Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
C4-205277 Key Issue on Mechanism to select the target PLMN based on GPSI when using SBI pCR Ericsson 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205282 Pseudo-CR on Scope for TR 29.829 pCR

revised to C4-205639

China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205283 Pseudo-CR on References for TR 29.829 pCR China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205284 Pseudo-CR on Definitions of terms, symbols and abbreviations for TR 29.829 pCR China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205285 Pseudo-CR on Overall Requirement for TR 29.829 pCR

revised to C4-205641, C4-205643

China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205286 Pseudo-CR on adding Key Issue of SBI-based SM MO pCR

revised to C4-205644

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205287 Pseudo-CR on adding Key Issue of SBI-based SM MT pCR

revised to C4-205659

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205288 Pseudo-CR on Solution for KI SBI-based SM MO pCR

revised to C4-205666

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205289 Pseudo-CR on Solution for KI SBI-based SM MT pCR

revised to C4-205673

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205464 Solution for Service-based support for SMS MO in 5GC pCR Orange 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

merged [WTS] [JSN]
C4-205465 pCR on Solution of Service-based support for SMS in 5GC pCR Orange 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

merged [WTS] [JSN]
C4-205639 Pseudo-CR on Scope for TR 29.829 pCR

revision of C4-205282

revised to C4-205720

China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205641 Pseudo-CR on Overall Requirement for TR 29.829 pCR

revision of C4-205285

revised to C4-205721

China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205643 Pseudo-CR on Overall Requirement for TR 29.829 pCR

revision of C4-205285

China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

withdrawn [WTS] [JSN]
C4-205644 Pseudo-CR on adding Key Issue of SBI-based SM MO pCR

revision of C4-205286

revised to C4-205722

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205659 Pseudo-CR on adding Key Issue of SBI-based SM MT pCR

revision of C4-205287

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205666 Pseudo-CR on Solution for KI SBI-based SM MO pCR

revision of C4-205288

revised to C4-205723

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205673 Pseudo-CR on Solution for KI SBI-based SM MT pCR

revision of C4-205289

revised to C4-205724

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

revised [WTS] [JSN]
C4-205720 Pseudo-CR on Scope for TR 29.829 pCR

revision of C4-205639

China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205721 Pseudo-CR on Overall Requirement for TR 29.829 pCR

revision of C4-205641

China Telecom, Orange, ZTE 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205722 Pseudo-CR on adding Key Issue of SBI-based SM MO pCR

revision of C4-205644

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205723 Pseudo-CR on Solution for KI SBI-based SM MO pCR

revision of C4-205666

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205724 Pseudo-CR on Solution for KI SBI-based SM MT pCR

revision of C4-205673

China Telecom Corporation Ltd. 29.829 0.1.0 SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]
C4-205772 TR 29.829 v.0.2.0 Study on Service-based support for SMS in 5GC draft TR China Telecom SMS_SBI Rel-17 C4-101-e

AI: 6.1.5

agreed [WTS] [JSN]

24 documents (0.37442708015442 seconds)