Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-162172 | Revise Power Control Relative power tolerance for CA (intra-band contiguous DL CA and UL CA) test case 6.3.5A.2.1 |
CR revised to R5-163130 |
ANRITSU LTD | 36.521-1 13.1.0 CR#2534 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162222 | Introduction of MPR for inter-band DL CA and UL CA for UL 64QAM |
CR revised to R5-162802 |
CMCC | 36.521-1 13.1.0 CR#2546 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162223 | Introduction of MPR for intra-band non-contiguous CA and UL CA for UL 64QAM |
CR revised to R5-162803 |
CMCC | 36.521-1 13.1.0 CR#2547 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162224 | Introduction of AMPR for inter-band DL CA and UL CA for UL 64QAM |
CR revised to R5-162977 |
CMCC | 36.521-1 13.1.0 CR#2548 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162225 | Introduction of EVM for inter-band UL CA for UL 64QAM |
CR revised to R5-162979 |
CMCC | 36.521-1 13.1.0 CR#2549 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162226 | Introduction of ASEM for inter-band DL CA and UL CA for UL 64QAM |
CR revised to R5-162980 |
CMCC | 36.521-1 13.1.0 CR#2550 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162227 | Introduction of ACLR for inter-band DL CA and UL CA for UL 64QAM |
CR revised to R5-162981 |
CMCC | 36.521-1 13.1.0 CR#2551 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162228 | Introduction of ASE for inter-band DL CA and UL CA for UL 64QAM |
CR revised to R5-162982 |
CMCC | 36.521-1 13.1.0 CR#2552 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162230 | Rel-11 Test point reduction for intra-band non-contiguous UL CA MPR and ACLR tests |
CR revised to R5-162804 |
CMCC | 36.521-1 13.1.0 CR#2553 catF | TEI11_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162231 | Rel-11 Test point reduction for inter-band UL CA AMPR, ASEM and ASE tests |
CR revised to R5-162805 |
CMCC | 36.521-1 13.1.0 CR#2554 catF | TEI11_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162233 | R8 - Modification of test bandwidths in AMPR, ASEM and ASE test |
CR revised to R5-162806 |
CMCC | 36.521-1 13.1.0 CR#2555 catF | TEI8_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162234 | R13 - Modification of test bandwidths in AMPR and ASE for UL 64QAM test |
CR revised to R5-162807 |
CMCC | 36.521-1 13.1.0 CR#2556 catF | TEI13_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162235 | Introduction of ACLR for intra-band non-contiguous UL CA for UL 64QAM | CR | CMCC | 36.521-1 13.1.0 CR#2557 catF | LTE_UL64QAM-UEConTest, TEI13_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162351 | UL CA: Corrections to TC 6.5.2A.1.1 |
CR revised to R5-162808 |
Rohde & Schwarz | 36.521-1 13.1.0 CR#2616 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162354 | Correction to UL64QAM A-MPR and ASE tests | CR | Rohde & Schwarz | 36.521-1 13.1.0 CR#2618 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162356 | UL CA: Addition of missing test points for 20 + 5 MHz bandwidth | CR | Rohde & Schwarz | 36.521-1 13.1.0 CR#2620 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
withdrawn | [WTS] [JSN] |
R5-162368 | Addition CA combinations in intra-band contiguous DL CA and UL CA transmitter test cases |
CR revised to R5-162809 |
Keysight Technologies UK Ltd | 36.521-1 13.1.0 CR#2624 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162505 | Updates of test point for A-Spur for UL 64QAM |
CR revised to R5-162983 |
NTT DOCOMO, INC. | 36.521-1 13.1.0 CR#2657 catF | TEI13_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162507 | Addition of a new TC for Minimom Output Power for CA (inter-band DL CA and UL CA) |
CR revised to R5-162995 |
Huawei | 36.521-1 13.1.0 CR#2658 catF | LTE_CA_Rel12_3DL-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162508 | Addition of a new TC for Minimom Output Power for CA (intra-band non-contiguous DL CA and UL CA) |
CR revised to R5-162996 |
Huawei | 36.521-1 13.1.0 CR#2659 catF | LTE_CA_Rel12_3DL-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162530 | Change of test points and requirements for A-MPR for NS_05 |
CR revised to R5-162984 |
KDDI Corporation | 36.521-1 13.1.0 CR#2663 catF | TEI12_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162575 | Discussion on applicability of RAN4 requirements when PUSCH frequency hopping is used |
other revised to R5-163131 |
Ericsson | TEI8_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] | |
R5-162576 | Introduction of Spectrum emissions test cases with PUSCH frequency hopping | CR | Ericsson | 36.521-1 13.1.0 CR#2683 catF | TEI8_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
withdrawn | [WTS] [JSN] |
R5-162590 | Correction to 6.2.4 A-MPR test for Band 12 |
CR revised to R5-162810 |
Anritsu | 36.521-1 13.1.0 CR#2685 catF | TEI8_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162802 | Introduction of MPR for inter-band DL CA and UL CA for UL 64QAM |
CR revision of R5-162222 |
CMCC | 36.521-1 13.1.0 CR#25461 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162803 | Introduction of MPR for intra-band non-contiguous CA and UL CA for UL 64QAM |
CR revision of R5-162223 |
CMCC | 36.521-1 13.1.0 CR#25471 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162804 | Rel-11 Test point reduction for intra-band non-contiguous UL CA MPR and ACLR tests |
CR revision of R5-162230 |
CMCC | 36.521-1 13.1.0 CR#25531 catF | TEI11_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162805 | Rel-11 Test point reduction for inter-band UL CA AMPR, ASEM and ASE tests |
CR revision of R5-162231 |
CMCC | 36.521-1 13.1.0 CR#25541 catF | TEI11_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162806 | R8 - Modification of test bandwidths in AMPR, ASEM and ASE test |
CR revision of R5-162233 |
CMCC | 36.521-1 13.1.0 CR#25551 catF | TEI8_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162807 | R13 - Modification of test bandwidths in AMPR and ASE for UL 64QAM test |
CR revision of R5-162234 |
CMCC | 36.521-1 13.1.0 CR#25561 catF | TEI13_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162808 | UL CA: Corrections to TC 6.5.2A.1.1 |
CR revision of R5-162351 |
Rohde & Schwarz | 36.521-1 13.1.0 CR#26161 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162809 | Addition CA combinations in intra-band contiguous DL CA and UL CA transmitter test cases |
CR revision of R5-162368 revised to R5-162967 |
Keysight Technologies UK Ltd | 36.521-1 13.1.0 CR#26241 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162810 | Correction to 6.2.4 A-MPR test for Band 12 |
CR revision of R5-162590 |
Anritsu | 36.521-1 13.1.0 CR#26851 catF | TEI8_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162882 | Correction to the UL CA Frequency Error Testcase |
CR revised to R5-163196 |
Intel | 36.521-1 13.1.0 CR#2726 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-162967 | Addition CA combinations in intra-band contiguous DL CA and UL CA transmitter test cases |
CR revision of R5-162809 |
Keysight Technologies UK Ltd | 36.521-1 13.1.0 CR#26242 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162977 | Introduction of AMPR for inter-band DL CA and UL CA for UL 64QAM |
CR revision of R5-162224 |
CMCC | 36.521-1 13.1.0 CR#25481 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162979 | Introduction of EVM for inter-band UL CA for UL 64QAM |
CR revision of R5-162225 |
CMCC | 36.521-1 13.1.0 CR#25491 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162980 | Introduction of ASEM for inter-band DL CA and UL CA for UL 64QAM |
CR revision of R5-162226 |
CMCC | 36.521-1 13.1.0 CR#25501 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162981 | Introduction of ACLR for inter-band DL CA and UL CA for UL 64QAM |
CR revision of R5-162227 |
CMCC | 36.521-1 13.1.0 CR#25511 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162982 | Introduction of ASE for inter-band DL CA and UL CA for UL 64QAM |
CR revision of R5-162228 |
CMCC | 36.521-1 13.1.0 CR#25521 catF | TEI13_Test, LTE_UL64QAM-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162983 | Updates of test point for A-Spur for UL 64QAM |
CR revision of R5-162505 |
NTT DOCOMO, INC. | 36.521-1 13.1.0 CR#26571 catF | TEI13_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-162984 | Change of test points and requirements for A-MPR for NS_05 |
CR revision of R5-162530 revised to R5-163195 |
KDDI Corporation | 36.521-1 13.1.0 CR#26631 catF | TEI12_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
revised | [WTS] [JSN] |
R5-163130 | Revise Power Control Relative power tolerance for CA (intra-band contiguous DL CA and UL CA) test case 6.3.5A.2.1 |
CR revision of R5-162172 |
ANRITSU LTD | 36.521-1 13.1.0 CR#25341 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-163131 | Discussion on applicability of RAN4 requirements when PUSCH frequency hopping is used |
other revision of R5-162575 |
Ericsson | TEI8_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] | |
R5-163194 | Band 65 introduction to Chapter 6.2 in 36.521-1 | CR | Dish Network | 36.521-1 13.1.0 CR#27022 catF | LTE_1980_2170_REG1_REG3-UEConTest | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-163195 | Change of test points and requirements for A-MPR for NS_05 |
CR revision of R5-162984 |
KDDI Corporation | 36.521-1 13.1.0 CR#26632 catF | TEI12_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
R5-163196 | Correction to the UL CA Frequency Error Testcase |
CR revision of R5-162882 |
Intel | 36.521-1 13.1.0 CR#27261 catF | TEI10_Test | Rel-13 |
R5-71 AI: 5.4.1.2.1 |
agreed | [WTS] [JSN] |
47 documents (0.34254813194275 seconds)