Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-197735 | Multi-band relaxation impact on conformance test |
discussion revised to R5-199572 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | |
R5-197736 | On ACLR test metric | discussion | NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-197737 | On testability issue for prioritized test cases |
discussion revised to R5-199561 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | |
R5-198024 | On RRM FR2 Measurement Uncertainties |
discussion revised to R5-199573 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | |
R5-198026 | On RRM FR2 Measurement Uncertainties for Measurement Accuracy tests |
discussion revised to R5-199574 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | |
R5-198174 | Discussion on revisiting agreed FR2 TT values | discussion | Qualcomm Austria RFFE GmbH | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198175 | Discussion on AP#84.22 Tx Spectrum Shape for FR2 OBW MU | discussion | Qualcomm Austria RFFE GmbH | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198203 | MU Assumptions for PC1 Fixed Wireless Access (FWA) UE | discussion | Qualcomm UK Ltd | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198221 | On IFF method for multi-AoA test setup for RRM | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-198222 | On beam peak search results re-use for RRM | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-198259 | On Declaring IFF Reference Methodology for Spurious Emissions | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198261 | On 15cm QZ | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198262 | On Larger Quiet Zone Sizes | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198264 | End-to-End System Simulations for Min. Isolation Requirements |
discussion revised to R5-199575 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-198265 | Proposals for Beam Peak and TRP Measurement Grids for PC1 UEs | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198266 | Proposals for Spherical Coverage Measurement Grids for PC1 UEs |
discussion revised to R5-199530 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-198301 | FR1 TT Way Forward update |
discussion revised to R5-199340 |
Telecom Italia | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | |
R5-198302 | FR2 NR TT Way Forward update |
discussion revised to R5-199562 |
Telecom Italia | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | |
R5-198303 | NSA TT Way Forward update |
discussion revised to R5-199341 |
Telecom Italia | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | |
R5-198363 | Test Tolerance analysis features for FR2 RRM Test cases | discussion | ANRITSU LTD | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198366 | Benefit of 2 AoA RRM test setup with IFF TRxPs for FR2 | discussion | Anritsu | 5GS_NR_LTE-UEConTest | Rel-15 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-198380 | Considerations for beam correspondence side conditions | discussion | Samsung R&D Institute UK | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198387 | Further discussion on FR2 absolute power control method |
discussion revised to R5-199354 |
Samsung R&D Institute UK | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-198390 | Further discussion on FR2 SRS time mask for UL-MIMO TTs | discussion | Samsung R&D Institute UK | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-198444 | Proposal of MU elements for FR2 spurious emission |
discussion revised to R5-199585 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-198445 | Quality of Quiet Zone for spurious emission | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198446 | On the treatment of influence of noise in MU and TT |
discussion revised to R5-199576 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-198447 | On FR2 spherical coverage MU | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198448 | Proposal of MU elements for Transmit OFF Power | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198449 | On the interferer for FR2 blocking tests | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198450 | Proposal for influence of noise | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198451 | On the FR2 ACLR test metric | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198452 | On the FR2 OBW MU | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198453 | On FR2 demod MU | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198454 | On FR2 RRM MU | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198459 | On the coarse TRP measurement procedure in spurious emission test | discussion | Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198561 | Discussion on Out-of-band emissions for Intra-band non-contiguous EN-DC | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198562 | On FR2 ACLR noise impact | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198563 | On FR2 spherical coverage noise impact | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198564 | On FR2 spurious emissions noise impact | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198565 | On Spurious emissions MU | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198566 | On transmit OFF power MU | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198567 | RRM FR2 MU for Timing | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
withdrawn | [WTS] [JSN] | ||
R5-198633 | Discussion on ACLR FR2 test case | discussion | Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198661 | Views on Extreme Temperature Conditions |
discussion revised to R5-199581 |
Apple Europe Limited | Rel-15 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-198666 | Discussion on EN-DC max output power and configured power testing | discussion | Ericsson | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198667 | Discussion on the practical outcome of Multiband relaxation in certification |
discussion revised to R5-199577 |
Ericsson | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-198687 | Views on testability of UEs using Tx diversity in FR1 | discussion | Rohde & Schwarz |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |||
R5-198731 | Discussion on size of Quiet Zone for QoQZ evaluation | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198733 | On the SNR for FR2 TRx test cases | discussion | ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-198742 | Discussion on applicability and test coverage rule |
discussion revised to R5-199492 |
Qualcomm communications-France | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-198774 | EN-DC MSD Target Transmission Power Assumptions and Test Procedure | discussion | Skyworks Solutions Inc. | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-198778 | Discussion Paper proposing change of Phy Cell ID for every iteration |
discussion revised to R5-199536 |
Qualcomm UK Ltd. | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | |
R5-199340 | FR1 TT Way Forward update |
discussion revision of R5-198301 |
Telecom Italia | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-199341 | NSA TT Way Forward update |
discussion revision of R5-198303 |
Telecom Italia | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-199353 | WF on TT FR2 | discussion | Orange, Telecom Italia, CMCC, Verizon, T-Mobile US, Vodafone, AT&T, China Unicom, China telecom, NTT DOCOMO, DISH Network, KDDI |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |||
R5-199354 | Further discussion on FR2 absolute power control method |
discussion revision of R5-198387 |
Samsung R&D Institute UK | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-199472 | FR2 Measurement Uncertainty (MU) / Test Tolerances (TT) Target Completion Update |
discussion revised to R5-199584 |
PCTEST Engineering Lab | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
revised | [WTS] [JSN] | ||
R5-199492 | Discussion on applicability and test coverage rule |
discussion revision of R5-198742 |
Qualcomm communications-France | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-199497 | Proposal of noise impact for FR2 Transmitter Test Case | discussion | Anritsu, Keysight, ROHDE & SCHWARZ |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |||
R5-199500 | Way Forward on RRM FR2 MU | discussion | Rohde & Schwarz, Anritsu, Keysight, Qualcomm, Samsung |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |||
R5-199530 | Proposals for Spherical Coverage Measurement Grids for PC1 UEs |
discussion revision of R5-198266 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-199536 | Discussion Paper proposing change of Phy Cell ID for every iteration |
discussion revision of R5-198778 |
Qualcomm UK Ltd. | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-199561 | On testability issue for prioritized test cases |
discussion revision of R5-197737 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-199562 | FR2 NR TT Way Forward update |
discussion revision of R5-198302 |
Telecom Italia | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-199572 | Multi-band relaxation impact on conformance test |
discussion revision of R5-197735 |
NTT DOCOMO, INC. | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-199573 | On RRM FR2 Measurement Uncertainties |
discussion revision of R5-198024 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-199574 | On RRM FR2 Measurement Uncertainties for Measurement Accuracy tests |
discussion revision of R5-198026 |
ROHDE & SCHWARZ | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | |
R5-199575 | End-to-End System Simulations for Min. Isolation Requirements |
discussion revision of R5-198264 |
Keysight Technologies UK Ltd | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-199576 | On the treatment of influence of noise in MU and TT |
discussion revision of R5-198446 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-199577 | Discussion on the practical outcome of Multiband relaxation in certification |
discussion revision of R5-198667 |
Ericsson | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-199581 | Views on Extreme Temperature Conditions |
discussion revision of R5-198661 |
Apple Europe Limited | Rel-15 |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-199584 | FR2 Measurement Uncertainty (MU) / Test Tolerances (TT) Target Completion Update |
discussion revision of R5-199472 |
PCTEST Engineering Lab | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] | ||
R5-199585 | Proposal of MU elements for FR2 spurious emission |
discussion revision of R5-198444 |
Anritsu | 5GS_NR_LTE-UEConTest |
R5-85 AI: 5.3.5.17 |
noted | [WTS] [JSN] |
74 documents (0.345046043396 seconds)