Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-222208 | Alignment of of EN-DC Physical Layer Baseline Implementation Capabilities with 38.521-3 |
CR revised to R5-223797 |
CAICT | 38.508-2 17.4.0 CR#319 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-222695 | Addition of table for NR UL MIMO Capabilities | CR | Bureau Veritas, Huawei, HiSilicon | 38.508-2 17.4.0 CR#326 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-222877 | Limiting MBR relaxation reporting to Rel-15 only | CR | Huawei, HiSilicon, Bureau Veritas | 38.508-2 17.4.0 CR#329 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-223233 | Correction to A.4.3.2C for NR SUL physical layer baseline implementation capabilities |
CR revised to R5-223798 |
ZTE Corporation | 38.508-2 17.4.0 CR#344 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-223236 | Editorial correction to A.4.3.1 for RF baseline implementation capabilities |
CR revised to R5-223799 |
ZTE Corporation | 38.508-2 17.4.0 CR#345 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-223237 | Editorial correction to A.4.3.9 for Additional capabilities for UE declared capability |
CR revised to R5-223800 |
ZTE Corporation | 38.508-2 17.4.0 CR#346 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-223239 | Update to A.4.1 for addition of inter-band NE-DC within FR1 for NSA DC UE radio technologies |
CR revised to R5-223801 |
ZTE Corporation | 38.508-2 17.4.0 CR#347 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
revised | [WTS] [JSN] |
R5-223253 | Correction pc_dynamicPowerSharing to align with 38.306 | CR | Google Inc. | 38.508-2 17.4.0 CR#348 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-223797 | Alignment of of EN-DC Physical Layer Baseline Implementation Capabilities with 38.521-3 |
CR revision of R5-222208 |
CAICT | 38.508-2 17.4.0 CR#3191 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-223798 | Correction to A.4.3.2C for NR SUL physical layer baseline implementation capabilities |
CR revision of R5-223233 |
ZTE Corporation | 38.508-2 17.4.0 CR#3441 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-223799 | Editorial correction to A.4.3.1 for RF baseline implementation capabilities |
CR revision of R5-223236 |
ZTE Corporation | 38.508-2 17.4.0 CR#3451 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-223800 | Editorial correction to A.4.3.9 for Additional capabilities for UE declared capability |
CR revision of R5-223237 |
ZTE Corporation | 38.508-2 17.4.0 CR#3461 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
R5-223801 | Update to A.4.1 for addition of inter-band NE-DC within FR1 for NSA DC UE radio technologies |
CR revision of R5-223239 |
ZTE Corporation | 38.508-2 17.4.0 CR#3471 catF | TEI15_Test, 5GS_NR_LTE-UEConTest | Rel-17 |
R5-95-e AI: 5.4.2 |
agreed | [WTS] [JSN] |
13 documents (0.33289384841919 seconds)