Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R5-210521 | Correction to test applicability for LTE-NR coexistence performance test cases | CR | Anritsu | 38.521-4 16.6.0 CR#276 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
agreed | [WTS] [JSN] |
R5-210524 | Correction to test time for Subband CQI test case | CR | Anritsu | 38.521-4 16.6.0 CR#279 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
withdrawn | [WTS] [JSN] |
R5-210525 | Correction to DCI bit size for PDSCH Type B performance and LTE coexistence tests |
CR revised to R5-211716 |
Anritsu | 38.521-4 16.6.0 CR#280 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
revised | [WTS] [JSN] |
R5-210526 | Correction to LB setup DRB in CLOSE UE TEST LOOP message |
CR revised to R5-211717 |
Anritsu | 38.521-4 16.6.0 CR#281 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
revised | [WTS] [JSN] |
R5-210773 | Correction in 6.4.2.1_1 test requirements | CR | Keysight Technologies UK Ltd | 38.521-4 16.6.0 CR#283 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
agreed | [WTS] [JSN] |
R5-210869 | Correction to Test Purpose of PDCCH test cases | CR | Huawei, HiSilicon | 38.521-4 16.6.0 CR#285 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
agreed | [WTS] [JSN] |
R5-210870 | Correction to NR test case 6.2.2.1.2.1 |
CR revised to R5-211718 |
Huawei, HiSilicon | 38.521-4 16.6.0 CR#286 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
revised | [WTS] [JSN] |
R5-210993 | Editorial, cleanup of some references in 38.521-4 | CR | Ericsson | 38.521-4 16.6.0 CR#288 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
agreed | [WTS] [JSN] |
R5-211716 | Correction to DCI bit size for PDSCH Type B performance and LTE coexistence tests |
CR revision of R5-210525 |
Anritsu | 38.521-4 16.6.0 CR#2801 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
agreed | [WTS] [JSN] |
R5-211717 | Correction to LB setup DRB in CLOSE UE TEST LOOP message |
CR revision of R5-210526 |
Anritsu | 38.521-4 16.6.0 CR#2811 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
agreed | [WTS] [JSN] |
R5-211718 | Correction to NR test case 6.2.2.1.2.1 |
CR revision of R5-210870 |
Huawei, HiSilicon | 38.521-4 16.6.0 CR#2861 catF | 5GS_NR_LTE-UEConTest | Rel-16 |
R5-90-e AI: 5.3.2.7.1 |
agreed | [WTS] [JSN] |
11 documents (0.34372210502625 seconds)