Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-210293 New FR2 Common Uplink Configurations definition in section 6 CR Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#452 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

withdrawn [WTS] [JSN]
R5-210297 Editorial corrections in Occupied bandwidth test procedure CR

revised to R5-211683

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#456 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210489 Correction of test purpose for 6.3.2 Transmit OFF power CR CAICT 38.521-2 16.6.0 CR#457 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-210490 Addition of new test case 6.3D.2 Transmit OFF power for UL MIMO CR CAICT 38.521-2 16.6.0 CR#458 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-210543 FR2 UL CA Frequency error test cases update CR

revised to R5-211684

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#465 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210547 FR2 MPR, ACLR and SEM test cases update as per TP analysis update CR

revised to R5-211863

Keysight Technologies UK Ltd, Ericsson, CAICT 38.521-2 16.6.0 CR#466 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210724 Omitting of FR2 Rx cases with UL-MIMO on TDD bands CR Huawei, HiSilicon 38.521-2 16.6.0 CR#468 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-210727 Addition of Inner_partial allocation in general section and a few test cases CR

revised to R5-211685

Huawei, HiSilicon, Keysight 38.521-2 16.6.0 CR#469 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210728 Correction of parameter configuration for open loop power control CR

revised to R5-211686

Huawei, HiSilicon 38.521-2 16.6.0 CR#470 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210729 Removing test condition of extreme voltage CR Huawei, HiSilicon 38.521-2 16.6.0 CR#471 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-210730 Cleaning up of FR2 test specification CR

revised to R5-211864

Huawei, HiSilicon 38.521-2 16.6.0 CR#472 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-210893 Update of TX Test Cases for UL MIMO in FR2 CR

revised to R5-211865

Sporton 38.521-2 16.6.0 CR#475 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211028 Addition of new test case 6.2A.1.1.4 UE maximum output power - EIRP and TRP for 5UL CA CR

revised to R5-211688

KTL 38.521-2 16.6.0 CR#476 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211029 Addition of new test case 6.2A.1.1.5 UE maximum output power - EIRP and TRP for 6UL CA CR

revised to R5-211689

KTL 38.521-2 16.6.0 CR#477 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211030 Addition of new test case 6.2A.1.1.6 UE maximum output power - EIRP and TRP for 7UL CA CR

revised to R5-211690

KTL 38.521-2 16.6.0 CR#478 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211031 Addition of new test case 6.2A.1.1.7 UE maximum output power - EIRP and TRP for 8UL CA CR

revised to R5-211691

KTL 38.521-2 16.6.0 CR#479 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211093 Correction to ACLR relaxation value in TC 6.5.2.3 CR

revised to R5-211921

Anritsu 38.521-2 16.6.0 CR#480 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211094 Correction to assumption of aggregated channel bandwidth in TC 6.5A.2.2 CR Anritsu 38.521-2 16.6.0 CR#481 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211095 Correction to definition of power control window size in FR2 relative power tolerance in TC 6.3.4.3 CR

revised to R5-211866

Anritsu 38.521-2 16.6.0 CR#482 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211097 Definition of relaxation value of spurious emissions UE co-existence in TC 6.5.3.2 CR Anritsu 38.521-2 16.6.0 CR#484 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211110 Corrections to subclauses in 38.521-2 with appropriate subclause level and heading styles CR ZTE Corporation 38.521-2 16.6.0 CR#486 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211114 Corrections to reference figures for transmission bandwidth configuration in FR2 CR

revised to R5-211692

ZTE Corporation 38.521-2 16.6.0 CR#487 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211231 FR2 Tx additional spurious emission test case updates CR

revised to R5-211867

Qualcomm Finland RFFE Oy 38.521-2 16.6.0 CR#491 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

revised [WTS] [JSN]
R5-211683 Editorial corrections in Occupied bandwidth test procedure CR

revision of R5-210297

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#4561 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211684 FR2 UL CA Frequency error test cases update CR

revision of R5-210543

Keysight Technologies UK Ltd 38.521-2 16.6.0 CR#4651 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211685 Addition of Inner_partial allocation in general section and a few test cases CR

revision of R5-210727

Huawei, HiSilicon, Keysight 38.521-2 16.6.0 CR#4691 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211686 Correction of parameter configuration for open loop power control CR

revision of R5-210728

Huawei, HiSilicon 38.521-2 16.6.0 CR#4701 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211688 Addition of new test case 6.2A.1.1.4 UE maximum output power - EIRP and TRP for 5UL CA CR

revision of R5-211028

KTL 38.521-2 16.6.0 CR#4761 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211689 Addition of new test case 6.2A.1.1.5 UE maximum output power - EIRP and TRP for 6UL CA CR

revision of R5-211029

KTL 38.521-2 16.6.0 CR#4771 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211690 Addition of new test case 6.2A.1.1.6 UE maximum output power - EIRP and TRP for 7UL CA CR

revision of R5-211030

KTL 38.521-2 16.6.0 CR#4781 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211691 Addition of new test case 6.2A.1.1.7 UE maximum output power - EIRP and TRP for 8UL CA CR

revision of R5-211031

KTL 38.521-2 16.6.0 CR#4791 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211692 Corrections to reference figures for transmission bandwidth configuration in FR2 CR

revision of R5-211114

ZTE Corporation 38.521-2 16.6.0 CR#4871 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211863 FR2 MPR, ACLR and SEM test cases update as per TP analysis update CR

revision of R5-210547

Keysight Technologies UK Ltd, Ericsson, CAICT 38.521-2 16.6.0 CR#4661 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211864 Cleaning up of FR2 test specification CR

revision of R5-210730

Huawei, HiSilicon 38.521-2 16.6.0 CR#4721 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211865 Update of TX Test Cases for UL MIMO in FR2 CR

revision of R5-210893

Sporton 38.521-2 16.6.0 CR#4751 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211866 Correction to definition of power control window size in FR2 relative power tolerance in TC 6.3.4.3 CR

revision of R5-211095

Anritsu 38.521-2 16.6.0 CR#4821 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211867 FR2 Tx additional spurious emission test case updates CR

revision of R5-211231

Qualcomm Finland RFFE Oy 38.521-2 16.6.0 CR#4911 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]
R5-211921 Correction to ACLR relaxation value in TC 6.5.2.3 CR

revision of R5-211093

Anritsu 38.521-2 16.6.0 CR#4801 catF 5GS_NR_LTE-UEConTest Rel-16 R5-90-e

AI: 5.3.2.5.1

agreed [WTS] [JSN]

38 documents (0.35224795341492 seconds)