Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R4-2505456 | CR Bugfixes and missing Fallbacks 38101-1-j10_s0505A03-0505A03 | CR | Apple | 38.101-1 19.1.0 CR#2746 catF | NR_CADC_SUL_R19 | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] |
| R4-2505548 | Draft Big CR on Introduction of completed SUL band combinations into TS 38.101-1 | draftCR | Huawei, HiSilicon | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
withdrawn | [WTS] [JSN] | |
| R4-2505549 | TR for 38.719-00-00 v0.2.0 | draft TR | Huawei, HiSilicon | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
withdrawn | [WTS] [JSN] | |
| R4-2506246 | draft big CR on 38.101-1 for NR_CADC_R19_2BDL_xBUL | draftCR | ZTE Corporation, Sanechips | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2506247 | draft big CR on 38.101-2 for NR_CADC_R19_2BDL_xBUL | draftCR | ZTE Corporation, Sanechips | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
withdrawn | [WTS] [JSN] | |
| R4-2506397 | TR38.719-02-01 v0.5.1_NR_CADC_R19_2BDL_xBUL | draft TR | ZTE Corporation, Sanechips | HPUE_DC_LTE_NR_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] | |
| R4-2506398 | TR38.719-02-01 v0.6.0 | draft TR | ZTE Corporation | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] | |
| R4-2506399 | draft big CR to TS38.101-3 for NR_CADC_SUL_R19(OBJ-2 NR_CADC_R19_2BDL_xBUL) | draftCR | ZTE Corporation | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2506492 | draft big CR 38.101-1 for NR_CADC_SUL_R19(OBJ-4 NR_CADC_R19_yBDL_xBUL) | draftCR | Ericsson | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2506493 | draft big CR 38.101-3 for NR_CADC_SUL_R19(OBJ-4 NR_CADC_R19_yBDL_xBUL) | draftCR | Ericsson | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2507398 | TR 38.719-03-01 v0.5.1 on Rel-19 NR Inter-band CA DC configurations including inter band CA for 3 different bands DL with x different bands UL (x=1,2) | draft TR | ZTE Corporation | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] | |
| R4-2507399 | TR 38.719-03-01 v0.6.0 on Rel-19 NR Inter-band CA DC configurations including inter band CA for 3 different bands DL with x different bands UL (x=1,2) | draft TR | ZTE Corporation | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] | |
| R4-2507400 | Draft big CR for NR_CADC_SUL_R19 (OBJ-3 NR_CADC_R19_3BDL_xBUL) into TS 38.101-1 | draftCR | ZTE Corporation | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2507401 | Draft big CR for NR_CADC_SUL_R19 (OBJ-3 NR_CADC_R19_3BDL_xBUL) into TS 38.101-3 | draftCR | ZTE Corporation | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2507587 | Revised WID NR_CADC_SUL_R19 | WID revised | Ericsson, ZTE Corporation, Sanechips, Huawei, Hisilicon | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2507588 | draft big CR 38.101-1 new combinations Rel-19 NR Intra-band | draftCR | Ericsson | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
withdrawn | [WTS] [JSN] | |
| R4-2507589 | draft big CR 38.101-2 new combinations Rel-19 NR Intra-band | draftCR | Ericsson | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
endorsed | [WTS] [JSN] | |
| R4-2507590 | Rel-19 NR intra-band CA combinations | draft TR | Ericsson | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] | |
| R4-2507591 | big CR 38.101-1 for NR_CADC_SUL_R19 | CR | Ericsson, ZTE Corporation, Sanechips, Huawei, Hisilicon | 38.101-1 19.1.0 CR#2831 catB | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] |
| R4-2507592 | big CR 38.101-2 for NR_CADC_SUL_R19. | CR | Ericsson, ZTE Corporation, Sanechips, Huawei, Hisilicon | 38.101-2 19.0.0 CR#801 catB | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] |
| R4-2507593 | big CR 38.101-3 for NR_CADC_SUL_R19 | CR | Ericsson, ZTE Corporation, Sanechips, Huawei, Hisilicon | 38.101-3 19.1.0 CR#1403 catB | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
agreed | [WTS] [JSN] |
| R4-2507609 | Discussion paper for PRD01 about status report input from proponents | discussion | Ericsson |
R4-115 AI: 6.3.1 |
noted | [WTS] [JSN] | |||
| R4-2507709 | PRD updates on rules for 1UL MSD configurations | discussion | Skyworks Solutions Inc. | NR_CADC_SUL_R19-Core | Rel-19 |
R4-115 AI: 6.3.1 |
noted | [WTS] [JSN] | |
| R4-2507791 | PRD input on IMD range definition for inter-band MSD due to 1UL 2CC UL configuration | discussion | Skyworks Solutions Inc. | Rel-19 |
R4-115 AI: 6.3.1 |
noted | [WTS] [JSN] |
24 documents (0.41280913352966 seconds)