Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-205162 | Correction to ENDC RRC test case 8.2.2.3.1 |
CR revised to R5-206340 |
Keysight Technologies UK | 38.523-1 16.5.0 CR#1760 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
revised | [WTS] [JSN] |
R5-205377 | Correction to MRDC TC 8.2.2.8.2-key change | CR | Huawei, Hisilicon | 38.523-1 16.5.0 CR#1808 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-205378 | Correction to MRDC TC 8.2.2.9.2-split DRB |
CR revised to R5-206341 |
Huawei, Hisilicon, Keysight | 38.523-1 16.5.0 CR#1809 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
revised | [WTS] [JSN] |
R5-205436 | Correction to MRDC TC 8.2.2.8.2-key change | CR | Huawei, Hisilicon | 38.523-1 16.5.0 CR#1838 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
withdrawn | [WTS] [JSN] |
R5-205437 | Correction to MRDC TC 8.2.2.9.2-split DRB | CR | Huawei, Hisilicon | 38.523-1 16.5.0 CR#1839 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
withdrawn | [WTS] [JSN] |
R5-205580 | Correction to NRDC TC 8.2.2.4.2 and 8.2.2.5.2 |
CR revised to R5-206342 |
Qualcomm Korea | 38.523-1 16.5.0 CR#1867 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
revised | [WTS] [JSN] |
R5-205752 | Correction to NR test case 8.2.2.1.2 | CR | ZTE | 38.523-1 16.5.0 CR#1888 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-205753 | Correction to NR test case 8.2.2.2.1 | CR | ZTE | 38.523-1 16.5.0 CR#1889 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-205758 | Correction to NR5G RRC TC 8.2.2.1.2 |
CR revised to R5-206343 |
TDIA, CATT | 38.523-1 16.5.0 CR#1890 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
revised | [WTS] [JSN] |
R5-205857 | Correction to NR-DC RRC test case 8.2.2.9.2 | CR | Keysight Technologies UK | 38.523-1 16.5.0 CR#1898 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
withdrawn | [WTS] [JSN] |
R5-206220 | Addition of NR-DC RRC test case 8.2.2.7.2 |
CR revised to R5-206344 |
Keysight Technologies UK Ltd | 38.523-1 16.5.0 CR#1911 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
revised | [WTS] [JSN] |
R5-206340 | Correction to ENDC RRC test case 8.2.2.3.1 |
CR revision of R5-205162 |
Keysight Technologies UK | 38.523-1 16.5.0 CR#17601 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-206341 | Correction to MRDC TC 8.2.2.9.2-split DRB |
CR revision of R5-205378 |
Huawei, Hisilicon, Keysight | 38.523-1 16.5.0 CR#18091 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-206342 | Correction to NRDC TC 8.2.2.4.2 and 8.2.2.5.2 |
CR revision of R5-205580 |
Qualcomm Korea | 38.523-1 16.5.0 CR#18671 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-206343 | Correction to NR5G RRC TC 8.2.2.1.2 |
CR revision of R5-205758 |
TDIA, CATT | 38.523-1 16.5.0 CR#18901 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
agreed | [WTS] [JSN] |
R5-206344 | Addition of NR-DC RRC test case 8.2.2.7.2 |
CR revision of R5-206220 |
Keysight Technologies UK Ltd | 38.523-1 16.5.0 CR#19111 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-89-e AI: 6.3.2.4.4.2.2 |
agreed | [WTS] [JSN] |
16 documents (0.35609102249146 seconds)