Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1905718 On UE timing adjustment under beam switching discussion Intel Corporation NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

noted [WTS] [JSN]
R4-1905719 CR on UE timing adjustment under beam switching (Section 7.1.2) draftCR Intel Corporation NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

not pursued [WTS] [JSN]
R4-1906128 Discussion on timing requirement due to FR2 beam switching discussion Samsung R&D Institute UK Rel-15 R4-91

AI: 6.10.6.1.1

withdrawn [WTS] [JSN]
R4-1906129 Discussion on timing requirement due to FR2 beam switching discussion Samsung R&D Institute UK Rel-15 R4-91

AI: 6.10.6.1.1

withdrawn [WTS] [JSN]
R4-1906130 Discussion on timing requirement due to FR2 beam switching discussion Samsung R&D Institute UK Rel-15 R4-91

AI: 6.10.6.1.1

withdrawn [WTS] [JSN]
R4-1906131 Discussion on timing requirement due to FR2 beam switching discussion Samsung R&D Institute UK Rel-15 R4-91

AI: 6.10.6.1.1

withdrawn [WTS] [JSN]
R4-1906132 Discussion on timing requirement due to FR2 beam switching discussion Samsung R&D Institute UK Rel-15 R4-91

AI: 6.10.6.1.1

noted [WTS] [JSN]
R4-1906258 UE UL timing adjustment due to Rx beam change discussion MediaTek inc. NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

noted [WTS] [JSN]
R4-1906259 CR on timing change due to Rx beam change (7.1.2 and B.2.6) draftCR MediaTek inc. NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

not pursued [WTS] [JSN]
R4-1906503 Discussion on remaining issues on UE timing requirements due to beam transition discussion Huawei, HiSilicon R4-91

AI: 6.10.6.1.1

noted [WTS] [JSN]
R4-1906504 Draft CR on maintaining UE timing requirements (section 7.1) draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

not pursued [WTS] [JSN]
R4-1906505 DraftCR on interruption requirements due to TCI state switching in FR2 (new section 8.2.5) draftCR Huawei, HiSilicon NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

not pursued [WTS] [JSN]
R4-1906760 Remaining Issues on UE Timing Requirements under Beam Switch other Ericsson NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

noted [WTS] [JSN]
R4-1906761 UE Transmit Timing Requirements under Beam Switch (7.1.2) draftCR

revised to R4-1907204

Ericsson NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

revised [WTS] [JSN]
R4-1906973 UL Timing adjustment on UE beam switch discussion Qualcomm Incorporated R4-91

AI: 6.10.6.1.1

withdrawn [WTS] [JSN]
R4-1906984 UL Timing adjustment on UE beam switch discussion Qualcomm Incorporated R4-91

AI: 6.10.6.1.1

noted [WTS] [JSN]
R4-1907203 Way forward on UE timing adjustment with Beam switching other Ericsson, Intel, Mediatek, Nokia, Nokia Shanghai Bell, Qualcomm R4-91

AI: 6.10.6.1.1

approved [WTS] [JSN]
R4-1907204 UE Transmit Timing Requirements under Beam Switch (7.1.2) draftCR

revision of R4-1906761

Ericsson, Intel, Mediatek, Nokia, Nokia Shangai Bell NR_newRAT-Core Rel-15 R4-91

AI: 6.10.6.1.1

endorsed [WTS] [JSN]

18 documents (0.33680415153503 seconds)