Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-1905592 | Reply LS on RRC processing delay for BWP switching |
LS out LS is reply to R2-1818901 LS To: RAN2 revised to R4-1907214 |
Huawei, HiSilicon | NR_newRAT-Core |
R4-91 AI: 6.10.7.5.1 |
revised | [WTS] [JSN] | ||
R4-1905720 | On the requirement for RRC based BWP switching | discussion | Intel Corporation | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
noted | [WTS] [JSN] | |
R4-1905721 | Reply LS on RRC based BWP switching |
LS out LS is reply to R2-1818901 LS To: RAN2 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
noted | [WTS] [JSN] | |
R4-1906242 | CR section 8.6.3 RRC-based BWP switch delay | draftCR | Nokia, Nokia Shanghai Bell | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
not pursued | [WTS] [JSN] | |
R4-1906244 | Response LS on RRC processing delay for BWP switching |
LS out LS is reply to R2-1818901 LS To: RAN2 |
Nokia, Nokia Shanghai Bell | NR_newRAT-Core |
R4-91 AI: 6.10.7.5.1 |
noted | [WTS] [JSN] | ||
R4-1906261 | Remaining Issues on BWP Switch Delay | discussion | MediaTek inc. | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
noted | [WTS] [JSN] | |
R4-1906262 | CR on RRC based BWP switch delay (8.6) | draftCR | MediaTek inc. | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
endorsed | [WTS] [JSN] | |
R4-1906317 | RRC based BWP Switching Delay | discussion | NEC | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
noted | [WTS] [JSN] | |
R4-1906320 | Draft CR to 38.133: RRC based BWP switch delay requirements | draftCR | NEC | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
not pursued | [WTS] [JSN] | |
R4-1906762 | Further analysis of RRC based BWP switching delay | other | Ericsson | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
noted | [WTS] [JSN] | |
R4-1906763 | RRC based BWP switching delay requirement (8.6.3) | draftCR | Ericsson | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
not pursued | [WTS] [JSN] | |
R4-1906977 | RRC based BWP swtich delay | discussion | Qualcomm Incorporated |
R4-91 AI: 6.10.7.5.1 |
withdrawn | [WTS] [JSN] | |||
R4-1906988 | Discussion on RRC based BWP swtich delay | discussion | Qualcomm Incorporated |
R4-91 AI: 6.10.7.5.1 |
noted | [WTS] [JSN] | |||
R4-1907214 | Reply LS on RRC processing delay for BWP switching |
LS out LS is reply to R2-1818901 (R4-1816420) LS To: RAN2 revision of R4-1905592 |
Huawei, HiSilicon | NR_newRAT-Core | Rel-15 |
R4-91 AI: 6.10.7.5.1 |
approved | [WTS] [JSN] |
14 documents (0.33988189697266 seconds)