Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-184242 | Correction to p-Max in configured UE transmitted output power tests for CA | CR | Anritsu | 36.521-1 15.2.0 CR#4359 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184244 | Editorial correction to inter-band UL CA tests | CR | Anritsu | 36.521-1 15.2.0 CR#4361 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184251 | Editorial correction to 6.6.3.3 | CR | Anritsu | 36.521-1 15.2.0 CR#4368 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
withdrawn | [WTS] [JSN] |
R5-184253 | Clarify the definition of active time slot in out of band and spurious emission tests | CR | Anritsu | 36.521-1 15.2.0 CR#4370 catF | TEI8_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184554 | Correction of test points and test requirements for TC 6.2.4A.2 |
CR revised to R5-185436 |
CETECOM GmbH | 36.521-1 15.2.0 CR#4417 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-184555 | Correction of test points and test requirements for TC 6.2.4A.2_1 |
CR revised to R5-185435 |
CETECOM GmbH | 36.521-1 15.2.0 CR#4418 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-184799 | Corrections to A-MPR values for NS_27 |
CR revised to R5-185448 |
Rohde & Schwarz | 36.521-1 15.2.0 CR#4461 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-184812 | Correction to Power Control for CA Test Procedure of TCs 6.3.5A.1.1, 6.3.5A.1.2 and 6.3.5A.1.4 | CR | Intel Corporation (UK) Ltd | 36.521-1 15.2.0 CR#4463 catF | TEI10_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184818 | Correction to Message Content for TC 6.2.4EA A-MPR for UE Category M1 | CR | Intel Corporation (UK) Ltd | 36.521-1 15.2.0 CR#4464 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-184941 | Editorial correction of NS requirements | CR | ROHDE & SCHWARZ | 36.521-1 15.2.0 CR#4491 catF | TEI12_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-185435 | Correction of test points and test requirements for TC 6.2.4A.2_1 |
CR revision of R5-184555 |
CETECOM GmbH | 36.521-1 15.2.0 CR#44181 catF | TEI13_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-185436 | Correction of test points and test requirements for TC 6.2.4A.2 |
CR revision of R5-184554 |
CETECOM GmbH | 36.521-1 15.2.0 CR#44171 catF | TEI11_Test, LTE_CA_Rel12_2UL-UEConTest | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-185448 | Corrections to A-MPR values for NS_27 |
CR revision of R5-184799 |
Rohde & Schwarz | 36.521-1 15.2.0 CR#44611 catF | TEI14_Test | Rel-15 |
R5-80 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
13 documents (0.35488486289978 seconds)