Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-186565 Updates of MU in TS 38.521-2 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#24 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-186566 Updates of TT in TS 38.521-2 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#25 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-186740 General sections updated to 38.521-2 CR CAICT, Huawei 38.521-2 15.0.0 CR#29 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187019 TDD configuration for UE Tx test in FR2 CR Ericsson 38.521-2 15.0.0 CR#31 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187039 Update MU and TT in Annex F of 38.521-2 CR Huawei, HiSilicon 38.521-2 15.0.0 CR#33 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

withdrawn [WTS] [JSN]
R5-187151 Updated to Annexes for FR2 tests CR Bureau Veritas 38.521-2 15.0.0 CR#34 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187152 General Information updated for TS38.521-2 CR Bureau Veritas 38.521-2 15.0.0 CR#35 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187286 FR2 downlink signal level(38.521-2) CR Anritsu 38.521-2 15.0.0 CR#36 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187318 Addition of notes to clarify test point selection into general section of TS 38.521-2 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#38 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187323 Core alignment CR to capture TS 38.101-2 updates during RAN4#89 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#39 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187522 On measurement grids CR

revised to R5-187921

Keysight Technologies UK Ltd 38.521-2 15.0.0 CR#41 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187571 Update to Annex K CR Qualcomm Austria RFFE GmbH 38.521-2 15.0.0 CR#43 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187581 Update of Global In-channel Tx Test Annex in 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#44 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-187605 Update of FR2 MU values CR Anritsu 38.521-2 15.0.0 CR#49 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

withdrawn [WTS] [JSN]
R5-187842 General sections updated to 38.521-2 CR CAICT, Huawei 38.521-2 15.0.0 CR#291 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187843 Update of Global In-channel Tx Test Annex in 38.521-2 CR ROHDE & SCHWARZ 38.521-2 15.0.0 CR#441 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187912 Addition of notes to clarify test point selection into general section of TS 38.521-2 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#381 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-187921 On measurement grids CR

revision of R5-187522

Keysight Technologies UK Ltd 38.521-2 15.0.0 CR#411 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

revised [WTS] [JSN]
R5-188038 FR2 downlink signal level(38.521-2) CR Anritsu 38.521-2 15.0.0 CR#361 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188214 Updates of TT in TS 38.521-2 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#251 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188215 TDD configuration for UE Tx test in FR2 CR Ericsson 38.521-2 15.0.0 CR#311 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188216 Core alignment CR to capture TS 38.101-2 updates during RAN4#89 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#391 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188217 On measurement grids CR Keysight Technologies UK Ltd 38.521-2 15.0.0 CR#412 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188218 Update to Annex K CR Qualcomm Austria RFFE GmbH 38.521-2 15.0.0 CR#431 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]
R5-188239 Updates of MU in TS 38.521-2 Annex F during RAN5#81 CR NTT DOCOMO, INC. 38.521-2 15.0.0 CR#241 catF 5GS_NR_LTE-UEConTest Rel-15 R5-81

AI: 5.3.9.5.3

agreed [WTS] [JSN]

25 documents (0.33893299102783 seconds)