Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-224052 New NE-DC measurements test case 8.2.3.1.2 CR

revised to R5-225395

ZTE Corporation 38.523-1 16.12.0 CR#3027 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224053 New NE-DC measurements test case 8.2.3.1.2 CR ZTE Corporation 38.523-1 16.12.0 CR#3028 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

withdrawn [WTS] [JSN]
R5-224054 New NE-DC measurements test case 8.2.3.1.2 CR ZTE Corporation 38.523-1 16.12.0 CR#3029 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

withdrawn [WTS] [JSN]
R5-224055 New NE-DC measurements test case 8.2.3.2.2 CR

revised to R5-225396

ZTE Corporation 38.523-1 16.12.0 CR#3030 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224056 New NE-DC measurements test case 8.2.3.7.2 CR

revised to R5-225397

ZTE Corporation 38.523-1 16.12.0 CR#3031 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224057 New NE-DC measurements test case 8.2.3.7.2a CR

revised to R5-225398

ZTE Corporation 38.523-1 16.12.0 CR#3032 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224058 New NE-DC measurements test case 8.2.3.7.2b CR

revised to R5-225399

ZTE Corporation 38.523-1 16.12.0 CR#3033 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224059 New NE-DC measurements test case 8.2.3.8.2 CR

revised to R5-225400

ZTE Corporation 38.523-1 16.12.0 CR#3034 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224060 New NE-DC measurements test case 8.2.3.8.2a CR

revised to R5-225401

ZTE Corporation 38.523-1 16.12.0 CR#3035 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224061 New NE-DC measurements test case 8.2.3.8.2b CR

revised to R5-225402

ZTE Corporation 38.523-1 16.12.0 CR#3036 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224062 New NE-DC measurements test case 8.2.3.1.2 CR ZTE Corporation 38.523-1 16.12.0 CR#3037 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

withdrawn [WTS] [JSN]
R5-224452 Correction to NR DC test case 8.2.3.14.2 CR Qualcomm France 38.523-1 16.12.0 CR#3098 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-224486 Correction to ENDC Measurement test cases (applicable only for FR1 bands) CR

revised to R5-225403

ROHDE & SCHWARZ 38.523-1 16.12.0 CR#3108 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224595 Addition of new NE-DC test case 8.2.3.4.2 CR

revised to R5-225404

CMCC 38.523-1 16.12.0 CR#3139 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224596 Addition of new NE-DC test case 8.2.3.5.2 CR

revised to R5-225405

CMCC 38.523-1 16.12.0 CR#3140 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

revised [WTS] [JSN]
R5-224597 Addition of new NE-DC test case 8.2.3.12.2 CR CMCC 38.523-1 16.12.0 CR#3141 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-224598 Update of NE-DC test case 8.2.3.6.2 CR CMCC 38.523-1 16.12.0 CR#3142 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-224599 Update of test case 8.2.3.4.1 CR CMCC 38.523-1 16.12.0 CR#3143 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225395 New NE-DC measurements test case 8.2.3.1.2 CR

revision of R5-224052

ZTE Corporation 38.523-1 16.12.0 CR#30271 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225396 New NE-DC measurements test case 8.2.3.2.2 CR

revision of R5-224055

ZTE Corporation 38.523-1 16.12.0 CR#30301 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225397 New NE-DC measurements test case 8.2.3.7.2 CR

revision of R5-224056

ZTE Corporation 38.523-1 16.12.0 CR#30311 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225398 New NE-DC measurements test case 8.2.3.7.2a CR

revision of R5-224057

ZTE Corporation 38.523-1 16.12.0 CR#30321 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225399 New NE-DC measurements test case 8.2.3.7.2b CR

revision of R5-224058

ZTE Corporation 38.523-1 16.12.0 CR#30331 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225400 New NE-DC measurements test case 8.2.3.8.2 CR

revision of R5-224059

ZTE Corporation 38.523-1 16.12.0 CR#30341 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225401 New NE-DC measurements test case 8.2.3.8.2a CR

revision of R5-224060

ZTE Corporation 38.523-1 16.12.0 CR#30351 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225402 New NE-DC measurements test case 8.2.3.8.2b CR

revision of R5-224061

ZTE Corporation 38.523-1 16.12.0 CR#30361 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225403 Correction to ENDC Measurement test cases (applicable only for FR1 bands) CR

revision of R5-224486

ROHDE & SCHWARZ 38.523-1 16.12.0 CR#31081 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225404 Addition of new NE-DC test case 8.2.3.4.2 CR

revision of R5-224595

CMCC 38.523-1 16.12.0 CR#31391 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]
R5-225405 Addition of new NE-DC test case 8.2.3.5.2 CR

revision of R5-224596

CMCC 38.523-1 16.12.0 CR#31401 catF TEI15_Test, 5GS_NR_LTE-UEConTest Rel-16 R5-96-e

AI: 6.4.4.4.2.3

agreed [WTS] [JSN]

29 documents (0.36462116241455 seconds)