Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R5-168017 | Discussion of MBS Test Tolerances and Test System Uncertainties | discussion | NextNav, Broadcom | Rel-13 |
R5-73 AI: 5.3.16.5 |
noted | [WTS] [JSN] | ||
| R5-168018 | Addition of test tolerances to the performance test specification for Indoor Positioning Enhancements (MBS) |
CR revised to R5-169602 |
NextNav, Broadcom | 37.571-1 13.1.0 CR#184 catF | UTRA_LTE_iPos_enh-UEConTest | Rel-13 |
R5-73 AI: 5.3.16.5 |
revised | [WTS] [JSN] |
| R5-168147 | Corrections for errors in 37.571-1 | CR | NextNav, Broadcom | 37.571-1 13.1.0 CR#187 catF | UTRA_LTE_iPos_enh-UEConTest | Rel-13 |
R5-73 AI: 5.3.16.5 |
agreed | [WTS] [JSN] |
| R5-168900 | Clarification of MBS beacon code phase delay |
CR revised to R5-169611 |
Spirent Communications | 37.571-1 13.1.0 CR#190 catF | UTRA_LTE_iPos_enh-UEConTest | Rel-13 |
R5-73 AI: 5.3.16.5 |
revised | [WTS] [JSN] |
| R5-168901 | Spirent comments on MBS Test Tolerances |
discussion revised to R5-169603 |
Spirent Communications | UTRA_LTE_iPos_enh-UEConTest |
R5-73 AI: 5.3.16.5 |
revised | [WTS] [JSN] | ||
| R5-169602 | Addition of test tolerances to the performance test specification for Indoor Positioning Enhancements (MBS) |
CR revision of R5-168018 |
NextNav, Broadcom | 37.571-1 13.1.0 CR#1841 catF | UTRA_LTE_iPos_enh-UEConTest | Rel-13 |
R5-73 AI: 5.3.16.5 |
agreed | [WTS] [JSN] |
| R5-169603 | Spirent comments on MBS Test Tolerances |
discussion revision of R5-168901 |
Spirent Communications | UTRA_LTE_iPos_enh-UEConTest |
R5-73 AI: 5.3.16.5 |
noted | [WTS] [JSN] | ||
| R5-169611 | Clarification of MBS beacon code phase delay |
CR revision of R5-168900 |
Spirent Communications | 37.571-1 13.1.0 CR#1901 catF | UTRA_LTE_iPos_enh-UEConTest | Rel-13 |
R5-73 AI: 5.3.16.5 |
agreed | [WTS] [JSN] |
8 documents (0.39189100265503 seconds)