Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-164055 | Resource allocation for RB interleaved PUSCH for eLAA | other | Huawei, HiSilicon |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164075 | Multi-subframe scheduling design for eLAA | other | Huawei, HiSilicon |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164127 | On the DCI design for multi-subframe scheduling | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164128 | Remaining details on resource allocation for eLAA PUSCH transmission | discussion | Intel Corporation | Rel-14 |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164197 | PUSCH scheduling for Rel-14 eLAA | discussion | CATT | Rel-14 |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164287 | Power headroom report enhancement for eLAA | other | Sony |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164319 | eLAA PUSCH transmission | other | Fujitsu |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164406 | PUSCH design details | discussion | Qualcomm Incorporated |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164407 | PUSCH and SRS multiplexing | discussion | Qualcomm Incorporated |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164408 | PUSCH resource allocation granularity | discussion | Qualcomm Incorporated |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164409 | Control details for UL scheduling | discussion | Qualcomm Incorporated |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164410 | DCI design for PUSCH scheduling in eLAA | discussion | Qualcomm Incorporated |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164479 | Remaining issues on PUSCH resource allocation | discussion | NEC |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164480 | Remaining details on multiple-subframe scheduling for LAA | discussion | NEC |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164495 | PUSCH resource allocation in LAA | discussion | LG Electronics |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164496 | Multi-subframe scheduling in LAA | discussion | LG Electronics |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164497 | Summary of email discussion on multi-subframe scheduling | discussion | LG Electronics |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164572 | HARQ for UL LAA | discussion | ZTE | LTE_eLAA-Core |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164573 | Consideration of LBT failure in LAA UL HARQ operation | discussion | ZTE | LTE_eLAA-Core |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164574 | On UL Resource Allocation for PUSCH | discussion | ZTE | LTE_eLAA-Core |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164575 | Discussion on UL scheduling for LAA | discussion | ZTE | LTE_eLAA-Core |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164576 | TPC and PHR for UL LAA | discussion | ZTE | LTE_eLAA-Core |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164578 | Discussion on UL Grant Transmission for eLAA | discussion | Spreadtrum Communications | Rel-14 |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164595 | WF on UL scheduling and transmission for LAA | discussion | ZTE | LTE_eLAA-Core |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | ||
R1-164717 | Multi-subframe scheduling for eLAA | other | Kyocera Corporation |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164740 | UL Waveform for PUSCH | other | Samsung |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164741 | Multi-subframe scheduling for PUSCH | other | Samsung |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164742 | Discussion on UL power issues for eLAA | other | Samsung |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164743 | Discussion on scheduling options for eLAA | other | Samsung |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164744 | Remaining issues on PUSCH design for eLAA | other | Samsung |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164745 | Further Discussion on PUSCH DTX Handling for eLAA | other | Samsung |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164828 | Discussion on PUSCH transmission starting within symbol #0 | other | Huawei, HiSilicon |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164829 | PHY signaling design for eLAA | other | Huawei, HiSilicon |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164831 | Discussion on equal and non-equal multi-interlace based PUSCH structure | other | Huawei, HiSilicon |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164918 | On PUSCH Transmit Power on LAA SCells | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164919 | PUSCH Resource Allocation Details | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164928 | Discussion on scheduling combinations for eLAA | discussion | ITRI |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164940 | On LAA UL/DL Scheduling Combinations | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164941 | eLAA UL scheduling / UL grant details | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164942 | On Two-Stage UL scheduling for eLAA | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164992 | DCI design for multiple-subframe scheduling for LAA UL | other | Sharp |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-164993 | Resource allocation of PUSCH for eLAA | other | Sharp |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165033 | Uplink Subframe Structure |
discussion revision of R1-163207 |
Panasonic |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165115 | Considerations on eLAA PUSCH design | other | Mediatek |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165116 | Control channel design for eLAA | other | Mediatek |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165141 | Uplink Resource Allocation Design for Enhanced LAA | other | Ericsson |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165142 | Multi-subframe scheduling design for Enhanced LAA | other | Ericsson |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165143 | Performance impact of UL short LBT periods in symbol #0 | other | Ericsson |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165144 | Solutions supporting UL short LBT period in Symbol #0 | other | Ericsson |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165145 | On Power Spectral Density Regulations for Enhanced LAA Transmissions | other | Ericsson |
R1-85 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-165185 | Discussion on PUSCH subframe structure and resource allocation for eLAA UL | discussion | NTT DOCOMO, INC. |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165186 | Discussion on UL scheduling design for eLAA | discussion | NTT DOCOMO, INC. |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165247 | Remaining details of multi-subframe scheduling for eLAA | discussion | ETRI |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165556 | WF on Multi-subframe scheduling in LAA | discussion | LG Electronics, Nokia, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, ZTE |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165557 | WF on uplink power control in LAA | discussion | LG Electronics, ZTE Microelectronics, Nubia, Intel |
R1-85 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-165638 | Second WF on Multi-subframe scheduling in LAA |
discussion revised to R1-165822 |
LG Electronics, ZTE |
R1-85 AI: 6.2.1.1 |
revised | [WTS] [JSN] | |||
R1-165647 | WF on eLAA UL/DL scheduling combinations | discussion | Nokia, Alcatel-Lucent Shanghai Bell, CATT, LG Electronics, NTT DOCOMO, Qualcomm, Intel, Ericsson, ZTE, Fujitsu, ETRI, ITL, Huawei, HiSilicon, Samsung, Kyocera, Panasonic |
R1-85 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-165649 | WF on eLAA PUSCH retransmission with synchronous HARQ | discussion | Huawei |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165717 | WF on PUSCH Transmissions with 25 µs CCA Period | discussion | Ericsson |
R1-85 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-165800 | WF on PUSCH resource allocation for eLAA | discussion | Huawei, HiSilicon, Intel, Qualcomm, NTT DOCOMO, LGE |
R1-85 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-165822 | Second WF on Multi-subframe scheduling in LAA |
discussion revision of R1-165638 |
LGE |
R1-85 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-165823 | WF on PDCCH BD in LAA | discussion | LGE |
R1-85 AI: 6.2.1.1 |
withdrawn | [WTS] [JSN] | |||
R1-165883 | WF on initial signal transmission in LAA |
discussion revision of R1-165824 |
LGE |
R1-85 AI: 6.2.1.1 |
noted | [WTS] [JSN] | |||
R1-165893 | WF on power headroom report for eLAA | discussion | Sony |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165921 | WF on UL resource allocation for eLAA | discussion | Qualcomm Incorporated |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-165923 | WF on supporting trigger based transmission for UL in eLAA | discussion | Qualcomm Incorporated |
R1-85 AI: 6.2.1.1 |
available | [WTS] [JSN] | |||
R1-166003 | Way Forward on managing UE blind decoding for LAA SCells in Rel-14 eLAA | discussion | Qualcomm |
R1-85 AI: 6.2.1.1 |
noted | [WTS] [JSN] |
67 documents (0.37370085716248 seconds)