Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S5-243566 use case for handling energy shortages / brown outs pCR

revised to S5-244733

AT&T 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243671 pCR TR 28.880 Add use case of renewable energy enabling NF re-selection pCR

revised to S5-244734

China Mobile 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243742 Rel-19 inputToDraftCR TS 28.622 Add solution for Managing external management data draftCR

revised to S5-244801

Huawei, Deutsche Telekom MADCOL_Ph2 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243784 pCR TR 28.880 Overall view of energy efficient networks pCR

revised to S5-244732

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243785 pCR TR 28.880 Update use case of multi-dimensional network energy efficiency metrics pCR

revised to S5-244902

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243786 pCR TR 28.880 Potential solution of EE KPIs evaluated from network data traffic performance dimension pCR

revised to S5-244897

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243787 pCR TR 28.880 Potential solution of EE KPIs evaluated from network quality performance dimension pCR

revised to S5-244898

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243788 pCR TR 28.880 Potential solution of EE KPIs evaluated from network availability performance dimension pCR

revised to S5-244899

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243844 pCR TR 28.880 Add scope pCR

revised to S5-244731

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243848 pCR TR 28.880 Potential solution for carbon emission related information - Non-split gNB Carbon Emission pCR Huawei, Deutsche Telekom 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-243850 pCR TR 28.880 Potential solution for carbon emission related information - Operator site carbon emission pCR Huawei, Deutsche Telekom 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-243852 pCR TR 28.880 Potential solution for carbon emission related information - Non-split gNB Carbon Emission Efficiency pCR

revised to S5-244742

Huawei, Deutsche Telekom 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243853 pCR TR 28.880 Potential solution for carbon emission related information - Non-split gNB Renewable Energy Factor pCR

revised to S5-244743

Huawei, Deutsche Telekom 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243854 pCR TR 28.880 Rel-19 SA1 requirements on EC-EE pCR

revised to S5-244900

Huawei, Deutsche Telekom 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243870 Presentation of TR 28.880 to TSG SA for Information report

revised to S5-244901

Huawei Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243940 DP on deriving NFs based on geo area discussion

revised to S5-244802

Nokia MADCOL_Ph2 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-243972 pCR TR 28.880 Potential solution of renewable energy based LBO pCR

revised to S5-244738

Huawei 28.88 0.2.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-244133 Rel-19 pCR 28.880 Potential solution of energy consumption metrics pCR Ericsson LM 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-244287 pCR TR 28.880 Use Case update and solution for average gNB Energy Consumption per UE pCR Huawei, Samsung 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-244321 Rel-19 pCR TR 28.880 Add use case for Energy consumption of cloud-native NFs pCR Nokia 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-244338 Enhance potential solution for obtaining energy consumption of VNF/VNFC pCR

revised to S5-244737

Rakuten Mobile, Huawei, NTT DOCOMO 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-244410 pCR TR 28.880 Add use case Network Slice deployment considering renewable sourced energy pCR

revised to S5-244735

VODAFONE Group Plc 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-244447 Rel-19 pCR 28.880 Energy Saving Service pCR

revised to S5-244736

Samsung Shenzhen 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-244719 Draft TR 28.880 draft TR Samsung FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244731 pCR TR 28.880 Add scope pCR

revision of S5-243844

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244732 pCR TR 28.880 Overall view of energy efficient networks pCR

revision of S5-243784

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244733 use case for handling energy shortages / brown outs pCR

revision of S5-243566

AT&T, Deutsche Telekom, NTT DOCOMO 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244734 pCR TR 28.880 Add use case of renewable energy enabling NF re-selection pCR

revision of S5-243671

China Mobile 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244735 pCR TR 28.880 Add use case Network Slice deployment considering renewable sourced energy pCR

revision of S5-244410

VODAFONE Group Plc 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244736 Rel-19 pCR 28.880 Energy Saving Service pCR

revision of S5-244447

Samsung Shenzhen, Deutsche Telekom 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244737 Enhance potential solution for obtaining energy consumption of VNF/VNFC pCR

revision of S5-244338

Rakuten Mobile, Huawei, NTT DOCOMO 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244738 pCR TR 28.880 Potential solution of renewable energy based LBO pCR

revision of S5-243972

Huawei 28.88 0.2.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244739 Rel-19 pCR 28.880 Potential solution of energy consumption metrics pCR Ericsson LM 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

withdrawn [WTS] [JSN]
S5-244740 pCR TR 28.880 Potential solution for carbon emission related information - Non-split gNB Carbon Emission pCR Huawei, Deutsche Telekom, Verizon 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

withdrawn [WTS] [JSN]
S5-244741 pCR TR 28.880 Potential solution for carbon emission related information - Operator site carbon emission pCR Huawei, Deutsche Telekom 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

withdrawn [WTS] [JSN]
S5-244742 pCR TR 28.880 Potential solution for carbon emission related information - Non-split gNB Carbon Emission Efficiency pCR

revision of S5-243852

Huawei, Deutsche Telekom, Verizon 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-244743 pCR TR 28.880 Potential solution for carbon emission related information - Non-split gNB Renewable Energy Factor pCR

revision of S5-243853

Huawei, Deutsche Telekom, Verizon 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-244801 Rel-19 inputToDraftCR TS 28.622 Add solution for Managing external management data draftCR

revision of S5-243742

revised to S5-245354

Huawei, Deutsche Telekom MADCOL_Ph2 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-244802 DP on deriving NFs based on geo area discussion

revision of S5-243940

Nokia MADCOL_Ph2 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-244897 pCR TR 28.880 Potential solution of EE KPIs evaluated from network data traffic performance dimension pCR

revision of S5-243786

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244898 pCR TR 28.880 Potential solution of EE KPIs evaluated from network quality performance dimension pCR

revision of S5-243787

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

noted [WTS] [JSN]
S5-244899 pCR TR 28.880 Potential solution of EE KPIs evaluated from network availability performance dimension pCR

revision of S5-243788

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244900 pCR TR 28.880 Rel-19 SA1 requirements on EC-EE pCR

revision of S5-243854

Huawei, Deutsche Telekom 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-244901 Presentation of TR 28.880 to TSG SA for Information report

revision of S5-243870

revised to S5-245169

Huawei Rel-19 S5-156

AI: 6.19.

revised [WTS] [JSN]
S5-244902 pCR TR 28.880 Update use case of multi-dimensional network energy efficiency metrics pCR

revision of S5-243785

Huawei 28.88 0.3.0 FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]
S5-245169 Presentation of Report to TSG: TR 28.880, Version 0.4.0 for Information TS or TR cover

revision of S5-244901

Huawei FS_Energy_OAM_Ph3 Rel-19 S5-156

AI: 6.19.

approved [WTS] [JSN]

46 documents (0.41765809059143 seconds)