Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-201598 Correction of lower limit for test ID 55 in test 6.2.3 CR Keysight Technologies UK Ltd 38.521-1 16.3.0 CR#836 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201599 Correction on how to modify P-Max in test 6.2.4 and 6.2D.4 CR Keysight Technologies UK Ltd 38.521-1 16.3.0 CR#837 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-201732 Update of Test requirement of NS_100 in NR test case 6.2.3 A-MPR CR Huawei,Hisilicon 38.521-1 16.3.0 CR#839 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-201733 Update of NR test case 6.2A.3 AMPR for CA CR

revised to R5-202710

Huawei,Hisilicon 38.521-1 16.3.0 CR#840 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201734 Addition of NR test case 6.3C.1 Minimum output power for SUL CR Huawei,Hisilicon 38.521-1 16.3.0 CR#841 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201735 Addition of NR test case 6.3C.2 Transmit OFF power for SUL CR Huawei,Hisilicon 38.521-1 16.3.0 CR#842 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201736 Addition of NR test case 6.3C.3 Transmit ON/OFF time mask for SUL CR Huawei,Hisilicon 38.521-1 16.3.0 CR#843 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201737 Addition of NR test case 6.3C.4.1-Absolute power tolerance for SUL CR

revised to R5-202711

Huawei,Hisilicon 38.521-1 16.3.0 CR#844 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201738 Addition of NR test case 6.3C.4.2 Power Control Relative power tolerance for SUL CR

revised to R5-202712

Huawei,Hisilicon 38.521-1 16.3.0 CR#845 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201739 Addition of NR test case 6.3C.4.3 Aggregate power tolerance for SUL CR Huawei,Hisilicon 38.521-1 16.3.0 CR#846 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201740 Update of NR test case 6.5.2.4 ACLR CR

revised to R5-202713

Huawei,Hisilicon 38.521-1 16.3.0 CR#847 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201741 Update of NR test case 6.5C.3.3-Additional spurious emissions for SUL CR Huawei,Hisilicon 38.521-1 16.3.0 CR#848 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201763 Aligning A-MPR clause with TS 38.101-1 Rel-15 CR

revised to R5-202886

Ericsson 38.521-1 16.3.0 CR#860 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201766 Update of test case 6.2.3 UE A_MPR, NS_40 CR

revised to R5-202821

Ericsson 38.521-1 16.3.0 CR#862 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201768 Update of test case 6.2.3 UE A_MPR, NS_41 CR

revised to R5-202822

Ericsson 38.521-1 16.3.0 CR#863 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201770 Update of test case 6.2.3 UE A_MPR, NS_42 CR

revised to R5-202714

Ericsson 38.521-1 16.3.0 CR#864 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201833 Update of Refsense requirements for n79 CR Rohde & Schwarz 38.521-1 16.3.0 CR#867 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201845 Editorial correction of 6.2.1 test requirements CR Huawei, HiSilicon 38.521-1 16.3.0 CR#871 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201846 Updating 6.2.1 to add test method for UEs with 2 Tx antennas CR Huawei, HiSilicon 38.521-1 16.3.0 CR#872 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

not pursued [WTS] [JSN]
R5-201847 Updating 6.3.4.3 alternating sub-test CR Huawei, HiSilicon 38.521-1 16.3.0 CR#873 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-201935 Updates to test case 6.2.2 UE maximum output power reduction CR Ericsson 38.521-1 16.3.0 CR#878 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-201936 Updates to test case 6.5.2.4.1, NR ACLR CR

revised to R5-202940

Ericsson 38.521-1 16.3.0 CR#879 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-201937 Updates to test case 6.5.2.2, Spectrum Emission Mask CR

revised to R5-202765

Ericsson 38.521-1 16.3.0 CR#880 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202110 NS_05 corrections related to n65 CR

revised to R5-202887

Dish Network 38.521-1 16.3.0 CR#894 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202172 correction 6.5.3.1.3 general spurious emission limits CR T-Mobile USA Inc. 38.521-1 16.3.0 CR#895 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-202188 Corrections on network signalling value abbreviation in 38.521-1 CR

revised to R5-202888

ZTE Corporation 38.521-1 16.3.0 CR#896 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202206 Corrections on NS signalling label for band n39 in 38.521-1 CR

revised to R5-202889

ZTE Corporation, Ericsson, Qualcomm, China Unicom, Bureau Veritas, Huawei, Hisilicon 38.521-1 16.3.0 CR#897 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202211 Correct power window size to 6.4.2.2 CR Guangdong OPPO Mobile Telecom. 38.521-1 16.3.0 CR#898 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

withdrawn [WTS] [JSN]
R5-202217 Corrections on transmitter power for CA in 38.521-1 CR ZTE Corporation 38.521-1 16.3.0 CR#899 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202287 Correction on txDirectCurrentLocation in FR1 SA tests CR

revised to R5-202890

Anritsu 38.521-1 16.3.0 CR#900 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202420 Update Uplink power control window size for SA TX TCs CR

revised to R5-202715

QUALCOMM Europe Inc. - Italy, OPPO 38.521-1 16.3.0 CR#905 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202427 Update for 6.5.3.3 Additional spurious emissions CR

revised to R5-202823

QUALCOMM Europe Inc. - Italy 38.521-1 16.3.0 CR#908 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202431 Update for 6.5.3.1 General spurious emissions CR

revised to R5-202716

QUALCOMM Europe Inc. - Italy, T-Mobile USA 38.521-1 16.3.0 CR#910 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202435 Updated MOP UL MIMO test case to include steps for per port testing CR

revised to R5-202891

QUALCOMM JAPAN LLC. 38.521-1 16.3.0 CR#911 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

revised [WTS] [JSN]
R5-202710 Update of NR test case 6.2A.3 AMPR for CA CR

revision of R5-201733

Huawei,Hisilicon 38.521-1 16.3.0 CR#8401 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202711 Addition of NR test case 6.3C.4.1-Absolute power tolerance for SUL CR

revision of R5-201737

Huawei,Hisilicon 38.521-1 16.3.0 CR#8441 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202712 Addition of NR test case 6.3C.4.2 Power Control Relative power tolerance for SUL CR

revision of R5-201738

Huawei,Hisilicon 38.521-1 16.3.0 CR#8451 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202713 Update of NR test case 6.5.2.4 ACLR CR

revision of R5-201740

Huawei,Hisilicon 38.521-1 16.3.0 CR#8471 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202714 Update of test case 6.2.3 UE A_MPR, NS_42 CR

revision of R5-201770

Ericsson 38.521-1 16.3.0 CR#8641 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202715 Update Uplink power control window size for SA TX TCs CR

revision of R5-202420

QUALCOMM Europe Inc. - Italy, OPPO 38.521-1 16.3.0 CR#9051 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202716 Update for 6.5.3.1 General spurious emissions CR

revision of R5-202431

QUALCOMM Europe Inc. - Italy, T-Mobile USA 38.521-1 16.3.0 CR#9101 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202765 Updates to test case 6.5.2.2, Spectrum Emission Mask CR

revision of R5-201937

Ericsson 38.521-1 16.3.0 CR#8801 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202821 Update of test case 6.2.3 UE A_MPR, NS_40 CR

revision of R5-201766

Ericsson 38.521-1 16.3.0 CR#8621 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202822 Update of test case 6.2.3 UE A_MPR, NS_41 CR

revision of R5-201768

Ericsson 38.521-1 16.3.0 CR#8631 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202823 Update for 6.5.3.3 Additional spurious emissions CR

revision of R5-202427

QUALCOMM Europe Inc. - Italy 38.521-1 16.3.0 CR#9081 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202886 Aligning A-MPR clause with TS 38.101-1 Rel-15 CR

revision of R5-201763

Ericsson 38.521-1 16.3.0 CR#8601 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202887 NS_05 corrections related to n65 CR

revision of R5-202110

Dish Network 38.521-1 16.3.0 CR#8941 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202888 Corrections on network signalling value abbreviation in 38.521-1 CR

revision of R5-202188

ZTE Corporation 38.521-1 16.3.0 CR#8961 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202889 Corrections on NS signalling label for band n39 in 38.521-1 CR

revision of R5-202206

ZTE Corporation, Ericsson, Qualcomm, China Unicom, Bureau Veritas, Huawei, Hisilicon 38.521-1 16.3.0 CR#8971 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202890 Correction on txDirectCurrentLocation in FR1 SA tests CR

revision of R5-202287

Anritsu 38.521-1 16.3.0 CR#9001 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202891 Updated MOP UL MIMO test case to include steps for per port testing CR

revision of R5-202435

QUALCOMM JAPAN LLC. 38.521-1 16.3.0 CR#9111 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]
R5-202940 Updates to test case 6.5.2.4.1, NR ACLR CR

revision of R5-201936

Ericsson 38.521-1 16.3.0 CR#8791 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-38102

AI: 5.3.2.4.1

agreed [WTS] [JSN]

52 documents (0.33466792106628 seconds)