Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-200047 Update TPanalysis of TC 7.5B.1 ACS for for intra-band contiguous EN-DC within FR1 2CCs CR CMCC 38.905 16.2.0 CR#214 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

withdrawn [WTS] [JSN]
R5-200402 Updating TP of MOP for inter-band EN-DC CR Huawei, HiSilicon 38.905 16.2.0 CR#215 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200403 Updating TP of configured output power for inter-band EN-DC CR

revised to R5-201182

Huawei, HiSilicon 38.905 16.2.0 CR#216 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

revised [WTS] [JSN]
R5-200406 Updating TP of MOP for intra-band contiguous EN-DC CR Huawei, HiSilicon 38.905 16.2.0 CR#217 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

withdrawn [WTS] [JSN]
R5-200407 Updating TP of configured output power for intra-band contiguous EN-DC CR

revised to R5-201184

Huawei, HiSilicon 38.905 16.2.0 CR#218 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

revised [WTS] [JSN]
R5-200410 Updating TP of MOP for intra-band non-contiguous EN-DC CR Huawei, HiSilicon 38.905 16.2.0 CR#219 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

withdrawn [WTS] [JSN]
R5-200411 Updating TP of configured output power for intra-band non-contiguous EN-DC CR

revised to R5-201186

Huawei, HiSilicon 38.905 16.2.0 CR#220 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

revised [WTS] [JSN]
R5-200412 Editorial change of replacing zip file of FR2 6.3.1 by v2 CR Huawei, HiSilicon 38.905 16.2.0 CR#221 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200419 Update of test point analysis for 7.6A.3 Out-of-band blocking for CA CR CAICT 38.905 16.2.0 CR#222 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200459 Update of test point analysis for 7.6A.4 Narrow band blocking for CA CR CAICT 38.905 16.2.0 CR#223 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200460 Update of test point analysis for 7.8A Wide band Intermodulation for CA CR CAICT 38.905 16.2.0 CR#224 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200573 Update of 38.905 FR1 7.6A.2.1 CR Huawei,Hisilicon 38.905 16.2.0 CR#225 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

withdrawn [WTS] [JSN]
R5-200574 Addition of Test point selection for FR1 in SUL test cases CR Huawei,Hisilicon 38.905 16.2.0 CR#226 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200603 Test Point analysis for FR2 ref sens for CA CR Qualcomm Finland RFFE Oy 38.905 16.2.0 CR#227 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200758 Correction of NS_05 test points analysis CR Ericsson 38.905 16.2.0 CR#229 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200760 Test points analysis for NS_37 A-MPR FR1 test case CR

revised to R5-201237

Ericsson 38.905 16.2.0 CR#230 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

revised [WTS] [JSN]
R5-200762 Test points analysis for NS_38 A-MPR FR1 test case CR Ericsson 38.905 16.2.0 CR#231 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200764 Test points analysis for NS_39 A-MPR FR1 test case CR Ericsson 38.905 16.2.0 CR#232 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200766 Test points analysis for NS_43 A-MPR FR1 test case CR Ericsson, SoftBank Corp. 38.905 16.2.0 CR#233 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200768 Test points analysis for NS_43U A-MPR FR1 test case CR Ericsson, SoftBank Corp. 38.905 16.2.0 CR#234 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200770 Test points analysis for NS_18 A-MPR FR1 test case CR

revised to R5-201239

Ericsson 38.905 16.2.0 CR#235 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

revised [WTS] [JSN]
R5-200799 Updated test point analysis for FR2 A-MPR test case CR Ericsson 38.905 16.2.0 CR#236 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200815 Update of Test Point Analysis for UE Coexistence for DC_3A-n41A and DC_8A-n41A CR ROHDE & SCHWARZ 38.905 16.2.0 CR#237 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-200885 Addition of TP analysis for FR1 In-band blocking for CA CR

revised to R5-200990

Huawei,Hisilicon 38.905 16.2.0 CR#238 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

revised [WTS] [JSN]
R5-200990 Addition of TP analysis for FR1 In-band blocking for CA CR

revision of R5-200885

Huawei,Hisilicon 38.905 16.2.0 CR#2381 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-201182 Updating TP of configured output power for inter-band EN-DC CR

revision of R5-200403

Huawei, HiSilicon 38.905 16.2.0 CR#2161 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-201184 Updating TP of configured output power for intra-band contiguous EN-DC CR

revision of R5-200407

Huawei, HiSilicon 38.905 16.2.0 CR#2181 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-201186 Updating TP of configured output power for intra-band non-contiguous EN-DC CR

revision of R5-200411

Huawei, HiSilicon 38.905 16.2.0 CR#2201 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-201237 Test points analysis for NS_37 A-MPR FR1 test case CR

revision of R5-200760

Ericsson 38.905 16.2.0 CR#2301 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]
R5-201239 Test points analysis for NS_18 A-MPR FR1 test case CR

revision of R5-200770

Ericsson 38.905 16.2.0 CR#2351 catF 5GS_NR_LTE-UEConTest Rel-16 R5-ah-34837

AI: 5.3.2.16

agreed [WTS] [JSN]

30 documents (0.34718799591064 seconds)