Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2404940 NTN enhancement - NTN UE Rx antenna performance other Ericsson NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

noted [WTS] [JSN]
R4-2404942 NTN enhancement: draft CR to TS 38.101-5 NTN Ka-band - additional Rx updates to the running CR draftCR Ericsson, Thales NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

merged [WTS] [JSN]
R4-2405314 Discussions on NTN UE RF Rx requirements discussion Samsung NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

noted [WTS] [JSN]
R4-2405338 Draft CR for 38.101-5 to introduce clause 10.1~10.3 draftCR

revised to R4-2406606

Huawei, HiSilicon NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

revised [WTS] [JSN]
R4-2405342 Discussion on Rx requirement for Ka band NTN UE other Huawei, HiSilicon NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

noted [WTS] [JSN]
R4-2405343 Draft CR for TR 38.863 to introduce some technical background for R18 NTN VSAT UE Rx requirements draftCR

revised to R4-2406607

Huawei, HiSilicon NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

revised [WTS] [JSN]
R4-2405642 Further discussion on Rx RF requirements for NTN in Ka-band other ZTE Corporation R4-110-bis

AI: 6.16.5.2

noted [WTS] [JSN]
R4-2405643 Draft CR to TS 38.101-5 Clause 10.4 Maximum input power requirement draftCR

revised to R4-2406608

ZTE Corporation NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

revised [WTS] [JSN]
R4-2405644 Draft CR to TS 38.101-5 Clause 10.6 Blocking characteristics draftCR ZTE Corporation NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

not pursued [WTS] [JSN]
R4-2405645 Draft CR to TS 38.101-5 Annex NTN VSAT related FRC draftCR ZTE Corporation NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

not pursued [WTS] [JSN]
R4-2405974 THALES, Magister Solutions Ltd, Eutelsat Group, ESA, Inmarsat, Viasat, Novamint, EchoStar, Amazon discussion THALES Rel-18 R4-110-bis

AI: 6.16.5.2

withdrawn [WTS] [JSN]
R4-2406606 Draft CR for 38.101-5 to introduce clause 10.1~10.3 draftCR

revision of R4-2405338

Huawei, HiSilicon, Ericsson, Thales NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

endorsed [WTS] [JSN]
R4-2406607 Draft CR for TR 38.863 to introduce some technical background for R18 NTN VSAT UE Rx requirements draftCR

revision of R4-2405343

Huawei, HiSilicon NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

endorsed [WTS] [JSN]
R4-2406608 Draft CR to TS 38.101-5 Clause 10.4 Maximum input power requirement draftCR

revision of R4-2405643

ZTE Corporation NR_NTN_enh-Core Rel-18 R4-110-bis

AI: 6.16.5.2

endorsed [WTS] [JSN]

14 documents (0.34937596321106 seconds)