Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-2003202 | Discussion of RRM requirements for BWP switching on multiple CCs | discussion | Intel Corporation | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2003356 | Further consideration on BWP switch on mulitple CCs | discussion | vivo | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2003357 | Consideration on interruption period of BWP switching on multiple CCs | discussion | vivo | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2003379 | Further consideration on BWP switch on mulitple CCs | discussion | vivo | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2003380 | Consideration on interruption period of BWP switching on multiple CCs | discussion | vivo | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2003396 | RRM requirements for BWP switching on multiple CCs | discussion | Apple | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2003504 | Discussion on BWP switch on multiple CC | discussion | MediaTek inc. | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2003652 | Draft CR to TS 38.133: BWP switching on multiple CCs RRM requirements | draftCR | Intel Corporation | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
postponed | [WTS] [JSN] | |
R4-2003962 | Discussion on requirements for BWP switch delay on multiple CC | discussion | NEC | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2003980 | On RRM requirements for BWP switching on multiple CCs | discussion | OPPO | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2004244 | Discussion on partial overlap BWP switching on multiple CCs | discussion | Huawei, Hisilicon | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2004245 | Discussion on simultaneous BWP switching on multiple CCs | discussion | Huawei, Hisilicon | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2004406 | Further analysis of partially overlapped BWP triggering on multiple CCs | other | Ericsson | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2004425 | On Simultaneously Triggered BWP Switching on Multiple CCs | discussion | Ericsson | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2004518 | discussion on BWP switch on multiple CCs | discussion | Nokia, Nokia Shanghai Bell | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] | |
R4-2004519 | CR on 36133 interruption requirements for BWP switching on multiple CCs | draftCR | Nokia, Nokia Shanghai Bell | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
postponed | [WTS] [JSN] | |
R4-2004520 | CR on 38133 interruption requirements for BWP switching on multiple CCs | draftCR | Nokia, Nokia Shanghai Bell | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
postponed | [WTS] [JSN] | |
R4-2004521 | CR on 38133 delay requirements for BWP switching on multiple CCs | draftCR | Nokia, Nokia Shanghai Bell | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
postponed | [WTS] [JSN] | |
R4-2004784 | Further discussion on timeline for BWP switch for multiple cells | discussion | Qualcomm Incorporated | NR_RRM_enh-Core | Rel-16 |
R4-ah-38107 AI: 6.15.1.4 |
noted | [WTS] [JSN] |
19 documents (0.3653929233551 seconds)