Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R2-2008715 LS reply on NR SRS carrier switching (R1-2007395; contact: Qualcomm) LS in

LS is reply to R2-2006362

source LS: R1-2007395

LS To: RAN2

RAN1 NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

noted [WTS] [JSN]
R2-2009183 Discussion on SRS carrier switching based on RAN1 reply LS (R1-2007395) discussion Qualcomm Incorporated, ZTE Corporation, Sanechips, Ericsson, MediaTek Inc. NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

noted [WTS] [JSN]
R2-2009184 Correction for configuration of SRS Carrier Switching CR

revised to R2-2011212

Qualcomm Incorporated, ZTE Corporation, Sanechips, Ericsson, MediaTek Inc. 38.331 15.11.0 CR#2039 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2009185 Correction for configuration of SRS Carrier Switching CR

revised to R2-2011213

Qualcomm Incorporated, ZTE Corporation, Sanechips, Ericsson, MediaTek Inc. 38.331 16.2.0 CR#2040 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2009233 Clarify UE behaviour on Need S Need R fields discussion ZTE Corporation, Sanechips NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

noted [WTS] [JSN]
R2-2009234 CR to clarify UE behaviour on Need S Need R fields CR ZTE Corporation, Sanechips 38.331 15.11.0 CR#2044 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

postponed [WTS] [JSN]
R2-2009235 CR to clarify UE behaviour on Need S Need R fields CR ZTE Corporation, Sanechips 38.331 16.2.0 CR#2045 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

postponed [WTS] [JSN]
R2-2009236 CR to clarify smtc field in case of SCell addition CR ZTE Corporation, Sanechips 38.331 15.11.0 CR#2046 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2009237 CR to clarify smtc field in case of SCell addition CR ZTE Corporation, Sanechips 38.331 16.2.0 CR#2047 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2009355 Corrections on the configurations of HARQ-ACK spatial bundling and CBG in 38.331 CR

revised to R2-2011192

CATT 38.331 15.11.0 CR#2058 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2009356 Corrections on the configurations of HARQ-ACK spatial bundling and CBG in 38.331 CR

revised to R2-2011193

CATT 38.331 16.2.0 CR#2059 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2009478 Clarification on AS configuration during HO CR Apple 38.331 16.2.0 CR#2082 catF NR_newRAT-Core, TEI16 Rel-16 R2-112-e

AI: 5.4.1.1

postponed [WTS] [JSN]
R2-2009479 Clarification on the SCell RACH configuration CR Apple 38.331 16.2.0 CR#2183 catF NR_newRAT-Core, TEI16 Rel-16 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2009580 Correction on rach-ConfigDedicated CR ZTE Corporation, Sanechips 38.331 15.11.0 CR#2092 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

postponed [WTS] [JSN]
R2-2009581 Correction on rach-ConfigDedicated(R16) CR ZTE Corporation, Sanechips 38.331 16.2.0 CR#2093 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

postponed [WTS] [JSN]
R2-2009582 Correction on essential system information CR ZTE Corporation, Sanechips 38.331 15.11.0 CR#2094 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

merged [WTS] [JSN]
R2-2009583 Correction on essential system information(R16) CR ZTE Corporation, Sanechips 38.331 16.2.0 CR#2095 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

merged [WTS] [JSN]
R2-2009697 Clarification on RRC Reestablishment procedure discussion Ericsson NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

noted [WTS] [JSN]
R2-2009698 Correction on terminology for when the UE is configured with SUL CR Ericsson 38.331 15.11.0 CR#2105 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

merged [WTS] [JSN]
R2-2009699 Correction on terminology for when the UE is configured with SUL CR Ericsson 38.331 16.2.0 CR#2106 catF NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

merged [WTS] [JSN]
R2-2009844 FH configuration for 1-symbol PUCCH CR Ericsson 38.331 15.11.0 CR#2137 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2009845 FH configuration for 1-symbol PUCCH CR Ericsson 38.331 16.2.0 CR#2138 catA NR_newRAT-Core, TEI16 Rel-16 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2010492 Clarification on the terminology ‘serving cell is configured with a supplementary uplink’ discussion Fujitsu NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2010530 clarification on p-Max in FR2 rel-15 CR

revised to R2-2100765

NTT DOCOMO, INC. 38.331 15.11.0 CR#2236 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

postponed [WTS] [JSN]
R2-2010531 Clarification on p-Max in FR2 CR

revised to R2-2100771

NTT DOCOMO, INC. 38.331 16.2.0 CR#2237 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

postponed [WTS] [JSN]
R2-2010557 Allowing Deactivation of SCells for Overheating Mitigation CR Qualcomm Incorporated 38.331 15.11.0 CR#2242 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2010558 Allowing Deactivation of SCells for Overheating Mitigation CR Qualcomm Incorporated 38.331 16.2.0 CR#2243 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2010563 SRS Resource Set upon PUCCH Release CR Qualcomm Incorporated 38.331 16.2.0 CR#2245 catF NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2010584 Clarification on the terminology ‘serving cell is configured with a supplementary uplink’ CR

revision of R2-2007020

Fujitsu 38.331 16.2.0 CR#17721 catF NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

not pursued [WTS] [JSN]
R2-2010665 Corrections on configuration of first active BWPs CR

revised to R2-2011131

Huawei, HiSilicon 38.331 15.11.0 CR#2269 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2010666 Corrections on configuration of first active BWPs CR

revised to R2-2011132

Huawei, HiSilicon 38.331 16.2.0 CR#2270 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2011042 Email discussion summary of [005][NR15] RRC Conn Control I discussion Qualcomm Incorporated NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

noted [WTS] [JSN]
R2-2011043 Email discussion summary of [005][NR15] RRC Conn Control II discussion

revised to R2-2011184

Email discussion summary of [005][NR15] RRC Conn Control I NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2011131 Corrections on configuration of first active BWPs CR

revision of R2-2010665

revised to R2-2011252

Huawei, HiSilicon 38.331 15.11.0 CR#22691 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2011132 Corrections on configuration of first active BWPs CR

revision of R2-2010666

revised to R2-2011253

Huawei, HiSilicon 38.331 16.2.0 CR#22701 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2011175 Email discussion summary of [006][NR15] RRC Conn Control II discussion

revised to R2-2011187

ZTE Corporation NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

revised [WTS] [JSN]
R2-2011184 Email discussion summary of [005][NR15] RRC Conn Control II discussion

revision of R2-2011043

Email discussion summary of [005][NR15] RRC Conn Control I NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

noted [WTS] [JSN]
R2-2011187 Email discussion summary of [006][NR15] RRC Conn Control II discussion

revision of R2-2011175

ZTE Corporation NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

available [WTS] [JSN]
R2-2011192 Corrections on the configurations of HARQ-ACK spatial bundling and CBG in 38.331 CR

revision of R2-2009355

CATT 38.331 15.11.0 CR#20581 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

agreed [WTS] [JSN]
R2-2011193 Corrections on the configurations of HARQ-ACK spatial bundling and CBG in 38.331 CR

revision of R2-2009356

CATT 38.331 16.2.0 CR#20591 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

agreed [WTS] [JSN]
R2-2011212 Correction for configuration of SRS Carrier Switching CR

revision of R2-2009184

Qualcomm Incorporated, ZTE Corporation, Sanechips, Ericsson, MediaTek Inc. 38.331 15.11.0 CR#20391 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

agreed [WTS] [JSN]
R2-2011213 Correction for configuration of SRS Carrier Switching CR

revision of R2-2009185

Qualcomm Incorporated, ZTE Corporation, Sanechips, Ericsson, MediaTek Inc. 38.331 16.2.0 CR#20401 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

agreed [WTS] [JSN]
R2-2011252 Corrections on configuration of first active BWPs CR

revision of R2-2011131

Huawei, HiSilicon 38.331 15.11.0 CR#22692 catF NR_newRAT-Core Rel-15 R2-112-e

AI: 5.4.1.1

available [WTS] [JSN]
R2-2011253 Corrections on configuration of first active BWPs CR

revision of R2-2011132

Huawei, HiSilicon 38.331 16.2.0 CR#22702 catA NR_newRAT-Core Rel-16 R2-112-e

AI: 5.4.1.1

available [WTS] [JSN]

44 documents (0.34276986122131 seconds)