Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2003557 On new UL BWP switching requirements in NR-U discussion Qualcomm Incorporated NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

noted [WTS] [JSN]
R4-2004263 CR on introduction of Active BWP switching delay requirements for NR-U draftCR

revised to R4-2005372

Huawei, Hisilicon NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

revised [WTS] [JSN]
R4-2004268 Discussion on BWP switch for NR-U discussion Huawei, Hisilicon NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

noted [WTS] [JSN]
R4-2004402 Analysis of BWP switching requirement due to consistent UL failure other Ericsson NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

noted [WTS] [JSN]
R4-2004403 BWP switching delay requirement due to consistent UL failure in 38.133 draftCR Ericsson NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

not pursued [WTS] [JSN]
R4-2004404 BWP switching interruption requirement due to consistent UL failure in 38.133 draftCR Ericsson NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

endorsed [WTS] [JSN]
R4-2004405 Interruption due to BWP switching at consistent UL failure in 36.133 draftCR Ericsson NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

endorsed [WTS] [JSN]
R4-2004938 On BWP switch in NR-U discussion ZTE Corporation NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

noted [WTS] [JSN]
R4-2005370 BWP switching interruption requirement due to consistent UL failure in 38.133 draftCR Ericsson NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

withdrawn [WTS] [JSN]
R4-2005371 Interruption due to BWP switching at consistent UL failure in 36.133 draftCR Ericsson NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

withdrawn [WTS] [JSN]
R4-2005372 CR on introduction of Active BWP switching delay requirements for NR-U draftCR

revision of R4-2004263

Huawei, Hisilicon NR_unlic-Core Rel-16 R4-ah-38107

AI: 6.1.5.9

endorsed [WTS] [JSN]

11 documents (0.35683298110962 seconds)