Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| S5-260087 | pCR TR32.801 6G principles on E2E Automation |
pCR revised to S5-260681 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260088 | pCR TR32.801 6G principles on NFs as MnFs |
pCR revised to S5-260682 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260089 | pCR TR32.801 6G Management scenario on Knowledge | pCR | Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260090 | pCR TR32.801 6G Knowledge Management requirements |
pCR revised to S5-260724 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260091 | pCR TR32.801 6G Analytics Management requirements | pCR | Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260127 | pCR TR 32.801-01 Add use case on individual mobile service delivery and assurance for specific events |
pCR revised to S5-260683 |
Huawei, China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260128 | Rel-20 pCR on TR 32.801-01 6G management architecture design principle | pCR | Huawei, China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260129 | Rel-20 pCR on TR 32.801-01 Add cloud native Management scenario for 6G resiliency |
pCR revised to S5-260768 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260130 | Rel-20 pCR on TR 32.801-01 Add cloud native related Requirements for 6G Management Architecture | pCR | China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260136 | Pseudo-CR on TR 32.801-01 Add Agent Collaborative Management Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260137 | Pseudo-CR on TR 32.801-01 Add AI/ML-Driven Operation Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260138 | Pseudo-CR on TR 32.801-01 Add Autonomous Network Operation Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260139 | Pseudo-CR on TR 32.801-01 Add Carbon Footprint Management Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260140 | Pseudo-CR on TR 32.801-01 Add Intent-Driven Closed-Loop Operation Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260141 | Pseudo-CR on TR 32.801-01 Add Network Digital Twin Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260142 | Pseudo-CR on TR 32.801-01 Add Semantic-Driven Configuration Management Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260154 | Pseudo-CR on TR 32.801-01 Add New Management Scenario on Autonomous Agent Reshapes 6G Network Operation and Management | pCR | ZTE Corporation | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260155 | Pseudo-CR on TR 32.801-01 Add New Management Scenario on 6G Data Management Framework in the Management System |
pCR revised to S5-260728 |
ZTE Corporation | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260156 | Pseudo-CR on TR 32.801-01 Add New Management Scenario on Data Management Framework Empowers Intelligent Evolution of Network Management | pCR | ZTE Corporation | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260168 | PCR on TR 32.801-01 Add the 6G management architecture design principles |
pCR revised to S5-260679 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260169 | PCR on TR 32.801-01 Add new usecase on Management data handling and exposure to support the AI operations and services |
pCR revised to S5-260815 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260170 | PCR on TR 32.801-01 Add the use case on 6G network digital twin |
pCR revised to S5-260767 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260171 | PCR on TR 32.801-01 Add the use case on Autonomous agents in the 6G management system |
pCR revised to S5-260726 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260174 | pCR on TR 32.801-1 Add use case for hierarchical service architecture |
pCR revised to S5-260723 |
Rakuten Mobile, Inc | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260175 | pCR on TR 32.801-1 Add use case for cloud aspects of Management and Orchestration |
pCR revised to S5-260769 |
Rakuten Mobile, Inc | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260176 | pCR on TR 32.801-1 Add use case for data management | pCR | Rakuten Mobile, Inc | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260196 | DP on use of proposed 6G OAM TR structure | discussion | AT&T, ZTE | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
noted | [WTS] [JSN] | |
| S5-260208 | Rel-20 pCR TR 32.801-01 Add network experience evaluation use case for robot communication services |
pCR revised to S5-260684 |
Huawei, China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260209 | TR 32.801-01 v0.0.0 skeleton | draft TR | ZTE Corporation, AT&T | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
agreed | [WTS] [JSN] | |
| S5-260210 | Pseudo-CR on TR 32.801-01 Add Clause Structure |
pCR revised to S5-260766 |
ZTE Corporation, AT&T | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260221 | Rel-20 pCR TR 32.801-01 New use case on RAN energy efficiency optimization for green network |
pCR revised to S5-260685 |
Huawei | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260222 | Rel-20 pCR TR 32.801-01 Add AN management agent concept in management domain |
pCR revised to S5-260727 |
Huawei | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260278 | pCR on Rel-20 TR 32.801-01 6G principles on ES and EE architecture |
pCR revised to S5-260680 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260285 | Rel-20 pCR TR 32.801-01 Efficient intent handling by inputting intent before the unplanned event |
pCR revised to S5-260771 |
NTT DOCOMO INC. | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260286 | Rel-20 pCR TR 32.801-01 New use case for individual service complaint handling management |
pCR revised to S5-260686 |
Huawei | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260287 | Rel-20 pCR on TR 32.801-01 New use case on network issue handling management |
pCR revised to S5-260687 |
Huawei | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260294 | Rel-20 pCR 32.801-01 Use case of Agent Enablement | pCR | Samsung R&D Institute India | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260297 | Rel-20 pCR 32.801-01 Use case of Semantic Network Management | pCR | Samsung R&D Institute India | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260305 | pCR TR32.801-01 Add use case on Ubiquitous Connectivity |
pCR revised to S5-260772 |
CATT | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260308 | Rel-20 pCR TR 32.801-1 Add use case of agents in 6G network | pCR | AsiaInfo | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260309 | Pseudo-CR on TR 32.801-01 Add Semantic-Driven Configuration Management Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
withdrawn | [WTS] [JSN] |
| S5-260318 | Pseudo-CR on TR 32.801-01 Add Agent-Based Network Management Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260328 | Pseudo-CR on TR32.801-01 Add architecture principles for Data Management Framework | pCR | vivo Mobile Communication Co., | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260351 | Rel-20 pCR TR 32.801-01 Add Management Scenarios on Generative AI and LLMs in 6G System | pCR | Nokia Canada | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260352 | Pseudo-CR TR 32.801-01 Add Management Scenario on AI service (AI-inference and AI-training) management |
pCR revised to S5-260770 |
Nokia Canada | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260356 | Pseudo-CR on TR 32.801-01 Add Semantic-Driven Configuration Management Scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260366 | Pseudo-CR on Correlation Context Structure |
pCR revised to S5-260773 |
Ericsson GmbH, Eurolab | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260367 | Discussion Paper: Correlation Context Structure for 6G | discussion | Ericsson GmbH, Eurolab | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
noted | [WTS] [JSN] | |
| S5-260376 | Planning for 6G OAM Study |
discussion revised to S5-260677 |
AT&T, ZTE | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] | |
| S5-260377 | Discussion Paper: Telecom operators design principles for the 6G Study |
discussion revised to S5-260678 |
DOCOMO Communications Lab. | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] | |
| S5-260378 | Rel-20 pCR TR 32.801-01 AI Agents terminology | pCR | Ericsson Korea Partners Co Ltd | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260382 | Rel-20 pCR TR 32.801-01 Definition of Semantic Network Management | pCR | Ericsson Korea Partners Co Ltd | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260391 | pCR on TR 32.801-01 General principles for 6G management and evolution towards a data centric management architecture | pCR | Ericsson Telecomunicazioni SpA | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260409 | Pseudo-CR TR 32.801-1 6G management architecture principles | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260410 | Pseudo-CR TR 32.801-1 Semantic/knowledge network management scenarios | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260411 | Pseudo-CR TR 32.801-1 Terms related to knowledge and semantics | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260412 | Pseudo-CR TR 32.801-1 Semantic/knowledge network management key issue | pCR | China Unicom | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
postponed | [WTS] [JSN] |
| S5-260413 | Considerations on 6G management architecture principles | discussion | China Unicom | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
noted | [WTS] [JSN] | |
| S5-260414 | pCR TR 32.801-01 Add key issue on data management – Terminology |
pCR revised to S5-260711 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260415 | pCR TR 32.801-01 Add key issue on data management – Representation of time series data | pCR | Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
postponed | [WTS] [JSN] |
| S5-260422 | pCR TR 32.801-01 Add key issue on data management – Standardized tags | pCR | Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
postponed | [WTS] [JSN] |
| S5-260423 | pCR TR 32.801-01 Add key issue on data management – Context data | pCR | Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
postponed | [WTS] [JSN] |
| S5-260424 | pCR TR 32.801-01 Add key issue on data management – Managing time series data | pCR | Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
postponed | [WTS] [JSN] |
| S5-260462 | DP Input on 6G OAM Study on Network Slicing Management | discussion | Ericsson España S.A. | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
noted | [WTS] [JSN] | |
| S5-260499 | Discussion on 6G OAM TR structure | discussion | NEC | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
noted | [WTS] [JSN] | |
| S5-260501 | pCR on TR 32.801-01 Add principles on agents |
pCR revised to S5-260627 |
Samsung Electronics GmbH | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260502 | pCR on TR 32.801-01 Add use case on agent-driven multi-RAT management |
pCR revised to S5-260628 |
Samsung Electronics GmbH | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260625 | TR 32.801-01 v0.1.0 on Study on 6G Management and Orchestration | draft TR | ZTE | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
available | [WTS] [JSN] | |
| S5-260627 | pCR on TR 32.801-01 Add principles on agents |
pCR revision of S5-260501 |
Samsung Electronics GmbH | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
not pursued | [WTS] [JSN] |
| S5-260628 | pCR on TR 32.801-01 Add use case on agent-driven multi-RAT management |
pCR revision of S5-260502 |
Samsung Electronics GmbH | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
merged | [WTS] [JSN] |
| S5-260677 | Planning for 6G OAM Study |
discussion revision of S5-260376 |
AT&T, ZTE | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
endorsed | [WTS] [JSN] | |
| S5-260678 | Discussion Paper: Telecom operators design principles for the 6G Study |
discussion revision of S5-260377 |
NTT Docomo, ATT, Rakuten Mobile, Orange, Verizon, Telecom Italia, Vodafone, Jio, China Mobile, Fibercop | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
endorsed | [WTS] [JSN] | |
| S5-260679 | PCR on TR 32.801-01 Add the 6G management architecture design principles |
pCR revision of S5-260168 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260680 | pCR on Rel-20 TR 32.801-01 6G principles on ES and EE architecture |
pCR revision of S5-260278 revised to S5-260841 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260681 | pCR TR32.801 6G principles on E2E Automation |
pCR revision of S5-260087 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
not pursued | [WTS] [JSN] |
| S5-260682 | pCR TR32.801 6G principles on NFs as MnFs |
pCR revision of S5-260088 |
Nokia, Rakuten | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
not pursued | [WTS] [JSN] |
| S5-260683 | pCR TR 32.801-01 Add use case on individual mobile service delivery and assurance for specific events |
pCR revision of S5-260127 |
Huawei, China Mobile, Orange, ZTE | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260684 | Rel-20 pCR TR 32.801-01 Add network experience evaluation use case for robot communication services |
pCR revision of S5-260208 |
Huawei, China Mobile, Orange | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
not pursued | [WTS] [JSN] |
| S5-260685 | Rel-20 pCR TR 32.801-01 New use case on RAN energy efficiency optimization for green network |
pCR revision of S5-260221 |
Huawei, Orange, ZTE | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260686 | Rel-20 pCR TR 32.801-01 New use case for individual service complaint handling management |
pCR revision of S5-260286 |
Huawei, CMCC, Orange | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260687 | Rel-20 pCR on TR 32.801-01 New use case on network issue handling management |
pCR revision of S5-260287 |
Huawei, Orange, ZTE | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260711 | pCR TR 32.801-01 Add key issue on data management – Terminology |
pCR revision of S5-260414 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260723 | pCR on TR 32.801-1 Add use case for hierarchical service architecture |
pCR revision of S5-260174 |
Rakuten Mobile, Inc | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
not pursued | [WTS] [JSN] |
| S5-260724 | pCR-TR 32.801-01 Knowledge Representation and Management |
pCR revision of S5-260090 revised to S5-260845 |
Nokia, Samsung | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260725 | pCR TR 32.801-01 Use case for management exposure to agents external to 3GPP system |
pCR revised to S5-260846 |
Ericsson | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260726 | pCR TR 32.801-01 consolidated-Category 2 Autonomous agent within 3GPP management system |
pCR revision of S5-260171 revised to S5-260836 |
CMCC | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260727 | pCR TR 32.801-01 Terminology on autonomous agent for management |
pCR revision of S5-260222 |
Huawei, CMCC, Ericsson | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260728 | pCR-TR 32.801-01 consolidated-data management |
pCR revision of S5-260155 |
AT&T (moderator), ZTE, Rakuten Mobile, vivo, Ericsson, Nokia, FiberCop, Orange, NEC | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260766 | Pseudo-CR on TR 32.801-01 Add Clause Structure |
pCR revision of S5-260210 |
ZTE Corporation, AT&T | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260767 | PCR on TR 32.801-01 Add the use case on 6G network digital twin |
pCR revision of S5-260170 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260768 | Rel-20 pCR on TR 32.801-01 Add cloud native Management scenario for 6G resiliency |
pCR revision of S5-260129 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260769 | pCR on TR 32.801-1 Add use case for cloud aspects of Management and Orchestration |
pCR revision of S5-260175 |
Rakuten Mobile, Inc | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260770 | Pseudo-CR TR 32.801-01 Add Management Scenario on AI service (AI-inference and AI-training) management |
pCR revision of S5-260352 |
Nokia Canada | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
not pursued | [WTS] [JSN] |
| S5-260771 | Rel-20 pCR TR 32.801-01 Efficient intent handling by inputting intent before the unplanned event |
pCR revision of S5-260285 revised to S5-260847 |
NTT DOCOMO INC. | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260772 | pCR TR32.801-01 Add use case on Ubiquitous Connectivity |
pCR revision of S5-260305 |
CATT | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260773 | Pseudo-CR on Correlation Context Structure |
pCR revision of S5-260366 revised to S5-260838 |
Ericsson GmbH, Eurolab, Orange, AT&T, Red Hat Limited, Verizon | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
revised | [WTS] [JSN] |
| S5-260814 | Rel-20 pCR to 32.801-01 on Telecom operators design principles for the 6G Study | pCR | NTT Docomo, ATT, Rakuten Mobile, Orange, Verizon, Telecom Italia, Vodafone, Jio, China Mobile, Fibercop | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260815 | pCR on TR 32.801-01 Add new usecase on Management data handling and exposure to support the AI operations and services |
pCR revision of S5-260169 |
China Mobile | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
not pursued | [WTS] [JSN] |
| S5-260836 | pCR TR 32.801-01 consolidated-Category 2 Autonomous agent within 3GPP management system |
pCR revision of S5-260726 |
CMCC | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260838 | Pseudo-CR on Correlation Context Structure |
pCR revision of S5-260773 |
Ericsson GmbH, Eurolab, Orange, AT&T, Red Hat Limited, Verizon | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260841 | pCR on Rel-20 TR 32.801-01 6G principles on ES and EE architecture |
pCR revision of S5-260680 |
Nokia | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260845 | pCR-TR 32.801-01 Knowledge Representation and Management |
pCR revision of S5-260724 |
Nokia, Samsung, China Unicom, Ericsson | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260846 | pCR TR 32.801-01 Use case for management exposure to agents external to 3GPP system |
pCR revision of S5-260725 |
Ericsson | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
| S5-260847 | Rel-20 pCR TR 32.801-01 Efficient intent handling by inputting intent before the unplanned event |
pCR revision of S5-260771 |
NTT DOCOMO INC. | 32.801-01 0.0.0 | FS_6G_OAM | Rel-20 |
S5-165 AI: 6.20.6 |
approved | [WTS] [JSN] |
104 documents (0.42635798454285 seconds)