Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-185723 | Correction to NR RRC test case 8.2.3.14.1 |
CR revised to R5-186091 |
Keysight Technologies UK Ltd | 38.523-1 15.1.0 CR#76 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-185724 | Correction to NR RRC test case 8.2.3.13.1 |
CR revised to R5-186092 |
Keysight Technologies UK Ltd | 38.523-1 15.1.0 CR#77 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-185774 | Update RRC TC 8.2.3.1.1 - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC |
CR revised to R5-186151 |
Qualcomm UK Ltd | 38.523-1 15.1.0 CR#92 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-185799 | Addition of NR test case 8.2.3.11.1_gapFR1 |
CR revised to R5-186152 |
Huawei, Hisilicon | 38.523-1 15.1.0 CR#100 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-185800 | Addition of NR test case 8.2.3.11.2_gapFR2 |
CR revised to R5-186153 |
Huawei, Hisilicon | 38.523-1 15.1.0 CR#101 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-185930 | Update to 5G-NR RRC measurement report TCs for FR1/FR2 cell power level |
CR revised to R5-186095 |
Qualcomm Incorporated, Tech Mahindra | 38.523-1 15.1.0 CR#113 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-185932 | Update to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / RSRQ based measurements / EN-DC | CR | Qualcomm Incorporated | 38.523-1 15.1.0 CR#115 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-185933 | Update to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of NR cells / EN-DC |
CR revised to R5-186096 |
Qualcomm Incorporated | 38.523-1 15.1.0 CR#116 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-185934 | Update to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC |
CR revised to R5-186097 |
Qualcomm Incorporated | 38.523-1 15.1.0 CR#117 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-185966 | Update RRC TC8.2.3.7.1 - Measurement configuration control and reporting / Event A4 (intra-frequency, inter-frequency and inter-band measurements) / Measurement of Neighbour NR cell / EN-DC |
CR revised to R5-186098 |
Tech Mahindra Limited | 38.523-1 15.1.0 CR#125 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-186015 | Correction to NR RRC test case 8.2.3.5.1 |
CR revised to R5-186099 |
Anritsu Ltd | 38.523-1 15.1.0 CR#131 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-186023 | Update of 5GS NR RRC test case 8.2.3.6.1 |
CR revised to R5-186156 |
Rohde&Schwarz | 38.523-1 15.1.0 CR#133 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-186024 | Update of 5GS NR RRC test case 8.2.3.8.1 |
CR revised to R5-186157 |
Rohde&Schwarz | 38.523-1 15.1.0 CR#134 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-186091 | Correction to NR RRC test case 8.2.3.14.1 |
CR revision of R5-185723 |
Keysight Technologies UK Ltd | 38.523-1 15.1.0 CR#761 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186092 | Correction to NR RRC test case 8.2.3.13.1 |
CR revision of R5-185724 |
Keysight Technologies UK Ltd | 38.523-1 15.1.0 CR#771 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186095 | Update to 5G-NR RRC measurement report TCs for FR1/FR2 cell power level |
CR revision of R5-185930 |
Qualcomm Incorporated, Tech Mahindra | 38.523-1 15.1.0 CR#1131 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186096 | Update to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of NR cells / EN-DC |
CR revision of R5-185933 |
Qualcomm Incorporated | 38.523-1 15.1.0 CR#1161 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186097 | Update to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC |
CR revision of R5-185934 |
Qualcomm Incorporated | 38.523-1 15.1.0 CR#1171 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186098 | Update RRC TC8.2.3.7.1 - Measurement configuration control and reporting / Event A4 (intra-frequency, inter-frequency and inter-band measurements) / Measurement of Neighbour NR cell / EN-DC |
CR revision of R5-185966 revised to R5-186154 |
Tech Mahindra Limited | 38.523-1 15.1.0 CR#1251 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
revised | [WTS] [JSN] |
R5-186099 | Correction to NR RRC test case 8.2.3.5.1 |
CR revision of R5-186015 |
Anritsu Ltd | 38.523-1 15.1.0 CR#1311 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186151 | Update RRC TC 8.2.3.1.1 - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC |
CR revision of R5-185774 |
Qualcomm UK Ltd | 38.523-1 15.1.0 CR#921 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186152 | Addition of NR test case 8.2.3.11.1_gapFR1 |
CR revision of R5-185799 |
Huawei, Hisilicon | 38.523-1 15.1.0 CR#1001 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186153 | Addition of NR test case 8.2.3.11.2_gapFR2 |
CR revision of R5-185800 |
Huawei, Hisilicon | 38.523-1 15.1.0 CR#1011 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186154 | Update RRC TC8.2.3.7.1 - Measurement configuration control and reporting / Event A4 (intra-frequency, inter-frequency and inter-band measurements) / Measurement of Neighbour NR cell / EN-DC |
CR revision of R5-186098 |
Tech Mahindra Limited | 38.523-1 15.1.0 CR#1252 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186156 | Update of 5GS NR RRC test case 8.2.3.6.1 |
CR revision of R5-186023 |
Rohde&Schwarz | 38.523-1 15.1.0 CR#1331 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
R5-186157 | Update of 5GS NR RRC test case 8.2.3.8.1 |
CR revision of R5-186024 |
Rohde&Schwarz | 38.523-1 15.1.0 CR#1341 catF | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-ah-33362 AI: 6.1.3.4.2.3 |
agreed | [WTS] [JSN] |
26 documents (0.36147689819336 seconds)