Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R5-180362 Discussion on 5G-NR Anchor Agnostic REFSENS test case for NR interworking conformance spec 38.521-3 discussion Qualcomm UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-180366 Discussion on first priority test cases in 38.521-2 discussion CATR R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-180735 REFSENS test scope and approach for interworking spec 38.521-3 discussion

revised to R5-181682

Qualcomm UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

revised [WTS] [JSN]
R5-180805 Discussion on Mid test channel BW definition for NR bands discussion

revised to R5-181500

Ericsson 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

revised [WTS] [JSN]
R5-180885 Discussion on test point selection for NR Occupied Bandwidth in FR1 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-180886 Discussion on test point selection for NR SEM in FR1 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-180887 Discussion on test point selection for NR ACLR in FR1 discussion Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-180888 Discussion on test configuration table format for TS 38.521-1 non-CA discussion

revised to R5-181669

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

revised [WTS] [JSN]
R5-180982 Discussion on mmWave demod testing discussion Qualcomm UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-180983 On Sub-6 NR TRx MU justification and way forwards discussion

revised to R5-181502

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

revised [WTS] [JSN]
R5-180984 On the testability for low PSD FR2 test cases discussion

revised to R5-181503

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

revised [WTS] [JSN]
R5-180985 Review of TS 34.114, EN 301 908-1 and TS 36.124 discussion

revised to R5-181504

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

revised [WTS] [JSN]
R5-180986 On the NR FR2 spurious test procedure discussion Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

withdrawn [WTS] [JSN]
R5-180987 On the link budget for NR FR2 demod test setup discussion

revised to R5-181691

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

revised [WTS] [JSN]
R5-180988 Discussion on mmWave RRM testing discussion Qualcomm UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181009 Discussion about Test environment for FR2 RF TCs discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181010 Discussion about Test frequency for NR RF TCs discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181011 Discussion about Test bandwidth and SCS for NR RF TCs discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181012 Test Tolerance for FR2 RF TCs discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181076 On Measurement Uncertainty for FR1 discussion

revised to R5-181692

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

revised [WTS] [JSN]
R5-181083 Test RB in FR1 RF TCs discussion NTT DOCOMO, INC. 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

withdrawn [WTS] [JSN]
R5-181095 Discussion on mmWave RRM test areas discussion Qualcomm UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

withdrawn [WTS] [JSN]
R5-181500 Discussion on Mid test channel BW definition for NR bands discussion

revision of R5-180805

Ericsson 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181502 On Sub-6 NR TRx MU justification and way forwards discussion

revision of R5-180983

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181503 On the testability for low PSD FR2 test cases discussion

revision of R5-180984

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181504 Review of TS 34.114, EN 301 908-1 and TS 36.124 discussion

revision of R5-180985

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181524 Discussion on test point selection for Absolute Power Tolerance in FR1 discussion Intel 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181525 Discussion on test point selection for Aggregate Power Tolerance in FR1 discussion Intel 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181669 Discussion on test configuration table format for TS 38.521-1 non-CA discussion

revision of R5-180888

Keysight Technologies UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181682 REFSENS test scope and approach for interworking spec 38.521-3 discussion

revision of R5-180735

Qualcomm UK Ltd 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181691 On the link budget for NR FR2 demod test setup discussion

revision of R5-180987

Anritsu 5GS_NR_LTE-UEConTest Rel-15 R5-78

AI: 5.3.16.16

noted [WTS] [JSN]
R5-181692 On Measurement Uncertainty for FR1 discussion

revision of R5-181076

ROHDE & SCHWARZ 5GS_NR_LTE-UEConTest R5-78

AI: 5.3.16.16

noted [WTS] [JSN]

32 documents (0.34135103225708 seconds)