Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
C4-235044 pCR on TR 29.866 Key lssue #X Preventing the IMS disaster in the HSSUDM overload scenario pCR

revised to C4-235247

China Telecom Corporation Ltd. 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

revised [WTS] [JSN]
C4-235045 pCR on TR 29.866 Solution#X Solution for Preventing the IMS Disaster in the HSSUDM Overload Scenario pCR

revised to C4-235248

China Telecom Corporation Ltd. 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

revised [WTS] [JSN]
C4-235145 New solution for MT procedure in case of HSS/UDM failure pCR ZTE 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

postponed [WTS] [JSN]
C4-235146 New solution for AS-MT procedure in case of HSS/UDM failure pCR ZTE 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

postponed [WTS] [JSN]
C4-235210 Solution for KI#1 pCR Huawei, HiSilicon 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

postponed [WTS] [JSN]
C4-235211 Solution for KI#2 pCR Huawei, HiSilicon 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

postponed [WTS] [JSN]
C4-235212 Solution for KI#3 pCR Huawei, HiSilicon 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

postponed [WTS] [JSN]
C4-235247 pCR on TR 29.866 Key lssue #X Preventing the IMS disaster in the HSSUDM overload scenario pCR

revision of C4-235044

revised to C4-235280

Esurfing IoT, China Telecom 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

revised [WTS] [JSN]
C4-235248 pCR on TR 29.866 Solution#X Solution for Preventing the IMS Disaster in the HSSUDM Overload Scenario pCR

revision of C4-235045

revised to C4-235281

Esurfing IoT, China Telecom. 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

revised [WTS] [JSN]
C4-235280 pCR on TR 29.866 Key lssue #X Preventing the IMS disaster in the HSSUDM overload scenario pCR

revision of C4-235247

revised to C4-235445

China Telecom 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

revised [WTS] [JSN]
C4-235281 pCR on TR 29.866 Solution#X Solution for Preventing the IMS Disaster in the HSSUDM Overload Scenario pCR

revision of C4-235248

revised to C4-235446

China Telecom. 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

revised [WTS] [JSN]
C4-235445 pCR on TR 29.866 Key lssue #X Preventing the IMS disaster in the HSSUDM overload scenario pCR

revision of C4-235280

revised to C4-235574

China Telecom 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

revised [WTS] [JSN]
C4-235446 pCR on TR 29.866 Solution#X Solution for Preventing the IMS Disaster in the HSSUDM Overload Scenario pCR

revision of C4-235281

revised to C4-235575

China Telecom. 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

revised [WTS] [JSN]
C4-235574 pCR on TR 29.866 Key lssue #X Preventing the IMS disaster in the HSSUDM overload scenario pCR

revision of C4-235445

China Telecom 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

agreed [WTS] [JSN]
C4-235575 pCR on TR 29.866 Solution#X Solution for Preventing the IMS Disaster in the HSSUDM Overload Scenario pCR

revision of C4-235446

China Telecom. 29.866 0.1.0 FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

agreed [WTS] [JSN]
C4-235658 3GPP TR 29.866 draft TR China Telecom FS_IMS_RES Rel-18 C4-119

AI: 6.1.14

agreed [WTS] [JSN]

16 documents (0.36294984817505 seconds)