Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R1-1911832 Scheduling of multiple DL/UL transport blocks in LTE-MTC discussion Ericsson R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1911919 Scheduling of multiple transport blocks other

revised to R1-1913403

Huawei, HiSilicon R1-99

AI: 6.2.1.3

revised [WTS] [JSN]
R1-1911982 Scheduling of multiple DL/UL transport blocks discussion Nokia, Nokia Shanghai Bell R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1912188 Sceduling of multiple DL/UL TBs for eMTC discussion Intel Corporation Rel-16 R1-99

AI: 6.2.1.3

noted [WTS] [JSN]
R1-1912334 On scheduling of multiple DL/UL transport blocks discussion Sony R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1912365 Discussion on the remaining issues of scheduling of multiple DL/UL TBs discussion Beijing Xiaomi Software Tech R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1912369 LTE-M Multiple Transport Block Grant Design Considerations discussion

revised to R1-1913508

Sierra Wireless, S.A. Rel-16 R1-99

AI: 6.2.1.3

revised [WTS] [JSN]
R1-1912376 Discussion on multiple transport blocks scheduling in MTC discussion LG Electronics R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1912411 Consideration on scheduling enhancement for MTC discussion

revised to R1-1913318

ZTE LTE_eMTC5-Core R1-99

AI: 6.2.1.3

revised [WTS] [JSN]
R1-1912679 Scheduling of multiple DL/UL transport blocks discussion

revised to R1-1913246

Qualcomm Incorporated R1-99

AI: 6.2.1.3

revised [WTS] [JSN]
R1-1912701 Scheduling of multiple DL/UL transport blocks discussion Sequans Communications Rel-16 R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1913229 Feature lead summary for Scheduling of multiple DL/UL transport blocks for LTE-MTC discussion

revised to R1-1913371

Ericsson LTE_eMTC5-Core Rel-16 R1-99

AI: 6.2.1.3

noted [WTS] [JSN]
R1-1913246 Scheduling of multiple DL/UL transport blocks discussion

revision of R1-1912679

Qualcomm Incorporated R1-99

AI: 6.2.1.3

noted [WTS] [JSN]
R1-1913318 Consideration on scheduling enhancement for MTC discussion

revision of R1-1912411

ZTE LTE_eMTC5-Core R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1913371 Feature lead summary#2 for Scheduling of multiple DL/UL transport blocks for LTE-MTC discussion

revision of R1-1913229

revised to R1-1913448

Ericsson LTE_eMTC5-Core Rel-16 R1-99

AI: 6.2.1.3

revised [WTS] [JSN]
R1-1913403 Scheduling of multiple transport blocks discussion

revision of R1-1911919

Huawei, HiSilicon LTE_eMTC5-Core Rel-16 R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1913448 Feature lead summary#3 for Scheduling of multiple DL/UL transport blocks for LTE-MTC discussion

revision of R1-1913371

revised to R1-1913533

Ericsson LTE_eMTC5-Core Rel-16 R1-99

AI: 6.2.1.3

revised [WTS] [JSN]
R1-1913508 LTE-M Multiple Transport Block Grant Design Considerations discussion

revision of R1-1912369

Sierra Wireless, S.A. Rel-16 R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]
R1-1913533 Feature lead summary#4 for Scheduling of multiple DL/UL transport blocks for LTE-MTC discussion

revision of R1-1913448

Ericsson LTE_eMTC5-Core Rel-16 R1-99

AI: 6.2.1.3

noted [WTS] [JSN]
R1-1913560 LTE-M MTBG DCI Design Option 3 Proposal from RAN1 #98bis discussion Sierra Wireless LTE_eMTC5-Core Rel-16 R1-99

AI: 6.2.1.3

not treated [WTS] [JSN]

20 documents (0.35241198539734 seconds)