Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
C4-210039 Name and Key Issue of solution #2 pCR

revised to C4-210154

Nokia, Nokia Shanghai Bell 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210040 Editorial corrections pCR Nokia, Nokia Shanghai Bell 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210041 Evaluation and Conclusions for Key Issue #3 pCR Nokia, Nokia Shanghai Bell 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210045 LS Response on Support of L2TP in PFCP LS in

source LS: S2-2009331

LS To: CT4

LS reply in C4-205478

SA2 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

noted [WTS] [JSN]
C4-210050 Solution for L2TP Tunnel and Session Setup and Release pCR

revised to C4-210168

Ericsson 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210051 Signaling flow for L2TP Tunnel and Session Setup pCR

revised to C4-210169

Ericsson 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210052 Security Considerations for L2TP Tunnel and Session Management pCR

revised to C4-210170

Ericsson 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210060 Update UP Function Initiated L2TP Tunnel Setup Solution pCR ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

merged [WTS] [JSN]
C4-210061 UP Function Controlled UE IP Address Portion pCR

revised to C4-210159

ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210062 Key Issue of Tethering Control pCR

revised to C4-210155

ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210063 Solution for Tethering Control pCR ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210064 Key Issue of PFCP Efficiency for Combined Node pCR ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210065 Solution for Improving PFCP Efficiency for Combined Node pCR ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210101 UE IP address/prefix Allocation pCR Huawei 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210102 L2TP function pCR Huawei 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210108 New Key Issue on Enhancements to Framed-Routing Feature pCR Samsung 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210109 Pseudo-CR on Updates of Solution#9 pCR

revised to C4-210180, C4-210181

China Telecommunications 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210126 Key Issue on Load Control Enhancement pCR CATT 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210127 Solution to Load Control Enhancement-Adding Load Control Information in Heartbeat messages pCR CATT 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210128 Update to Solution #2. pCR CATT 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

merged [WTS] [JSN]
C4-210129 Recommending UP function to support the feature of allocating UE IP addressprefix pCR CATT 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210130 Solution to Key Issue #5-Enabing UP function to support the feature of L2TP version handling pCR

revised to C4-210182

CATT 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210131 Solution#2 clarification for SMF added or removed tofrom the SMF set pCR

revised to C4-210205

China Mobile Com. Corporation 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210132 Adding signaling flow and impact analysis for solution#2 pCR

revised to C4-210203

China Mobile Com. Corporation 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210135 Draft LS on the Security consideration to support L2TP with CUPS LS out

LS To: SA3

revised to C4-210171

Ericsson BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210154 Name and Key Issue of solution #2 pCR

revision of C4-210039

Nokia, Nokia Shanghai Bell, CATT, China Mobile 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210155 Key Issue of Tethering Control pCR

revision of C4-210062

ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210159 UP Function Controlled UE IP Address Portion pCR

revision of C4-210061

revised to C4-210196

ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210168 Solution for L2TP Tunnel and Session Setup and Release pCR

revision of C4-210050

Ericsson 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210169 Signaling flow for L2TP Tunnel and Session Setup pCR

revision of C4-210051

Ericsson 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210170 Security Considerations for L2TP Tunnel and Session Management pCR

revision of C4-210052

Ericsson 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210171 LS on the Security consideration to support L2TP with CUPS LS out

LS To: SA3

revision of C4-210135

Ericsson BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

approved [WTS] [JSN]
C4-210180 Pseudo-CR on Updates of Solution#9 pCR

revision of C4-210109

China Telecommunications 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

withdrawn [WTS] [JSN]
C4-210181 Pseudo-CR on Updates of Solution#9 pCR

revision of C4-210109

China Telecommunications 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210182 Solution to Key Issue #5-Enabing UP function to support the feature of L2TP version handling pCR

revision of C4-210130

CATT 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

postponed [WTS] [JSN]
C4-210196 UP Function Controlled UE IP Address Portion pCR

revision of C4-210159

revised to C4-210214

ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210203 Adding signaling flow and impact analysis for solution#2 pCR

revision of C4-210132

revised to C4-210219

China Mobile Com. Corporation 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210205 Solution#2 clarification for SMF added or removed tofrom the SMF set pCR

revision of C4-210131

revised to C4-210220

China Mobile Com. Corporation 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210214 UP Function Controlled UE IP Address Portion pCR

revision of C4-210196

ZTE 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210219 Adding signaling flow and impact analysis for solution#2 pCR

revision of C4-210203

revised to C4-210223

China Mobile Com. Corporation 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

revised [WTS] [JSN]
C4-210220 Solution#2 clarification for SMF added or removed tofrom the SMF set pCR

revision of C4-210205

China Mobile Com. Corporation,CATT 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210223 Adding signaling flow and impact analysis for solution#2 pCR

revision of C4-210219

China Mobile Com. Corporation 29.820 0.3.0 BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]
C4-210243 TR 29.820 v0.4.0 draft TR China Mobile BEPoP Rel-17 C4-101-bis-e

AI: 6.1.3

agreed [WTS] [JSN]

43 documents (0.35767889022827 seconds)