Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1903589 Discussion on requirements for CBD discussion MediaTek inc. NR_newRAT-Core Rel-15 R4-90

AI: 6.10.8.2

noted [WTS] [JSN]
R4-1903590 CR for scheduling availability for CBD draftCR MediaTek inc. NR_newRAT-Core Rel-15 R4-90

AI: 6.10.8.2

not pursued [WTS] [JSN]
R4-1903591 CR for CBD evaluation period with DRX draftCR MediaTek inc. NR_newRAT-Core Rel-15 R4-90

AI: 6.10.8.2

endorsed [WTS] [JSN]
R4-1903736 DraftCR on correcting scheduling restrictions requirements for CBD (section 8.5.8) draftCR

revised to R4-1904707

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-90

AI: 6.10.8.2

revised [WTS] [JSN]
R4-1903943 Beam Candidate Detection Latencies discussion Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-90

AI: 6.10.8.2

noted [WTS] [JSN]
R4-1903944 CR Beam Candidate Detection Latencies section 8.5.5 draftCR

revised to R4-1904708

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-90

AI: 6.10.8.2

revised [WTS] [JSN]
R4-1904707 DraftCR on correcting scheduling restrictions requirements for CBD (section 8.5.8) draftCR

revision of R4-1903736

Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-90

AI: 6.10.8.2

endorsed [WTS] [JSN]
R4-1904708 CR Beam Candidate Detection Latencies section 8.5.5 draftCR

revision of R4-1903944

Nokia, Nokia Shanghai Bell NR_newRAT-Core Rel-15 R4-90

AI: 6.10.8.2

endorsed [WTS] [JSN]

8 documents (0.3465940952301 seconds)