Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-2200022 | On phase continuity and power consistency tolerance | discussion | China Telecom | Rel-17 |
R4-101-bis-e AI: 6.18.2.2 |
noted | [WTS] [JSN] | ||
R4-2200338 | Discussion on UE requirement for JCE | other | Qualcomm Incorporated |
R4-101-bis-e AI: 6.18.2.2 |
noted | [WTS] [JSN] | |||
R4-2200471 | Views on phase continuity and power consistency for PUSCH and PUCCH repetition | other | Sony |
R4-101-bis-e AI: 6.18.2.2 |
noted | [WTS] [JSN] | |||
R4-2200926 | Discussion on testability of coverage enhancement requirements | discussion | ROHDE & SCHWARZ | Rel-17 |
R4-101-bis-e AI: 6.18.2.2 |
noted | [WTS] [JSN] | ||
R4-2201704 | On JCE phase continuity and power consistency tolerance for PUCCH and PUSCH | discussion | Ericsson | NR_cov_enh-Core | Rel-17 |
R4-101-bis-e AI: 6.18.2.2 |
noted | [WTS] [JSN] | |
R4-2201840 | Feasibility of proposed test methods for phase continuity and power consistency tolerance measurements | discussion | Anritsu Limited | NR_cov_enh-Core |
R4-101-bis-e AI: 6.18.2.2 |
noted | [WTS] [JSN] | ||
R4-2201958 | On phase continuity for multiple transmissions | other | Huawei, HiSilicon | NR_cov_enh-Core | Rel-17 |
R4-101-bis-e AI: 6.18.2.2 |
noted | [WTS] [JSN] |
7 documents (0.36617517471313 seconds)