Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-206047 Rel-17 CR 28.812 Modification to Figure 4.4-1 CR China Mobile Com. Corporation 28.812 17.0.0 CR#1 catF IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

not pursued [WTS] [JSN]
S5-206048 Rel-17 CR 28.812 Modification to Figure 6.2-1 CR China Mobile Com. Corporation 28.812 17.0.0 CR#2 catF IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

not pursued [WTS] [JSN]
S5-206214 Rel-17 CR TR28.812 Address the issues requested by EditHelp CR Huawei 28.812 17.0.0 CR#3 catD IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

agreed [WTS] [JSN]
S5-206215 pCR TS 28312 Update Clause 4.1.3 Intent categorizes based on management scenario types pCR

revised to S5-206358

Huawei, China Mobile 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

revised [WTS] [JSN]
S5-206216 pCR TS 28312 Update Clause 4.1.1 Introduction pCR

revised to S5-206359

Huawei, China Mobie, Ericsson, China Unicom 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

revised [WTS] [JSN]
S5-206217 pCR TS 28312 Add relation of intent driven management and policy driven management. pCR

revised to S5-206360

Huawei,Ericsson, China Mobile, China Unicom 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

revised [WTS] [JSN]
S5-206218 pCR TS 28312 Add use case and requirements for coverage optimization pCR

revised to S5-206361

Huawei, China Telecom 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

revised [WTS] [JSN]
S5-206219 pCR TS 28312 Add use case and requirements for RAN UE throughut optimization pCR

revised to S5-206362

Huawei 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

revised [WTS] [JSN]
S5-206220 pCR TS 28312 Add use case and requirements for radio network deployment pCR

revised to S5-206363

Huawei 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

revised [WTS] [JSN]
S5-206341 draft TS 28.312 draft TS Huawei IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

approved [WTS] [JSN]
S5-206358 pCR TS 28312 Update Clause 4.1.3 Intent categorizes based on management scenario types pCR

revision of S5-206215

Huawei, China Mobile 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

approved [WTS] [JSN]
S5-206359 pCR TS 28312 Update Clause 4.1.1 Introduction pCR

revision of S5-206216

Huawei, China Mobie, Ericsson, China Unicom 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

approved [WTS] [JSN]
S5-206360 pCR TS 28312 Add relation of intent driven management and policy driven management. pCR

revision of S5-206217

Huawei,Ericsson, China Mobile, China Unicom 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

approved [WTS] [JSN]
S5-206361 pCR TS 28312 Add use case and requirements for coverage optimization pCR

revision of S5-206218

Huawei, China Telecom 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

approved [WTS] [JSN]
S5-206362 pCR TS 28312 Add use case and requirements for RAN UE throughut optimization pCR

revision of S5-206219

Huawei 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

approved [WTS] [JSN]
S5-206363 pCR TS 28312 Add use case and requirements for radio network deployment pCR

revision of S5-206220

Huawei 28.312 0.1.0 IDMS_MN Rel-17 S5-134-e

AI: 6.4.2

approved [WTS] [JSN]

16 documents (0.35922503471375 seconds)