Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-172356 | Update to Additional UE radio access capabilities for NS_04 | CR | Rohde & Schwarz | 36.521-2 14.2.0 CR#0555 catF | TEI12_Test | Rel-14 |
R5-75 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-172396 | Remove MPR/A-MPR test cases from Applicability spec |
CR revised to R5-173207 |
Bureau Veritas, CMCC | 36.521-2 14.2.0 CR#0556 catF | TEI14_Test | Rel-14 |
R5-75 AI: 5.4.1.3 |
revised | [WTS] [JSN] |
R5-172695 | Correction to RRM applicability condition C132 | CR | Keysight Technologies UK Ltd | 36.521-2 14.2.0 CR#0564 catF | TEI10_Test, LTE_CA_Rel12_3DL-UEConTest | Rel-14 |
R5-75 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-172701 | Delete applicability condition for TC 6.2.3A.2 | CR | Keysight Technologies UK Ltd | 36.521-2 14.2.0 CR#0567 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-14 |
R5-75 AI: 5.4.1.3 |
withdrawn | [WTS] [JSN] |
R5-172721 | Applicability correction for eDL-MIMO test cases in part 2 | CR | Ericsson | 36.521-2 14.2.0 CR#0569 catF | TEI10_Test | Rel-14 |
R5-75 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-172772 | Corrections to Applicability Conformance and Conditions for intra/inter-frequency SI acquisition for HO |
CR revised to R5-173367 |
Intel Corporation (UK) Ltd | 36.521-2 14.2.0 CR#0574 catF | TEI9_Test | Rel-14 |
R5-75 AI: 5.4.1.3 |
revised | [WTS] [JSN] |
R5-172821 | Update of CA Physical Layer Baseline Implementation Capabilities for new CA configuration in Annex A.4.6 |
CR revised to R5-173324 |
Keysight Technologies UK Ltd | 36.521-2 14.2.0 CR#0576 catF | TEI11_Test | Rel-14 |
R5-75 AI: 5.4.1.3 |
revised | [WTS] [JSN] |
R5-173207 | Remove MPR/A-MPR test cases from Applicability spec |
CR revision of R5-172396 |
Bureau Veritas, CMCC | 36.521-2 14.2.0 CR#05561 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-14 |
R5-75 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-173324 | Update of CA Physical Layer Baseline Implementation Capabilities for new CA configuration in Annex A.4.6 |
CR revision of R5-172821 |
Keysight Technologies UK Ltd | 36.521-2 14.2.0 CR#05761 catF | TEI11_Test | Rel-14 |
R5-75 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
R5-173367 | Corrections to Applicability Conformance and Conditions for intra/inter-frequency SI acquisition for HO |
CR revision of R5-172772 |
Intel Corporation (UK) Ltd | 36.521-2 14.2.0 CR#05741 catF | TEI9_Test | Rel-14 |
R5-75 AI: 5.4.1.3 |
agreed | [WTS] [JSN] |
10 documents (0.33840608596802 seconds)