |
S5-120 AI: 6.4.5 |
replied to | [WTS] [JSN] | |
S5-185452 | pCR 28.550 Update on MDAS |
pCR revision of S5-185172 |
Huawei | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185453 | pCR 28.550 Add detectCoverageHole operation for MDAS CCO service |
pCR revision of S5-185173 |
Huawei | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185454 | pCR 28.552 Add concept for assurance data |
pCR revision of S5-185206 |
Intel Corporation (UK) Ltd, China Mobile | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185457 | pCR 28.552 Add registration procedure related measurements for AMF |
pCR revision of S5-185198 |
Intel Corporation (UK) Ltd; China Mobile (Suzhou) Software | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185498 | Tdoc discussion sequence for WI on Assurance data and PM for 5G networks and network slicing |
discussion revision of S5-185356 |
China Mobile, Intel Corporation (UK) Ltd | Rel-15 |
S5-120 AI: 6.4.5 |
noted | [WTS] [JSN] | ||
S5-185510 | pCR 28.554 Add management data analytical KPIs on RAN condition |
pCR revision of S5-185187 |
Intel Korea, Ltd. | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185511 | pCR 28.554 Add management data analytical KPIs on cell composite load |
pCR revision of S5-185188 |
Intel Korea, Ltd. | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185512 | pCR 28.550 Add Restful SS for performance assurance services |
pCR revision of S5-185193 |
Intel Corporation (UK) Ltd | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185513 | pCR TS 28.550 Further clarification relating to the definifition of management Analytical KPI(s) |
pCR revision of S5-185331 |
NEC Corporation | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185514 | pCR 28.550 alignment of terminology |
pCR revision of S5-185195 |
Intel Corporation (UK) Ltd | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185515 | pCR 28.552 Add AM policy association establishment related measurements for PCF |
pCR revision of S5-185200 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185516 | pCR 28.552 Add event exposure related measurements for NEF |
pCR revision of S5-185202 revised to S5-185608 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185517 | pCR 28.552 Add NF service registration related measurements for NRF |
pCR revision of S5-185203 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-185518 | pCR 28.552 Add NF performance measurements related to VR |
pCR revision of S5-185204 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
not pursued | [WTS] [JSN] |
S5-185519 | pCR TS 28.553 Add measurement of registration subscribers | pCR | China Mobile (Suzhou) Software | 28.552 0.4.0 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185520 | pCR 28.552 Scope and References update |
pCR revision of S5-185284 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185521 | pCR 28.552 Add definitions |
pCR revision of S5-185285 revised to S5-185609 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185522 | pCR 28.552 Rapporteur clean-up |
pCR revision of S5-185207 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185523 | pCR 28.552 IP Latency measurement update |
pCR revision of S5-185286 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185537 | pCR 28.550 Add performance data file XML schema |
pCR revision of S5-185194 revised to S5-185620 |
Intel Corporation (UK) Ltd | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185541 | pCR 28.552 Number of UE Context Release Request measurements update |
pCR revision of S5-185287 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185547 | pCR 28.552 Packet Delay measurements update |
pCR revision of S5-185288 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185548 | pCR 28.552 Packet drop measurements update |
pCR revision of S5-185289 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185549 | pCR 28.552 Packet loss measurements corrections and update |
pCR revision of S5-185290 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185550 | pCR 28.552 RRC connection number measurements update |
pCR revision of S5-185292 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185551 | pCR 28.552 UE throughput measurements update |
pCR revision of S5-185293 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185552 | Presentation of TS 28.552 for approval |
TS or TR cover revision of S5-185209 revised to S5-185611 |
Intel Corporation (UK) Ltd | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] | |
S5-185554 | pCR 28.554 Add KPI definition of registered subscribers to UDM of single network slice instance |
pCR revision of S5-185259 |
China Mobile (Suzhou) Software | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185557 | pCR 28.554 RAN UE Throughput KPI update |
pCR revision of S5-185281 |
Ericsson GmbH, Eurolab | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185558 | pCR Delete editor’s notes in TS 28.554 |
pCR revision of S5-185262 |
China Mobile (Suzhou) Software | 28.554 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185559 | Presentation of TS 28.554 |
TS or TR cover revision of S5-185440 |
China Mobile | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-185560 | Reply to R3-185114 = S5-185451 on L2 measurement (to: RAN3; cc: RAN1, RAN2; contact: Ericsson) |
LS out LS is reply to S5-185451 LS To: RAN3 |
SA5 | NETSLICE-ADPM5G, NR_newRAT-Core | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-185561 | Presentation of TS 28.550 for approval |
TS or TR cover revision of S5-185208 |
Intel Corporation (UK) Ltd | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-185562 | TD PM Control |
discussion revision of S5-185058 |
Ericsson Inc. | NETSLICE | Rel-15 |
S5-120 AI: 6.4.5 |
noted | [WTS] [JSN] | |
S5-185570 | pCR 28.550 Add concept for performance assurance |
pCR revision of S5-185191 revised to S5-185606 |
Intel Corporation (UK) Ltd, China Mobile | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185606 | pCR 28.550 Add concept for performance assurance |
pCR revision of S5-185570 |
Intel Corporation (UK) Ltd, China Mobile | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185608 | pCR 28.552 Add event exposure related measurements for NEF |
pCR revision of S5-185516 |
Intel Corporation (UK) Ltd | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
withdrawn | [WTS] [JSN] |
S5-185609 | pCR 28.552 Add definitions |
pCR revision of S5-185521 revised to S5-185615 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
revised | [WTS] [JSN] |
S5-185611 | Presentation of TS 28.552 for approval |
TS or TR cover revision of S5-185552 |
Intel Corporation (UK) Ltd | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-185615 | pCR 28.552 Add definitions |
pCR revision of S5-185609 |
Ericsson GmbH, Eurolab | 28.552 0.5.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185620 | pCR 28.550 Add performance data file XML schema |
pCR revision of S5-185537 |
Intel Corporation (UK) Ltd | 28.55 1.2.2 | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
S5-185629 | TS 28.550 v1.3.0 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-185630 | TS 28.552 v0.6.0 | draft TS | Intel | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] | |
S5-185631 | TS 28.554 v1.3.0 | draft TS | CMCC | NETSLICE-ADPM5G | Rel-15 |
S5-120 AI: 6.4.5 |
approved | [WTS] [JSN] |
102 documents (0.37511610984802 seconds)