Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R1-1720020 Correction on MPDCCH assignment procedure for Type1-MPDCCH common search space draftCR

revised to R1-1721118

Intel Corporation LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

revised [WTS] [JSN]
R1-1720218 Correction of NRS-CRS power offset configuration for NB-IoT draftCR

revised to R1-1721288

ZTE, SaneChips NB_IOT-Core Rel-13 R1-91

AI: 6.1.1

postponed [WTS] [JSN]
R1-1720378 Correction on scrambling sequence identity for 2+4 PRBs sets in MPDCCH draftCR

revised to R1-1721078

NEC LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1720379 Correction on resource elements reserved for CRS for PBCH with repetition draftCR NEC LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1720384 Clarification for DAI for eCA draftCR

revised to R1-1721066

Qualcomm Incorporated LTE_CA_enh_b5C-Core Rel-13 R1-91

AI: 6.1.1

revised [WTS] [JSN]
R1-1720385 Usage of PUCCH format 3 with more than 5 CC draftCR

revised to R1-1721088

Qualcomm Incorporated LTE_CA_enh_b5C-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1720386 Typo correction for table 16.5.1.2.1-1 draftCR Qualcomm Incorporated NB_IOT-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1720542 Preamble timing ambiguity during PDCCH order discussion Nokia, Nokia Shanghai Bell R1-91

AI: 6.1.1

noted [WTS] [JSN]
R1-1720543 UE uplink gap capability signaling description discussion Nokia, Nokia Shanghai Bell R1-91

AI: 6.1.1

noted [WTS] [JSN]
R1-1720545 Correction on the SI-RNTI for MPDCCH draftCR

revised to R1-1721080

Intel Corporation LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

not pursued [WTS] [JSN]
R1-1720834 Correction to timing advance for BL/CE UEs draftCR

revised to R1-1721190

Qualcomm Incorporated LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

revised [WTS] [JSN]
R1-1720835 Correction to determination of number of PUCCH repetitions for BL/CE UE draftCR Qualcomm Incorporated LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

postponed [WTS] [JSN]
R1-1721066 Clarification for DAI for eCA draftCR

revision of R1-1720384

revised to R1-1721086

Qualcomm Incorporated LTE_CA_enh_b5C-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721078 Correction on scrambling sequence identity for 2+4 PRBs sets in MPDCCH CR

revision of R1-1720378

NEC, Qualcomm, Panasonic 36.211 13.7.1 CR#401 catF LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721079 Correction on scrambling sequence identity for 2+4 PRBs sets in MPDCCH CR NEC, Qualcomm, Panasonic 36.211 14.4.0 CR#402 catA LTE_MTCe2_L1-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721080 Correction on the SI-RNTI for MPDCCH draftCR

revision of R1-1720545

Intel Corporation LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

withdrawn [WTS] [JSN]
R1-1721081 Correction on resource elements reserved for CRS for PBCH with repetition CR NEC 36.211 13.7.1 CR#403 catF LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721082 Correction on resource elements reserved for CRS for PBCH with repetition CR NEC 36.211 14.4.0 CR#404 catA LTE_MTCe2_L1-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721083 Typo correction for table 16.5.1.2.1-1 CR Qualcomm Incorporated 36.213 13.7.0 CR#996 catF NB_IOT-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721084 Typo correction for table 16.5.1.2.1-1 CR Qualcomm Incorporated 36.213 14.4.0 CR#997 catA NB_IOT-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721085 Void other Void R1-91

AI: 6.1.1

withdrawn [WTS] [JSN]
R1-1721086 Clarification for DAI for eCA CR

revision of R1-1721066

Qualcomm Incorporated, Huawei, HiSilicon 36.212 13.6.0 CR#269 catF LTE_CA_enh_b5C-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721087 Clarification for DAI for eCA CR Qualcomm Incorporated, Huawei, HiSilicon 36.212 14.4.0 CR#270 catA LTE_CA_enh_b5C-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721088 Usage of PUCCH format 3 for with more than 5 CC CR

revision of R1-1720385

Qualcomm Incorporated, Nokia, NSB 36.213 13.7.0 CR#998 catF LTE_CA_enh_b5C-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721089 Usage of PUCCH format 3 for with more than 5 CC CR Qualcomm Incorporated, Nokia, NSB 36.213 14.4.0 CR#999 catA LTE_CA_enh_b5C-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721118 Correction on MPDCCH assignment procedure for Type1-MPDCCH common search space draftCR

revision of R1-1720020

Intel Corporation LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

postponed [WTS] [JSN]
R1-1721161 UE uplink gap capability signaling description draftCR

revised to R1-1721262

Nokia, Nokia Shanghai Bell LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721162 UE uplink gap capability signaling description draftCR

revised to R1-1721263

Nokia, Nokia Shanghai Bell LTE_MTCe2_L1-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721166 Follow-up on 3GPP Response LS (R4-164972) LS in

LS is reply to RP-171558, R4-164972, R4-164704

LS To: RAN

Wi-Fi Alliance, CableLabs, Qualcomm, Ericsson LTE_LAA-Core Rel-13 R1-91

AI: 6.1.1

treated [WTS] [JSN]
R1-1721190 Correction to timing advance for BL/CE UEs draftCR

revision of R1-1720834

revised to R1-1721264

Qualcomm Incorporated LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

postponed [WTS] [JSN]
R1-1721262 UE uplink gap capability signaling description CR

revision of R1-1721161

Nokia, Nokia Shanghai Bell 36.211 13.7.1 CR#408 catF LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721263 UE uplink gap capability signaling description CR

revision of R1-1721162

Nokia, Nokia Shanghai Bell 36.211 14.4.0 CR#409 catA LTE_MTCe2_L1-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721264 Correction to timing advance for BL/CE Ues CR

revision of R1-1721190

revised to R1-1721265

Qualcomm Incorporated 36.213 13.7.0 CR#1006 catF LTE_MTCe2_L1-Core Rel-13 R1-91

AI: 6.1.1

postponed [WTS] [JSN]
R1-1721265 Correction to timing advance for BL/CE UEs CR

revision of R1-1721264

Qualcomm Incorporated 36.213 14.4.0 CR#1007 catA LTE_MTCe2_L1-Core Rel-14 R1-91

AI: 6.1.1

postponed [WTS] [JSN]
R1-1721288 Correction of NRS-CRS power offset configuration for NB-IoT draftCR

revision of R1-1720218

revised to R1-1721298

ZTE, SaneChips NB_IOTenh-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]
R1-1721298 Correction of NRS-CRS power offset configuration for NB-IoT CR

revision of R1-1721288

ZTE, Sanechips 36.213 14.4.0 CR#1008 catF NB_IOTenh-Core Rel-14 R1-91

AI: 6.1.1

agreed [WTS] [JSN]

36 documents (0.35840106010437 seconds)