Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1910963 Editorial correction for SCell activation and deactivation delay draftCR CATT NR_newRAT-Core Rel-15 R4-92

AI: 6.10.7.2

endorsed [WTS] [JSN]
R4-1911307 Discussion on NR SCell activation discussion MediaTek inc. NR_newRAT-Core Rel-15 R4-92

AI: 6.10.7.2

noted [WTS] [JSN]
R4-1911308 CR for SCell activation delay in FR2 draftCR

revised to R4-1912844

MediaTek inc. NR_newRAT-Core Rel-15 R4-92

AI: 6.10.7.2

revised [WTS] [JSN]
R4-1911949 CR on SCell activation requirements (section 8.3.2) draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-92

AI: 6.10.7.2

merged [WTS] [JSN]
R4-1912373 CR 38.133 (8.3.2) Amendment of requirements depending on T_SMTC_MAX draftCR Ericsson NR_newRAT-Core Rel-15 R4-92

AI: 6.10.7.2

endorsed [WTS] [JSN]
R4-1912374 CR 38.133 (8.3.3) Correction to SCell deactivation delay draftCR Ericsson NR_newRAT-Core Rel-15 R4-92

AI: 6.10.7.2

endorsed [WTS] [JSN]
R4-1912844 CR for SCell activation delay in FR2 draftCR

revision of R4-1911308

MediaTek inc. NR_newRAT-Core Rel-15 R4-92

AI: 6.10.7.2

postponed [WTS] [JSN]

7 documents (0.3494930267334 seconds)