Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R5-220205 | Addition of NR CA Physical Layer Baseline Implementation Capabilities for R16 CA_n3A-n41A | CR | CMCC | 38.508-2 17.3.0 CR#290 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-94-e AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
| R5-220312 | Introduction of Rel-16 inter-band EN-DC two band configurations within FR1 for physical layer baseline implementation capabilities | CR | Nokia, Nokia Shanghai Bell | 38.508-2 17.3.0 CR#292 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-94-e AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
| R5-220533 | Editorial correction to UE declaration of Bandwidth Class and BCS information | CR | Bureau Veritas | 38.508-2 17.3.0 CR#293 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-94-e AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
| R5-220973 | Addition of physical baseline implementation capabilities for Rel-16 EN-DC configurations | CR | Huawei, Hisilicon, Orange | 38.508-2 17.3.0 CR#303 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-94-e AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
| R5-221056 | Removal of supported BCS for inter-band EN-DC configurations including FR1 and FR2 | CR | ZTE Corporation | 38.508-2 17.3.0 CR#310 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-94-e AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
| R5-221057 | Removal of supported BCS for inter-band EN-DC configurations including FR2 | CR | ZTE Corporation | 38.508-2 17.3.0 CR#311 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-94-e AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
| R5-221058 | Removal of supported BCS for inter-band EN-DC configurations within FR1 | CR | ZTE Corporation | 38.508-2 17.3.0 CR#312 catF | NR_CADC_NR_LTE_DC_R16-UEConTest | Rel-17 |
R5-94-e AI: 5.3.4.2 |
agreed | [WTS] [JSN] |
7 documents (0.40763998031616 seconds)