Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-255128 Rel-20 pCR TR 28.883 Add introduction and scope pCR

revised to S5-255521

Huawei, China Mobile 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255129 Rel-20 pCR TR 28.883 Solution for NDT supporting intent feasibility check and exploration pCR

revised to S5-255522

Huawei 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255130 Rel-20 pCR TR 28.883 Solution for improvement of data generation pCR

revised to S5-255524

Huawei 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255131 Rel-20 pCR TR 28.883 Using external data for NDT modelling pCR

revised to S5-255526

Huawei, China Mobile 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255136 pCR TR 28.883 Add requirements for NDT data generation pCR

revised to S5-255525

China Mobile 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255159 Pseudo-CR on TR28.883 Use case about NDT for NTN pCR

revised to S5-255527

NTT DOCOMO INC.. 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255163 pCR on TR 28.883 Add solution of NDT reporting method pCR

revised to S5-255528

Huawei 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255257 Pseudo-CR TR 28.883 Add Solution for Capability Discovery of NDT in NDT Collaboration pCR

revised to S5-255523

ZTE Corporation 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255288 Rel-20 pCR TR 28.883 Clarification of NDTJob Modification Behaviour pCR

revised to S5-255529

L.M. Ericsson Limited 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255289 Rel-20 pCR TR 28.883 Retrieval of NDTReports associated with deleted NDTJobs pCR

revised to S5-255530

L.M. Ericsson Limited 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255290 Rel-20 pCR TR 28.883 Create and Execute NDT Job pCR

revised to S5-255531

L.M. Ericsson Limited 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255291 Rel-20 pCR TR 28.883 Clarification of Suspension and Resumption Capabilities for NDTJobs pCR

revised to S5-255532

L.M. Ericsson Limited 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255378 Rel-20 pCR TR 28.883 Add use case for job execution control pCR

revised to S5-255533

Ericsson Korea Partners Co Ltd 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

revised [WTS] [JSN]
S5-255472 TR 28.883 v0.2.0 on Study on management aspects of Network Digital Twin phase 2 draft TR Huawei FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

agreed [WTS] [JSN]
S5-255521 Rel-20 pCR TR 28.883 Add introduction and scope pCR

revision of S5-255128

Huawei, China Mobile 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255522 Rel-20 pCR TR 28.883 Solution for NDT supporting intent feasibility check and exploration pCR

revision of S5-255129

Huawei 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255523 Pseudo-CR TR 28.883 Add Solution for Capability Discovery of NDT in NDT Collaboration pCR

revision of S5-255257

ZTE Corporation 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255524 Rel-20 pCR TR 28.883 Solution for improvement of data generation pCR

revision of S5-255130

Huawei 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255525 pCR TR 28.883 Add requirements for NDT data generation pCR

revision of S5-255136

China Mobile 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255526 Rel-20 pCR TR 28.883 Using external data for NDT modelling pCR

revision of S5-255131

Huawei, China Mobile 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255527 Pseudo-CR on TR28.883 Use case about NDT for NTN pCR

revision of S5-255159

NTT DOCOMO INC.. 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255528 pCR on TR 28.883 Add solution of NDT reporting method pCR

revision of S5-255163

Huawei 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255529 Rel-20 pCR TR 28.883 Clarification of NDTJob Modification Behaviour pCR

revision of S5-255288

L.M. Ericsson Limited 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255530 Rel-20 pCR TR 28.883 Retrieval of NDTReports associated with deleted NDTJobs pCR

revision of S5-255289

L.M. Ericsson Limited 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

not pursued [WTS] [JSN]
S5-255531 Rel-20 pCR TR 28.883 Create and Execute NDT Job pCR

revision of S5-255290

L.M. Ericsson Limited 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255532 Rel-20 pCR TR 28.883 Clarification of Suspension and Resumption Capabilities for NDTJobs pCR

revision of S5-255291

L.M. Ericsson Limited 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

approved [WTS] [JSN]
S5-255533 Rel-20 pCR TR 28.883 Add use case for job execution control pCR

revision of S5-255378

Ericsson Korea Partners Co Ltd 28.883 0.1.0 FS_NDT_Ph2 Rel-20 S5-164

AI: 6.20.3

not pursued [WTS] [JSN]

27 documents (0.39985203742981 seconds)