Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-1609824 | NB-IoT aggregate power control Rel-13 |
CR revised to R4-1610541 |
Nokia, Alcatel-Lucent Shanghai Bell | 36.101 13.5.0 CR#4058 catF | NB_IOT-Core | Rel-13 |
R4-81 AI: 5.6.2 |
revised | [WTS] [JSN] |
R4-1609825 | NB-IoT aggregate power control Rel-14 | CR | Nokia, Alcatel-Lucent Shanghai Bell | 36.101 14.1.0 CR#4059 catA | NB_IOT-Core | Rel-14 |
R4-81 AI: 5.6.2 |
agreed | [WTS] [JSN] |
R4-1609829 | Discussion on RAN5 LS relating to NB-IoT | other | Nokia, Alcatel-Lucent Shanghai Bell | NB_IOT-Core |
R4-81 AI: 5.6.2 |
noted | [WTS] [JSN] | ||
R4-1609830 | Draft Reply LS on RF requirements for category NB1 UEs |
LS out revised to R4-1610542 |
Nokia, Alcatel-Lucent Shanghai Bell | NB_IOT-Core |
R4-81 AI: 5.6.2 |
revised | [WTS] [JSN] | ||
R4-1609831 | Correction to NB-IoT ON/OFF power measurement period Rel-13 |
CR revised to R4-1610535 |
Nokia, Alcatel-Lucent Shanghai Bell | 36.101 13.5.0 CR#4060 catF | NB_IOT-Core | Rel-13 |
R4-81 AI: 5.6.2 |
revised | [WTS] [JSN] |
R4-1609832 | Correction to NB-IoT ON/OFF power measurement period Rel-14 | CR | Nokia, Alcatel-Lucent Shanghai Bell | 36.101 14.1.0 CR#4061 catA | NB_IOT-Core | Rel-14 |
R4-81 AI: 5.6.2 |
agreed | [WTS] [JSN] |
R4-1609882 | A-MPR for category NB1 |
CR revised to R4-1610540 |
Ericsson | 36.101 14.1.0 CR#4068 catA | NB_IOT-Core | Rel-14 |
R4-81 AI: 5.6.2 |
revised | [WTS] [JSN] |
R4-1610535 | Correction to NB-IoT ON/OFF power measurement period Rel-13 |
CR revision of R4-1609831 revised to R4-1610595 |
Nokia, Alcatel-Lucent Shanghai Bell | 36.101 13.5.0 CR#40601 catF | NB_IOT-Core | Rel-13 |
R4-81 AI: 5.6.2 |
revised | [WTS] [JSN] |
R4-1610540 | A-MPR for NB-IoT |
CR revision of R4-1609882 |
Ericsson | 36.101 14.1.0 CR#40681 catA | NB_IOT-Core | Rel-14 |
R4-81 AI: 5.6.2 |
agreed | [WTS] [JSN] |
R4-1610541 | NB-IoT aggregate power control Rel-13 |
CR revision of R4-1609824 |
Nokia, Alcatel-Lucent Shanghai Bell | 36.101 13.5.0 CR#40581 catF | NB_IOT-Core | Rel-13 |
R4-81 AI: 5.6.2 |
agreed | [WTS] [JSN] |
R4-1610542 | Draft Reply LS on RF requirements for category NB1 UEs |
LS out revision of R4-1609830 revised to R4-1610596 |
Nokia, Alcatel-Lucent Shanghai Bell | NB_IOT-Core |
R4-81 AI: 5.6.2 |
revised | [WTS] [JSN] | ||
R4-1610595 | Correction to NB-IoT ON/OFF power measurement period Rel-13 |
CR revision of R4-1610535 |
Nokia, Alcatel-Lucent Shanghai Bell | 36.101 13.5.0 CR#40602 catF | NB_IOT-Core | Rel-13 |
R4-81 AI: 5.6.2 |
agreed | [WTS] [JSN] |
R4-1610596 | Draft Reply LS on RF requirements for category NB1 UEs |
LS out revision of R4-1610542 revised to R4-1610809 |
Nokia, Alcatel-Lucent Shanghai Bell | NB_IOT-Core |
R4-81 AI: 5.6.2 |
revised | [WTS] [JSN] | ||
R4-1610809 | Reply LS on RF requirements for category NB1 UEs |
LS out LS To: RAN5 revision of R4-1610596 |
RAN4 | NB_IOT-Core | Rel-13 |
R4-81 AI: 5.6.2 |
approved | [WTS] [JSN] |
14 documents (0.28886699676514 seconds)