Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-2003273 | Discussion on organization of PUSCH requirements with 30% throughput test point in specifications | other | CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003274 | Simulation results for NR PUSCH with 30% throughput test point | discussion | CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003275 | Draft CR for TS 38.104: Introduce PUSCH performance requirements at 30% throughput test point |
draftCR revised to R4-2005552 |
CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
revised | [WTS] [JSN] | |
R4-2003276 | Draft CR for TS 38.141-1: Introduce PUSCH performance requirements at 30% throughput test point |
draftCR revised to R4-2005553 |
CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
revised | [WTS] [JSN] | |
R4-2003277 | Draft CR for TS 38.141-2: Introduce PUSCH performance requirements at 30% throughput test point |
draftCR revised to R4-2005554 |
CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
revised | [WTS] [JSN] | |
R4-2003445 | Discussion on Structure and applicability rule for 30% TP test point | discussion | Ericsson | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003447 | Discussion on PUSCH demodulation requirements at 30% Thp | other | Ericsson | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003545 | Summary of ideal and impairment results for NR PUSCH with 30% throughput test point |
discussion revised to R4-2005574 |
CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
revised | [WTS] [JSN] | |
R4-2003627 | Remaining issues on PUSCH 30% TP test point | other | NTT DOCOMO, INC. | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003700 | Disc on NR PUSCH 30percent TP perf capturing | discussion | Huawei, HiSilicon | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003701 | Simulation results for NR Rel-16 BS performance requirements for 30% TP test point | discussion | Huawei, HiSilicon | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003896 | On NR Rel-16 performance requirement enhancement BS demodulation 30% TP test point | discussion | Nokia, Nokia Shanghai Bell | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003897 | NR Rel-16 performance requirement enhancement BS demodulation simulation results | discussion | Nokia, Nokia Shanghai Bell | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2003954 | On Rel-16 demodulation requirements for 30% throughput testing points | discussion | ZTE Wistron Telecom AB | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2004902 | On channel bandwidth for 30% throughput PUSCH demodulation requirements | discussion | China Telecom | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2004903 | Simulation results for 30% throughput PUSCH demodulation requirements | discussion | China Telecom | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2004920 | Updated simulation results for Rel-16 performance enhancement | discussion | Samsung | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] | |
R4-2005552 | Draft CR for TS 38.104: Introduce PUSCH performance requirements at 30% throughput test point |
draftCR revision of R4-2003275 |
CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
endorsed | [WTS] [JSN] | |
R4-2005553 | Draft CR for TS 38.141-1: Introduce PUSCH performance requirements at 30% throughput test point |
draftCR revision of R4-2003276 |
CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
endorsed | [WTS] [JSN] | |
R4-2005554 | Draft CR for TS 38.141-2: Introduce PUSCH performance requirements at 30% throughput test point |
draftCR revision of R4-2003277 |
CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
endorsed | [WTS] [JSN] | |
R4-2005574 | Summary of ideal and impairment results for NR PUSCH with 30% throughput test point |
discussion revision of R4-2003545 |
CATT | NR_perf_enh-Perf | Rel-16 |
R4-ah-38107 AI: 6.18.2.1 |
noted | [WTS] [JSN] |
21 documents (0.37010502815247 seconds)