Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2315055 On initial access beam correspondence other Qualcomm Incorporated R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315196 Discussion on Beam correspondence requirements discussion CMCC NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315439 Discussion on beam correspondence requirements for RRC_INACTIVE and initial access discussion Xiaomi NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315496 On beam correspondence in IA discussion Apple NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315498 On beam correspondence requriement for EN-DC/NE-DC draftCR Apple NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

postponed [WTS] [JSN]
R4-2315499 TP for TR 38.891: Specification impact pCR Apple 38.891 0.5.0 NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

postponed [WTS] [JSN]
R4-2315555 Discussion on requirements of initial access beam correspondence discussion Samsung NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315560 On beam correspondence requirement applicability for IA and RRC_INACTIVE mode discussion MediaTek (Shenzhen) Inc. NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315628 Discussion on beam correspondence requirement applicability other ZTE Corporation NR_RF_FR2_req_Ph3-Core R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315811 Discussion on RF requirement for beam correspondence in initial access other vivo NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315862 On beam correspondence requirements discussion Huawei, HiSilicon NR_RF_FR2_req_Ph3 Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2315966 R18 FR2 beam correspondence in initial access other OPPO NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2316623 Beam correspondence requirement applicability other Nokia, Nokia Shanghai Bell NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

noted [WTS] [JSN]
R4-2316626 Introducing beam correspondence requirement for initial access and RRC_INACTIVE draftCR Nokia, Nokia Shanghai Bell NR_RF_FR2_req_Ph3-Core Rel-18 R4-108-bis

AI: 5.6.3.1

postponed [WTS] [JSN]

14 documents (0.34730815887451 seconds)