Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S5-241171 | Add use case of Network failure simulation for TR 28.915 | pCR | NTT DOCOMO | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
noted | [WTS] [JSN] |
S5-241291 | pCR 28.915 Add use case for disaster planning |
pCR revised to S5-242012 |
Huawei | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
revised | [WTS] [JSN] |
S5-241311 | Rel-19 pCR TR28.915 Overview on NDTs |
pCR revised to S5-242016 |
Nokia | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
revised | [WTS] [JSN] |
S5-241636 | pCR Add terms of NDT for TR 28.915 |
pCR revised to S5-242017 |
China Mobile, Huawei | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
revised | [WTS] [JSN] |
S5-241637 | pCR Add concepts for TR 28.915 |
pCR revised to S5-242018 |
China Mobile, Huawei | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
revised | [WTS] [JSN] |
S5-241638 | pCR Add use case of Signaling storm analysis for TR 28.915 |
pCR revised to S5-241892 |
China Mobile, Huawei | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
revised | [WTS] [JSN] |
S5-241639 | Add use case of Visualization of network topology and traffic for TR 28.915 |
pCR revised to S5-242020 |
China Mobile, Huawei | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
revised | [WTS] [JSN] |
S5-241659 | pCR TR 28.915 Overview of network digital twin | pCR | ZTE Corporation | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
merged | [WTS] [JSN] |
S5-241660 | pCR TR 28.915 Use case on network failure and risk prediction |
pCR revised to S5-242021 |
ZTE Corporation | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
revised | [WTS] [JSN] |
S5-241661 | pCR TR 28.915 Use case on preventing signalling storm in 5GC | pCR | ZTE Corporation | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
merged | [WTS] [JSN] |
S5-241673 | pCR 28.915 Add new use case and requirements for NDT | pCR | AsiaInfo | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
withdrawn | [WTS] [JSN] |
S5-241679 | pCR 28.915 Add new use case and requirements for NDT | pCR | AsiaInfo | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
noted | [WTS] [JSN] |
S5-241704 | pCR TR 28.915 New use case on RAN energy saving policy verification |
pCR revised to S5-242138 |
Huawei, China Mobile, Deutsche Telekom | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
revised | [WTS] [JSN] |
S5-241736 | pCR 28.915 use case and requirements on ML Training for NDT | pCR | AsiaInfo | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
noted | [WTS] [JSN] |
S5-241884 | Draft TR 28.915 | draft TR | CMCC | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
approved | [WTS] [JSN] | |
S5-241892 | pCR Add use case of Signaling storm analysis for TR 28.915 |
pCR revision of S5-241638 |
China Mobile, Huawei, TIM, ZTE | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
approved | [WTS] [JSN] |
S5-242011 | Add use case of Network failure simulation for TR 28.915 | pCR | NTT DOCOMO | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
withdrawn | [WTS] [JSN] |
S5-242012 | pCR 28.915 Add use case for disaster planning |
pCR revision of S5-241291 |
Huawei, Deutsche Telekom | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
approved | [WTS] [JSN] |
S5-242016 | Rel-19 pCR TR28.915 Overview on NDTs |
pCR revision of S5-241311 |
Nokia | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
approved | [WTS] [JSN] |
S5-242017 | pCR Add terms of NDT for TR 28.915 |
pCR revision of S5-241636 |
China Mobile, Huawei, TIM, ZTE, Ericsson | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
approved | [WTS] [JSN] |
S5-242018 | pCR Add concepts for TR 28.915 |
pCR revision of S5-241637 |
China Mobile, Huawei | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
approved | [WTS] [JSN] |
S5-242019 | pCR Add use case of Signaling storm analysis for TR 28.915 | pCR | China Mobile, Huawei, TIM, ZTE | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
withdrawn | [WTS] [JSN] |
S5-242020 | Add use case of Visualization of network topology and traffic for TR 28.915 |
pCR revision of S5-241639 |
China Mobile, Huawei | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
noted | [WTS] [JSN] |
S5-242021 | pCR TR 28.915 Use case on network failure and risk prediction |
pCR revision of S5-241660 |
ZTE Corporation | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
approved | [WTS] [JSN] |
S5-242078 | Report from breakout session on NDT | report | SA5 Chair | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
noted | [WTS] [JSN] | |
S5-242138 | pCR TR 28.915 New use case on RAN energy saving policy verification |
pCR revision of S5-241704 |
Huawei, China Mobile, Deutsche Telekom, Ericsson, Nokia | 28.915 0.1.0 | FS_NDT | Rel-19 |
S5-154 AI: 6.19.5 |
approved | [WTS] [JSN] |
26 documents (0.36093688011169 seconds)