Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-251242 CCL Goal-targets and actions conflicts pCR

revised to S5-251906

Nokia, Samsung 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251243 CCL network & time scope conflicts pCR

revised to S5-251908

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251244 CCL Trigger conflicts pCR

revised to S5-251905

Nokia, Samsung 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251245 CCL Indirect target conflicts pCR

revised to S5-251907

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251246 CCL-impact assessment and resolution pCR

revised to S5-251910

Nokia, Samsung 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251247 CCL decision escalation pCR

revised to S5-251911

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251248 Coordinating CCLs with other functions pCR

revised to S5-252034

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251249 CCL General NRM pCR

revised to S5-252030

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251250 DP on CCL and ACCL modelling relationship discussion

revised to S5-252029

Nokia CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251251 CCL coordination NRM pCR

revised to S5-252035

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251252 Informative Annex on conflict handling approach pCR

revised to S5-251909

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251527 Rel-19 pCR 28.567 Triggered CCL UC and Requirements pCR

revised to S5-251904

Samsung R&D Institute UK 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251536 pCR TS 28.567 Add use case and requirements for network performance problem recovery pCR

revised to S5-251912

Huawei, Deutsche Telekom 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251662 Rel-19 CR TS 28.536 Clarify generic use of closed control loop CR Ericsson, Deutsche Telekom 28.536 19.1.0 CR#124 catB CCLM Rel-19 S5-160

AI: 6.19.4.1

not pursued [WTS] [JSN]
S5-251663 pCR on TS 28.567 introduce imported information elements pCR Ericsson, Deutsche Telekom 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

not pursued [WTS] [JSN]
S5-251749 Rel-19 pCR TS 28.567 Procedure and metrics for CCL performance monitoring pCR

revised to S5-252033

Samsung Electronics GmbH 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

revised [WTS] [JSN]
S5-251760 Draft TS28.567 draft TS Nokia CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-251904 Rel-19 pCR 28.567 Triggered CCL UC and Requirements pCR

revision of S5-251527

Samsung R&D Institute UK, Nokia, Deutsche Telekom, China Unicom 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-251905 CCL Trigger conflicts pCR

revision of S5-251244

Nokia, Samsung 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-251906 CCL Goal-targets and actions conflicts pCR

revision of S5-251242

Nokia, Samsung 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-251907 CCL Indirect target conflicts pCR

revision of S5-251245

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-251908 CCL network & time scope conflicts pCR

revision of S5-251243

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

noted [WTS] [JSN]
S5-251909 Informative Annex on conflict handling approach pCR

revision of S5-251252

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-251910 CCL-impact assessment and resolution pCR

revision of S5-251246

Nokia, Samsung 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

noted [WTS] [JSN]
S5-251911 CCL decision escalation pCR

revision of S5-251247

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-251912 pCR TS 28.567 Add use case and requirements for network performance problem recovery pCR

revision of S5-251536

Huawei, Deutsche Telekom, Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-252029 DP on CCL and ACCL modelling relationship discussion

revision of S5-251250

Nokia, Samsung CCLM Rel-19 S5-160

AI: 6.19.4.1

endorsed [WTS] [JSN]
S5-252030 CCL General NRM pCR

revision of S5-251249

Nokia, Samsung 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-252031 Rel-19 CR TS 28.536 Clarify generic use of closed control loop CR Ericsson, Deutsche Telekom 28.536 19.1.0 CR#1241 catB CCLM Rel-19 S5-160

AI: 6.19.4.1

withdrawn [WTS] [JSN]
S5-252032 pCR on TS 28.567 introduce imported information elements pCR Ericsson, Deutsche Telekom 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

withdrawn [WTS] [JSN]
S5-252033 Rel-19 pCR TS 28.567 Procedure and metrics for CCL performance monitoring pCR

revision of S5-251749

Samsung Electronics GmbH 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-252034 Coordinating CCLs with other functions pCR

revision of S5-251248

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

approved [WTS] [JSN]
S5-252035 CCL coordination NRM pCR

revision of S5-251251

Nokia 28.567 0.1.0 CCLM Rel-19 S5-160

AI: 6.19.4.1

noted [WTS] [JSN]

33 documents (0.41579508781433 seconds)